    1. The reserve fund shall not be less than 500,000 yuan (now it can be invested in installments, and there is no need to pay it all at once). 2. To rent a venue, you must sign a site use (rent) agreement, and you can also use your own house. At the same time, it is necessary to prepare some personnel.

    3. Apply for pre-registration of the name to the industry and commerce, and after the pre-registration is approved, prepare the articles of association of the company, and transfer the registered capital to the designated account. Fourth, ask the accounting firm to issue a capital verification report. 5. Go to the industrial and commercial bureau to fill in the relevant **, you will be asked to provide relevant information such as the resolution of the shareholders' meeting, the resolution of the board of directors, etc., which have samples, and you can fill them in.

    6. After the industrial and commercial registration is approved, it is necessary to open a bank account, register for taxation, and receive invoices. Seventh, the next step is how to organize production and operation.

  2. Anonymous users2024-02-11

    The construction of water plants not only requires funds, venues, hardware equipment, etc., but more importantly, it is necessary to keep up with the pace of the times and combine the current policies to carry out the construction of scientific and technological, intelligent and integrated water plants. The intelligent integrated water plant built by Wipaig Smart Water is based on the integrated modular water plant, equipped with an intelligent dosing system, and automatically adjusts the dosage according to the quality of the raw water to achieve the economic operation of the product. The water plant is also equipped with a raw water quality monitoring and early warning management system, which monitors the water quality in real time and gives timely warning to ensure the safety and reliability of the produced water.

    It not only solves the technical problems faced from design, manufacturing to later operation and maintenance, but also realizes intelligent remote control by combining the overall configuration with the intelligent management and control platform of the water plant and the smart water platform, and can also realize visual management and less people on duty.

  3. Anonymous users2024-02-10

    For pure water plants, you need to apply for 1, production license, 2, health license, 3, employee health certificate, 4, and finally a water quality report.

    For natural mineral water, you need to apply for 1, production license, 2, water intake license, 3, mining license, 4, health license, 5, employee health certificate.

    For the requirements of the factory, it seems that the minimum space is 150 square meters, of course, there may be differences in different places.

    In terms of funding, it mainly depends on your scale, but the equipment for mineral water will be much cheaper for the same scale.

    Of course, this is the requirement of regular manufacturers.

  4. Anonymous users2024-02-09

    Here's how:

    1. First of all, you need to put a large container of water at the highest point of the room.

    2. Connect a water pump at the water inlet, and the switch part can be manually controlled or equipped with an automatic control system.

    3. The advantage of manual control is that the installation cost is low, but it is easy to cause overflow. Automatic control systems can avoid this problem, but the installation cost is higher.

    4. The water outlet hole of the bucket is generally divided into two branches, one of which is directly connected to the water pipe of the family to provide cold water for daily life; The other one is connected to a solar water heater.

    , through solar energy to provide services for daily use of hot water.

  5. Anonymous users2024-02-08

    If you buy a bungalow, you can buy a thermal water tank and put it on the roof, and you can lead the water pipe down, not a bungalow to make a single shelf to put the insulated water tank on it, higher than the roof, and when there is water in the village, you can find a water pump to pump it into the water tank! The insulated water tank is sold on a treasure. The total cost can be done within 5,000!

  6. Anonymous users2024-02-07

    There is a running water system everywhere in the countryside. If there may not be one in a very remote place, a well will need to be drilled to get water for drinking.

  7. Anonymous users2024-02-06

    Just find a worker to install it.

  8. Anonymous users2024-02-05

    Nowadays, with the rapid development of rural areas and the continuous housing prices in cities, more and more young people choose to go home and build houses instead of buying houses in the city as before. Year. Building a favorite house at home has become the choice of many young people who go out.

    The issue of water for self-built houses is very important. In rural areas, water and electricity have been uneven. The problem of power supply is largely not a problem, but the solution to water supply is not satisfactory.

    A considerable number of rural households have not yet opened running water, even if the water pressure of the households with running water is insufficient or the water supply is supplied at different times, so many rural people still choose to dig their own wells to pump water, which is quite inconvenient. Today, I will introduce you to several water supply methods for self-built houses. A pressure tank is the most convenient solution:

    Without running water, you need to dig your own wells, pump the water, and store it in tanks or buckets for household use. In this case, we need to solve the problem of how to provide a stable and continuous water supply pressure for households, meet the water supply needs of electrical appliances such as solar washing machines, and avoid secondary pollution by traditional water storage methods. Two solutions are given.

    One: Choose a pressure tank. The working principle of the pressure tank is to use a water pump to pump water into the pressure tank, and then pressurize the water in the tank through the principle of compressed air.

    In this way, the water coming out of the tank is pressurized, and it is easy to finish building with water or solar energy. The advantage of this scheme is that the whole water use process is closed, and there will be no secondary pollution in the water use process, that is to say, it will not be secondary pollution by foreign bodies, as long as the problem is to solve the problem of the material of the pressure tank itself. Well, 304 food-grade stainless steel is generally chosen.

    There are no rigid requirements for the installation position of the pressure tank, and the advantage of this method is that it is easy to install. Because the pressure tank itself is pressurized by compressed air, the installation site requirements of the pressure tank are very low, and there is no need for a traditional water tank. It is also installed on the roof or at a height, pressurized by the height difference.

    In other words, we built a small water plant for our own use, with a pressure tank and pump, and even a simple filtration device at the entrance of the pressure tank to ensure the safety of the water quality. What kind of water supply effect will we have after the installation is completed? Every faucet in the home, whether upstairs or downstairs, will ensure that there is water 24 hours a day, and water equipment such as solar energy can also ensure sufficient water pressure.

    And because the pressure tank will be equipped with equipment such as pressure tank pressure switch and pressure gauge, when the pressure in the pressure tank drops, that is, the water storage decreases, the pressure switch will control the water pump to replenish the pressure tank itself, so we also solve this problem. It eliminates the need to switch the pump to pump water and provides automatic water supply. The pressure generated is enough for the washing machine to run on solar energy.

    2. Select the water tank for water supply. This is a more traditional way of water supply. The water tank is placed higher than the water supply position and is supplied through the water level drop.

  9. Anonymous users2024-02-04

    Summary. Water purification process of waterworks: 1. After taking water, flocculant is added to react and adsorb impurities in the water.

    2. Leave the water to settle down. 3. It is further filtered through a filter tank equipped with quartz sand, activated carbon and other filter materials. 4. Chlorination and disinfection before leaving the factory.

    5. Convey to the home through the pipeline.

    Water purification process of waterworks: 1. After taking water, flocculant is added to react and adsorb impurities in the water. 2. Leave the water to settle down.

    3. It is further filtered through a filter tank equipped with filter materials such as Shiqi Lingying sand source air brigade and activated carbon. 4. Chlorination and disinfection before leaving the factory. 5. Convey to the home through the pipe hail stool channel.

    Tap water refers to the water produced by the tap water treatment plant after purification and disinfection that meets the corresponding standards for people's life and production. The tap water is treated by the waterworks in accordance with the "National Sanitary Standards for Drinking Water", through sedimentation, disinfection, filtration and other processes, and finally delivered to various users through the water distribution pumping station. Most of the tap water disinfection is chlorinated, and the main purpose of chlorinated reed ears is to prevent water-borne diseases.

    The world's safest way to disinfect tap water is ozone, but it is too expensive.

  10. Anonymous users2024-02-03

    Summary. Required information: 1. Unit:

    1) A copy of the applicant's ID card; (2) Architectural planning drawings and water supply design drawings (development projects); 3) Application report for tap water installation; (4) Separate building and strata roster; (5) Organizational structure**; (6) Tax registration; (7) Business license. 2. Individual: real estate certificate (4) Charging basis and standard:

    According to the actual amount of the project, it is calculated according to the 2006 consumption quota. (5) Time limit for processing: The statutory time limit is 15 working days, and the materials are complete, and the processing will be completed within 8 working days.

    6) Handling process: 1. Acceptance: Check whether the application materials are complete, meet the water supply conditions and all procedures are complete, and accept them.

    2. Review: Review the legality and authenticity of the materials submitted by the applicant, and if supplementary information is required, the staff will inform the applicant of all the materials that need to be supplemented at one time. 3. Survey and design budget:

    After the account opening application materials are complete, the survey and design staff shall conduct on-site investigation of the water project in accordance with the relevant regulations, give the water supply pipeline design and project budget and final accounts if they meet the requirements, determine the construction funds, sign the construction contract and water supply contract, and notify the applicant to pay the fee. 4. Construction: After the user signs the water supply and construction contract, and pays the relevant fees, the user organizes the construction, acceptance, and installation of the metering device (water meter) for delivery, supply (delivery) of water.

    Required information: 1. Unit: (1) A copy of the applicant's ID card; (2) Architectural planning drawings and rough water supply design drawings (development projects); 3) Application report for tap water installation; (4) Separate building and strata roster; (5) Organizational structure**; (6) Tax registration; (7) Business license.

    2. Individual: real estate certificate (4) Charging basis and standard: calculated according to the actual amount of the project according to the 2006 consumption quota.

    (5) Time limit for processing: The statutory time limit is 15 working days, and the materials are complete, and the processing will be completed within 8 working days. (6) Handling process:

    1. Acceptance: Check whether the application materials are complete, meet the water supply conditions and all procedures are complete, and accept them. 2. Review:

    The legality and authenticity of the materials submitted by the applicant shall be reviewed, and if supplementary materials are required, the staff shall inform the applicant of all the materials that need to be supplemented at one time. 3. Survey and design budget: After the account opening application information is complete, the survey and design staff shall conduct on-site survey of the water project in accordance with the relevant regulations, give the water supply pipeline design and project budget and final accounts if qualified, determine the construction funds, sign the construction contract and water supply contract, and notify the applicant to pay the fee.

    4. Construction: The user signs the water supply and construction contract, pays the relevant fees, and organizes the construction, acceptance, installation of metering devices (water meters) delivery, and water supply (delivery).

    Since the industry belongs to the Wu Zhaoluo people's livelihood project and involves the protection of the people's right to health, in accordance with the water supply regulations and the relevant provisions of drinking water, it is necessary to compete in accordance with the law to obtain the franchise right before the water supply company can be opened.

    Open a waterworks?

    Yes! Kiss. You're a personal one, right?

  11. Anonymous users2024-02-02

    Hello, dear. The senior of the car cavity has found the following information for you, you can understand it first, and the following permit procedures are required to do the waterworks: 1

    Production License, QS"Certification (Provincial Bureau of Quality and Technical Supervision) 2Food Hygiene License (Municipal Food Hygiene Supervision Institute) 3Practitioner's Health Certificate (Health Supervision Institute) 4

    Tax registration 5Industrial and commercial registration (business license) 6Water Quality Inspection Report (Food Sanitation Supervision Institute) 7

    EIA approval (Environmental Protection Bureau or Safety Supervision Bureau) The production environment, plant construction, equipment licensing, personnel health and other aspects meet the requirements of relevant laws and regulations. In addition to the relevant procedures for normal enterprise registration, the waterworks need to add relevant licenses for the food industry. Extended Resources:

    Process flow: 1Raw water (may need to be pressurized by a primary pump) - sedimentation tank - filter - clear reservoir (chlorinated and disinfected, secondary pump pressurization may be required) - pipe network - user Note:

    The filter tank has V-shaped filter closed brigade shirt, gravity valveless filter, etc., and the sedimentation tank has inclined tube sedimentation, advection sedimentation and so on. Required equipment: water pump, chlorinator or chlorine dioxide generator, flocculation dosing machine, and the water plant with automatic control must also be equipped with an automatic control system.

    I hope mine can help you

  12. Anonymous users2024-02-01

    Summary. Production License, QS"Certification (Provincial Bureau of Quality and Technical Supervision) Food Hygiene License (Municipal Food Hygiene Supervision Institute).

    Practitioner's health certificate (Health Supervision Institute).

    Tax registration. Industrial and commercial registration (business license).

    Water quality inspection report (Food Sanitation Supervision Institute).

    EIA approval (Environmental Protection Bureau or Work Safety Supervision Bureau).

    The production environment, plant construction, equipment licensing, personnel health and other aspects meet the requirements of relevant laws and regulations.

    What are the procedures for running a self-operated waterworks?

    Hello. Production License, QS"Certification (Provincial Bureau of Quality and Technical Supervision) Food Hygiene License (Municipal Food Hygiene Supervision Institute).

    Practitioner's health certificate (Health Supervision Institute).

    Tax registration. Industrial and commercial registration (business license).

    Water quality inspection report (Food Sanitation Supervision Institute).

    EIA approval (Environmental Protection Bureau or Work Safety Supervision Bureau).

    The production environment, plant construction, equipment licensing, personnel health and other aspects meet the requirements of relevant laws and regulations.

    Have a great day.

    If you are satisfied with me, please give it a thumbs up.

Related questions
7 answers2024-06-28

The internship period is 3 months, generallyBase salaryAt 1,000-2,000 yuan, the basic salary is more than 3,000-4,000 yuan after the internship period. The post subsidy depends on the specific situation of each unit. >>>More

5 answers2024-06-28

Legal analysis: 1. The following documents must be obtained: 1. "Production License", "SC Certification" (formerly called "QS") Quality and Technical Supervision Bureau. >>>More

7 answers2024-06-28

One. Purpose of Internship:

1.Lay the foundation for future professional learning through the acquaintance internship. >>>More

11 answers2024-06-28

Here's how:

1. First of all, you need to put a large container of water at the highest point of the room. >>>More

3 answers2024-06-28

When buying water pipes, you should pay attention to the most direct ways to start with the most direct ways to identify the quality of water pipes, mainly from the following aspects, you can learn from them. The first is "touch": whether the texture is delicate and whether the particles are uniform. >>>More