One. Purpose of Internship:
1.Lay the foundation for future professional learning through the acquaintance internship.
2.Through practice, the water conservancy and hydropower engineering model is established in the brain.
3.Understand the basic composition and role of water conservancy and hydropower projects through internship.
4.Learn about the characteristics and functions of hydraulic buildings through internships.
5.Through internships, students will learn about water conservancy planning, design, construction, management and utilization.
6.Learn about hydraulic engineering expertise and hydraulic construction through concrete examples of internships.
Two. Internship content:
1) Baoji Gorge Hub Project.
1.Baoji Gorge Irrigation Project.
1.1 billion m3 River source water: 100 million m3 Irrigation area: 10,000 mu Engineering characteristics:
The head of the canal is a low dam for artesian water diversion. In the irrigation area, there are Wangjiaya, Xinyi ditch, dam ditch, swill river and other canal reservoirs, and the reservoir forms a long vine and melon type water diversion, with an annual adjustable water volume of 100 million m3. The total length of the main canal is 180km, of which 98km is the loess plateau side channel.
Project evolution: The project started in November 1958, stopped construction in 1962, resumed work in 1968, opened to water in July 1971, and the designed irrigation area was 1.7 million mu, and then the Weigao Weihui Canal irrigation area was included in the unified management, with a total area of 10,000 mu, including 10,000 mu on the plateau. In order to solve the shortage of irrigation water, in 1997, the head of the canal dam began to be heightened and the sluice was comprehensively reconstructed, and the storage capacity of 50 million m3 can be formed after the sluice, and the annual adjustable water volume is 100 million m3, and the storage capacity of the four reservoirs is increased by 100 million m
2.Baoji Gorge Gate Project.
Original dam height: 27m Dam height plus gate: original dam height: m) Storage capacity:
50 million m3 effective storage capacity below normal bit: 38 million plus 5 holes, 10m wide, high, arc gate. Engineering characteristics:
After the head of the canal is added to the gate, the annual adjustable water storage capacity is 100 million m3, and the four reservoirs of Wangjiaya, Xinyi ditch, Dabeigou and Ganhe in the irrigation area can replenish water and rent 100 million m3, so that the water shortage in the irrigation area of Baoji Gorge is reduced from 100 million m3 to 100 million m3, and a power station can be built after the first dam of the canal, with an installed capacity of 9600kw. The situation of the original canal head water conveyance hole is not in accordance with the disadvantages, and the situation has been changed. Construction started in 1996.
3.Wangjiaya Reservoir Project.
Sedimentary surface of the basin: 3288 km2 Dam height: 24m Dam type:
Homogeneous earth dam, the dam crest passes through the main trunk canal of Baoji Gorge, flow: 60m3 Total storage capacity: 94.2 million m3 Effective storage capacity:
87.5 million m3 project features: the project is the first large canal and reservoir combination project in our province, the dam crest through the main trunk canal of Baoji Gorge, the main canal water can be put into the reservoir, transfer and store water from the non-irrigation period, and then replenish the channel water supply when there is a shortage of water.
-
Mainly the process flow and the way of water supply and drainage, I wrote the report at that time: the time of the internship, the name of the internship location, the function of the internship object, the drawing of the process flow diagram and the main equipment diagram, the process used in the location and the comparison with other places visited, the specific content should be added in combination with the content you recorded.
In addition, there are many products on the group IDC network**, which are cheap and have a good reputation.
-
Write it yourself, and some things have to be done by yourself, and you have to pay for it yourself, and you will only get the rewards in the end. You can't just wait for it!
-
It's not easy to write?
Just write down what you do every day.
Give your say.
That's pretty much it for a few suggestions.
-
Write about the time, place, purpose, content, process, gains, experiences, suggestions, etc. of the practice. The report must be specific and substantial. The internship process can generally be written in chronological order.
For example, you can write: the time when the water plant was built, the scale of water production, the water source (whether it is polluted, and the changes in the water over the years, such as turbidity, solids, toxic and harmful substances. Factory water harvest, water production process, the layout of the water plant (dosing room, mixing tank, sedimentation tank, filter, clear water tank, water pump, etc.), the environmental sanitation of the water plant, just say these, throw bricks and lead the jade!
-
I know to write, but I don't write, the direction is the environment on tap water in terms of water quality.
-
Mainly write about the main work content, achievements, and shortcomings, and finally put forward reasonable suggestions or new directions...
The work summary is to let the superior know what contribution you have made and reflect the value of your work. So several points should be written:
1. Your understanding of the position and work 2. What exactly you have done 3. How you work hard and what things you use your brain to solve. Even if it's nothing, write about some difficult questions and how you solved them with effort.
4. What abilities do you need to improve or what knowledge do you need to enrich in your future work?
5. Superiors like to take the initiative to work. You must be prepared for everything in your part, that is, the preparation work in advance is as follows for your reference:
Summarization is to conduct a comprehensive and systematic general evaluation and analysis of the situation in a period of time, and analyze achievements, shortcomings, and experience. Summarizing is a type of applied writing, which is the rational thinking of the work that has already been done.
The basic requirements for summarizing.
1 The summary must have an overview and description of the situation, some of which are relatively simple, and some of which are more detailed.
2 Achievements and shortcomings. This is the main thing to summarize. The purpose of summarizing is to affirm the achievements and find out the shortcomings. What are the achievements, how big are them, what are the aspects, and how they were achieved; The number of shortcomings, the aspects in which they manifest themselves, and how they arise should be clearly written.
3 Lessons learned. In order to facilitate future work, it is necessary to analyze, study, generalize, and form theoretical knowledge of previous work experience and lessons.
Notes on Summary:
1. We must seek truth from facts, and the achievements are basically not exaggerated, and the shortcomings are basically not reduced. This is the basis for analysis and drawing lessons.
2 Be organized. The sentences are smooth and easy to understand.
3 Be detailed. There are important and secondary, and the main points should be highlighted when writing. The questions in the summary should be prioritized and detailed.
Basic format of the summary:
1. Title. 2. Text.
Beginning: an overview of the situation, an overall evaluation; The outline is summarized and the whole text is summarized.
Subject: Analyze the shortcomings of the achievements and summarize the lessons learned.
Conclusion: Analyze the problem and clarify the direction.
3. Payment. Attribution and date.
Legal analysis: 1. The following documents must be obtained: 1. "Production License", "SC Certification" (formerly called "QS") Quality and Technical Supervision Bureau. >>>More
The high-efficiency and energy-saving water pump of the water company's energy-saving and consumption-reducing summary. >>>More