When the new house is renovated and accepted, check whether the doors and windows are damaged, whether they are flexible, whether the ground is hollow, whether the circuit is qualified and whether the various sewers are unobstructed.
Many people do not know how to accept the new house after the decoration is completed, most people may look at whether there are some quality problems, and hurriedly pay money to the decoration company, but in fact, there are many details that need to be paid attention to, otherwise it is difficult to find the decoration company for theory if there is a problem in the later stage.
1. Acceptance of doors and windows.
First of all, we need to check whether the installation of the doors and windows is firm, and how flexible the door opening and closing is. The second is whether the hardware on the doors and windows is complete, it is best to be some popular brand hardware, which is not easy to have problems in the later stage, check whether the sealant of the glass is uniform, and whether the selection of the sealing strip meets the national regulations, so as to avoid water leakage in rainy days in the later stage. Finally, look at whether the door frame and the entire window frame are horizontal and vertical, and whether there is any skewed condition.
2. Line acceptance.
The acceptance of the line is a very important part, if there is a problem with the line, it is easy to have a safety accident. First of all, in the case of power failure, check whether the circuit lines in all rooms are in line with the regulations, under normal circumstances, the general lighting circuit requirements are not less than square millimeters, and some high-power kitchen requirements should be higher. Secondly, look at whether the circuit of each socket is unblocked, and finally turn on the main switch to check the operation status of each place.
3. Drainage acceptance.
The acceptance of the drainage condition is a part that cannot be ignored, if there is a sewer blockage, but in the future, it will not only affect their own living life, but also will have a certain impact on the residents downstairs. Therefore, be sure to check whether the drainage of the sewer pipes is smooth, whether there is any leakage, especially some floor drains, toilets and balcony showers, drain the water from the faucet to the ground and wait for a period of time to see if there is any leakage.
-
First, the wall and ground acceptance.
1. The first step into a new house is indispensable for the acceptance of the wall and floor. First of all, check whether the wall is cracked or hollow. You can use a hollow drum hammer or hard object to tap the wall to make a knocking sound, or the sound in one place is completely different from other places, or it may be a hollow drum.
In this case, you can put a post-it note to mark it.
2. Check the latex paint on the wall. Check whether there is obvious sand hole, peeling and other conditions on the surface of the latex paint, touch the surface with your hands to see if there is powdering, and check whether the color of the surface of the latex paint is consistent and whether there is a bottom-penetrating situation.
3. The gap between the ground tiles should not be too large, and the joints should be uniform; Use a ruler to check the flatness and levelness of tile paving; Check whether there is any deviation in the color of the tile, whether there is damage or cracking, etc.
Second, the acceptance of doors and windows.
Door and window acceptance requires checking for functionality and strength. First check whether the surface of the door and window is clean and tidy, whether there are scratches and cracks, whether the plate is cracked and broken, and then see whether the position of the hardware accessories is correct and firm. Then open and close the doors and windows to check the quality of the seal, check whether there are obvious cracks between the fan surface and the fan frame, and whether the sealing strip is loose.
If it is a wooden door, then check whether the paint film on the surface of the wooden door is flat, smooth and free of bubbles.
3. Hydropower acceptance.
1. In terms of circuit acceptance, one is to check whether the position height of the socket switch is convenient and reasonable, and the other is to check that the socket can be used normally, and you can use an electric pen for inspection, and you need to pay attention to safety.
Then there is the acceptance of the electrical box, in the case of power failure, check whether the position of the electrical box is firm, and check whether the wiring in the electrical box is flat and smooth. Then check whether the position of the appliance is loose and whether there is a fixed installation. Finally, turn on the switch and check the operation of the appliance.
2. Waterway acceptance, use tools to conduct drainage tests at sinks, washbasins and other drainage outlets to see if the speed of water flow is slow or not, so as to prevent internal blockage of water pipes and cause drainage difficulties. Check whether the drainage of the floor drain is smooth, splash a large amount of water on the ground, and easily know whether there is water and whether the slope is enough through the direction of the water flow. It is also necessary to check the water coming out of the faucets of showerheads, bathtubs and basins.
Fourth, the smoke exhaust port acceptance.
Detect the ventilation of the kitchen and bathroom pipes, extinguish the fire after lighting the paper towel, put the paper towel under the ventilation duct to see if the pipe can suck the smoke away, and also check whether the smoke alarm device is sensitive.
-
It should be seen whether the packaging of the decoration is complete, and whether the number of materials is correct, whether the decoration packaging is complete, whether the decoration materials are expired, whether the water circuit is complete, whether some keels and walls are flat, and the width of the wall so that the acceptance can see whether it is qualified.
-
The acceptance of the wooden curtain box, the estimated construction period, the flatness of the surface of the window sill, the sealing of the glue, the waterproofing of the bathroom, and the exhaust flue of the kitchen must be checked here to be qualified.
-
In addition to the acceptance of the floor, doors and windows, and walls, it is also necessary to accept the water and electricity, and the anti-slip of the ground needs to be accepted.
-
After the decoration is completed, it needs to be accepted, and the method of acceptance is to be carried out: after the completion of the decoration project, the decorator and the person in charge of the decoration enterprise shall clearly put forward the acceptance application to the management center. The Management Office will arrange the project acceptance staff (the person in charge and technician of the E&M maintenance team, the person in charge of the public administration team and the management personnel) to carry out the on-site project acceptance of the interior decoration within the same day.
If there is no traffic violation for interior decoration, apply for it according to the following procedures: If there is a traffic violation, apply for it according to the illegal payment method.
If the completion acceptance is qualified, the person in charge of the public administration group of the management office shall be in the "Decoration Application Form"."Completion acceptance"Channel signing"The preliminary acceptance is up to standard"and sign the name and date. The quality acceptance of the interior decoration project of the home residence should be carried out in stages, and the acceptance of the ground floor and concealed engineering should be done first with the construction progress of the project, and then the overall surface layer and engineering acceptance should be carried out. Considering that the general residents have little grasp of the engineering specifications and lack of testing tools, the specifications are dominated by judgment, estimation, and text description, which is conducive to the residents to grasp and provide a basis for the quality acceptance of family residential decoration design projects.
In addition to complying with this code, the design and engineering construction of residential decoration design at home should also meet the requirements of China, field, and local standards and specifications for safety, fire safety, environmental protection, engineering construction, electrical equipment, water supply and drainage, etc. The contractor shall have the enterprise qualification certificate and the business license of the enterprise, and the construction team shall be certified according to the regulations, and the natural gas pipeline must be assembled by the enterprise with gas installation qualification. Because many water circuits are decoration concealment projects, before painting the wall, whether the water pipe has leaked, and whether the power circuit meets the regulations have been accepted by the project.
When the interior decoration is completed, the engineering acceptance of the water circuit is mainly to look at the sewer pipe and the bulb power supply circuit. The actor's practice is to turn on the tap to see if the water is smooth and the sewer is smooth; Turn on the switch of the light to see if it can illuminate the corresponding lighting fixture.
-
1. Acceptance of raw materials.
The decoration raw materials arrived at the scene according to the contract ** to inspect the goods once, and then inspect them again after assembly. Detect whether the well-known brands, specifications and models of hydropower materials are in line with the design points.
2. Check the wall and ceiling.
After the decoration of the home improvement design company, first check the wall and ceiling, whether there are cracks in the connection between the ceiling and the wall, whether the ceiling chandelier is firm, whether the wall paint is glued, whether there is any falling off, etc., are all necessary processes for the acceptance of the house; For the inspection of the wall, the most important thing is to check whether the wall is bulging, you can find it by hitting the wall with your hands or with the help of other tools, and record it and explain it to the home improvement design company for follow-up negotiation.
3. Check the ground condition.
For the inspection of the ground, the main thing is to see whether the ground decoration is flat, and you can measure it with the help of a balance ruler, which can be further confirmed.
4. Check the condition of doors and windows.
Doors and windows are mainly to check the firmness of the installation, as well as the tightness of the closure when opening and closing the door, special care is taken here, there are more hardware parts of doors and windows, and they also need to be carefully checked.
5. Check the water and electricity lines and gas pipelines.
The inspection of hydropower lines and gas pipelines is related to safety engineering, so it is relatively important, if you can't determine the situation of hydropower lines and gas pipelines, you must find professional personnel to carry out the corresponding situation, because the inspection of hydropower lines and gas pipelines will be relatively complicated.
6. Check the waterproofing situation.
The waterproofing project of decorating the house is a very important project, mainly for the two spaces of kitchen and bathroom; For the acceptance of the waterproofing of the house, it is also recommended to find professional personnel to conduct the inspection.
-
The first thing to do in the acceptance of the house is to see whether the ground is flat, check the tightness of the doors and windows, check whether the pipeline drainage or sewage is good, waterproof is also very important, and the water, electricity and heating must be checked in place.
-
Be sure to accept the water and electricity, the wall, the ground, you can knock, you can use some water to accept the bathroom.
-
After the decoration is completed, we need to accept, first of all, the surface of the acceptance to see if the tiles and template furniture are bumped, whether the floor tiles are filled evenly, whether the size of the wardrobe is OK, the second step is to buy a measuring pen to see if the wall is flat, and finally knock on the floor to see if there is a hollow place.
-
After the decoration is completed, what needs to be accepted? How do you do that? After the wall decoration is completed, it is necessary to accept the construction of the wall and wallpaper, mainly to detect whether the wall will have hollowing problems and whether the wallpaper will have bubble problems.
When accepting the circuit, it can be judged by the normal use of the lamp switch, and the socket can also be tested with a tester
-
Methods of post-renovation acceptance: Waterproofing is a particularly critical process before laying wall tiles and tiles. Its primary goal is to check whether there can be neglected in the waterproof construction, whether the waterproof effect is normal, because as long as the closed water test is carried out, the next paving work can be carried out safely.
After the waterproofing construction is carried out, the closed water test should be carried out after the waterproof layer is completely dry. Temporary plugging of floor drains and near branch pipes. Build a 20 cm high retaining wall in front of the door.
Gradually store water, the depth of the water storage is 5-20cm, and the water level is marked. The storage time is 48 72 hours. After the first day of water shut-off, check to see if the water level has dropped significantly.
If so, check immediately for leaks in the roof and pipes underneath the building.
If not, turn off the water again, and after the water is cut off on the third day, check the surrounding conditions of the ceiling and roof pipes under the floor in an all-round way. After the standard is thoroughly reached, the next process will be carried out. Whether the paint of the wooden furniture is timely, whether the top and wall plating are not symmetrical, whether the control panel and lighting fixtures assembled by the welder are suitable, and whether the route connection is accurate.
After the concealed works are carried out, the acceptance of the works will be carried out. When the project is completed and accepted, the concealed project cannot be accepted. We can only see whether the use of concealed projects is smooth and convenient.
Turn on the power switch in the bedroom first, see if the light is on normally, take a lamp with a power plug, connect it to each power socket, and check whether the power socket is normally plugged in. In the data signal, connect to the wireless network and check whether the data signal is normal. Generally, after the house is renovated, there is no computer at home, and there is no way to check whether the network cable is normal.
If the wireless network wifi is normal, there is no problem with the main task of installing weak current. If possible, you can bring a laptop to check if the network cable is normal.
Attention should be paid to: After the appearance of the pavement is inspected, after the wooden floor and floor tiles are laid, it is easy to scratch or damage the surface due to careless building construction. Therefore, when the ground decoration is completed and accepted by the project, it is necessary to check the appearance of the road surface at the beginning to see if there can be problems such as color casts, gaps, and gaps.
The appearance of the pavement must be inspected in an area 2 meters away at the beginning, and the light should be used to estimate whether the pavement color is uniform, whether there are color casts and scratches, and whether abnormal air pollution is found in the wall tiles, such as concrete, paint, etc. Then look with your eyes and hands to inspect the surface for cracks, gaps, and damage.
Circuit, power circuit refers to the detailed location and matching of the power plug, the specification and model of the cable and the capacity of the mechanical equipment with relatively large power consumption. This requires consumers to ask the property management company or real estate developer in the community for most of the water, electricity and other interior decoration and decoration concealment projects of the reasonable layout of the as-built drawings. In the future application process, if there is a short-circuit fault problem and water cut-off, it can be repaired by professionals according to the construction drawings.
First of all, we should pay attention to the acceptance of hydropower, hydropower engineering is a relatively hidden project in the decoration, so we must carefully and carefully follow the standard acceptance when accepting hydropower, and then pay attention to the wall and floor tile project, the acceptance of this piece can not have obvious staggered joints, can not have broken bricks, etc., there is also the acceptance of paint, to ensure that the paint surface is saturated and clean without particles, and the matters to be paid attention to in the reception should be checked when the faucet is checked to see if there is a leakage, and when checking the toilet, it can be glued to the toilet to see if it is strong. How about the load-bearing, turn on the lights in the house when the switch and socket are checked.
Since it has reached this point, the best way at present is to find someone who understands, or someone who is an expert, to take a look, there are too many cats in it. >>>More
Generally speaking, if you really use a machine to measure, it requires a complex machine. >>>More
It is not easy to decorate a house, both the owner and the construction personnel have paid a lot, so it is particularly important to accept the house after the decoration. Many owners do not know how to accept after the decoration, which has a lot to pay attention to, today we will talk about how to accept the house after the decoration? What are the precautions for acceptance? >>>More
Introduction: Nowadays, most of the houses sold on the market are rough houses, because the house prices of rough houses are relatively cheap, and we need to accept them after buying a rough house, so do you have an understanding of the pipeline of the acceptance of the rough house? Next, let me introduce to you how to accept the pipes of the rough room! >>>More