If you want to accept the pipeline of the rough room, how do you need to accept it?

Updated on home 2024-06-29
18 answers
  1. Anonymous users2024-02-12

    Introduction: Nowadays, most of the houses sold on the market are rough houses, because the house prices of rough houses are relatively cheap, and we need to accept them after buying a rough house, so do you have an understanding of the pipeline of the acceptance of the rough house? Next, let me introduce to you how to accept the pipes of the rough room!

    When we accept the pipes in the blank room, we must first check whether the pipes are installed smoothly and sealed, and we can shake the heating pipes and water pipes by hand. This is used to determine its stability and firmness, and if there is any loosening, it should be re-fixed. Secondly, we need to open the water valve to see if the drainage is smooth, and wipe the upper and lower pipes with toilet paper to see if there is water seepage at the bottom.

    If there is water seepage, you should find the relevant personnel to inform the maintenance in time. <>

    In addition to pipeline acceptance, the wall, top and ground works of the rough house should also be inspected. Check its verticality and flatness, check whether there is a hollow drum problem, and use a special instrument to measure the levelness to check the pipes, heating and other facilities and the hidden wall plastering works behind. The most important thing is the measurement of the relevant data in the rough house and the overall condition of the house.

    See whether the data is accurate, whether there are any differences, such as doors, windows, etc., should see whether there are scratches, cat's eyes, whether it is stable and firm, etc. <>

    First of all, it is necessary to make preparations in the early stage of construction and provide water and electricity wiring diagrams. The next thing is the main body demolition, some people don't like the overall layout of the house, if you need to demolish the wall or build the wall, the site must be cleaned up, for the later aspects of construction. Then it is necessary to determine the location of the switch and socket installation, determine the transformation plan of the power supply and waterway, and then do a good job of waterproofing.

    If you need to customize or install doors and windows, measure the size by the carpenter, and some details must be done, such as installing the sink, gas stove, including the size of the kitchen, and finally carry out soft decoration.

  2. Anonymous users2024-02-11

    It is necessary to check all aspects of the connections of the individual pipes, as well as the quality of these pipes and the location of their installation.

  3. Anonymous users2024-02-10

    You can find a worker from a renovation company to carry out the corresponding acceptance, because after all, the other party is professional, and you will also get a very brand new house.

  4. Anonymous users2024-02-09

    At the time of acceptance, you should look at the sealing problem, but also need to look at the material problem, as well as the water leakage, and the connection problem.

  5. Anonymous users2024-02-08

    You can wrap a layer of toilet paper around the pipe, and then open the valve of the water pipe, if the pipe is leaking, then the toilet paper will be wet, which indicates that the pipe is making corners and cutting corners.

  6. Anonymous users2024-02-07

    When accepting, we should pay attention to the laying position of the pipeline, and we should carry out the acceptance according to some regulations on the contract, and we can detect whether the gas or blood flow leaks, and we must be meticulous when accepting, which will affect the sense of residence in the later stage.

  7. Anonymous users2024-02-06

    You can look at the design of the pipe, the quality of the pipe, whether the water will leak, or it is difficult to close the valve.

  8. Anonymous users2024-02-05

    Introduction: Now most of the housing agencies sell some rough houses, because the rough house is cheaper, after buying the rough house, you can decorate according to the style you want, then the most important thing is the acceptance of the rough house, many people do not understand the acceptance of the rough house pipeline, so today I will tell you how the rough house pipeline should be accepted? <>

    When you see the pipe in the rough room, the first thing you have to check is to see if the pipe is smooth and sealed, if you don't know whether it is sealed, you can shake it vigorously by hand to judge its stability and firmness. If there is a loose pipe, then they should be asked to re-fix, and then open the water valve to see if the drainage is smooth, you can wipe the pipe with toilet paper when releasing water, and see if there is any water leakage. <>

    When the rough house is accepted, in addition to the acceptance pipeline, the wall of the relative blank room, the top surface, and the ground of the project must be inspected, and the reason why it is inspected is to see its quality, whether there is a hollow drum problem in flatness, if there is a hollow drum problem, then it will fall off in the later stage. Especially like some of the cat's eyes on the top after installing the door, how long did it take to fall off, because the cat's eye was not checked to see if it was firm, if you encounter such a situation in the later stage, others will not come to solve it for you. <>

    When you are preparing to decorate the rough house, first of all, you have to do all the preparatory work, to provide the construction personnel with the waterline cloth water and electricity wiring diagram, and then carry out the overall layout, if there is a wall demolition or wall, the site must be cleaned up, which is also to facilitate the later construction, to determine the location of the socket switch and to do a good job of waterproofing.

  9. Anonymous users2024-02-04

    At the time of acceptance, in addition to the quality of the pipeline, it is also necessary to look at the performance of the rough room and the direction of the inside.

  10. Anonymous users2024-02-03

    If you want to accept, you should first check the water and electricity problems, then you should check whether the doors and windows are tight, whether the rubber strips are suitable, and then you should also check whether there are cracks in the wall, and you also need to check whether there is water leakage and whether the pipeline is broken.

  11. Anonymous users2024-02-02

    First of all, we must look at the pipeline of the blank house, whether it is the pipeline stipulated by the state, but also look at some parts, but also look at the direction of the pipeline, if the direction is not correct, it is not good, but also look at the quality of the pipeline so that it can be accepted, if you will not accept, you can also ask a professional team to accept.

  12. Anonymous users2024-02-01

    At this time, you can knock it with your hands, you can listen to the sound, you can also touch it with your hands, whether there is water leakage or electricity leakage, and you should pay attention to the water pressure and voltage, you should pay attention to the gas meter alarm, and the installation of exhaust gas pipes.

  13. Anonymous users2024-01-31

    After the formalities are completed, the house is inspected. The importance of residential inspections cannot be overstated. The gas pipes, water pipes, and heating pipes in the blank are the three important parts of the blank inspection room, and as the owner of a new house, you must observe carefully.

    After the housing formalities are completed, the opening of the house will begin. The importance of opening the cabin is self-evident. Gas pipes, water pipes, heating pipes, etc. are the three important parts of the blank inspection room, as the owner of a new house, you must carefully observe and talk about the acceptance of water pipes and gas pipes in the new house, residential pipes are generally water pipes, gas pipes and heating pipes.

    If you don't carefully inspect the new home you just bought, there is a problem with the plumbing that will affect the water, gas and heating of the house.

    The gas pipeline is mainly used to provide household natural gas cooking and boiling water, etc., whether the gas pipeline is set correctly, whether it is related to the daily life of the family, and the small preparation refers to some precautions for the acceptance of the gas pipeline. Double-check what brand, model, and specification the gas pipeline is, and confirm whether it is available on the Internet, so that you can get a detailed picture of the quality of the pipeline. In general, this type of inspection is more specialized and should be detected using a gas leak detector or leak detection method.

    The acceptance of water pipes is related to the daily use of water in the home, which must not be ignored. Water pipes must be separated from other gas and heating pipes at a distance of more than 50 mm.

    If you don't want the quality of your water pipes at home to be a problem, you should buy a big brand of water pipes. This should not be overlooked. In particular, do not use water pipes that do not have a trademark.

    After the water pipe is completely closed, measure the water pressure 8-10MPa with a pressure measuring pump, and after 30 minutes, the water pressure of the water pressure gauge drops to and check whether all water pipes are leaking. If there is no water leakage, it indicates that there is no problem with the quality of the water pipe. Heating pipes are generally used in northern families, and heating is rarely used in the south, and whether the heating pipes are set correctly is related to whether the heating at home is sufficient in winter and whether it can become a comfortable and warm winter.

    The choice of heating pipes is very important, it is recommended to buy heating pipes produced by regular factories, but general heating pipes are provided by heating enterprises. If the heating factory that heats your home is large and is a regular heating company, there will be no quality problems in the general heating pipes. Commonly used water temperature examples, water temperature pipes generally pay attention to whether there is water leakage.

    In order to test the heating effect, it is necessary to confirm whether the heating water pipe is leaking and whether the heating company can provide a water temperature test method. The general method is to compress the water pipes. During the experiment, if the water pipes were not leaking, the heating was considered to be basically normal.

    To test the heating effect, the heating company should test the temperature of the home when heating to check the effect.

  14. Anonymous users2024-01-30

    During the acceptance, we must pay attention to the laying of pipes, and also pay attention to some regulations in the contract, and we should also check whether the doors and windows will leak during the acceptance, and we should also check the sound insulation effect.

  15. Anonymous users2024-01-29

    You should find a professional person to help with acceptance, so that you can confirm the project and there will be no follow-up problems.

  16. Anonymous users2024-01-28

    By looking at the acceptance. Check whether those pipes are doing well, and you can accept them if they are done.

  17. Anonymous users2024-01-27

    First, measure the actual area of the room.

    According to the floor area and drawings of the suite provided in the handover letter, the buyer can measure it on the spot. If the error is large, they can ask the developer or commission a professional organization to retest. You can also let the decoration company send someone to measure the size directly, saving you trouble in the future.

    2. Hydropower inspection.

    If the water and electricity are not smooth, even the basic living needs will have problems in the future, so be sure to check the water and electricity infrastructure before renovating.

    It is important to check the following details:

    1.Pay attention to check whether the sewer pipe is unobstructed and unobstructed. You can tell by the speed of the water flow and the sound of the flowing water.

    2.Check the strong and weak power supply in the room to see if it is normally available.

    3.In order to ensure the safety of electricity in the future, it is necessary to test the insulation resistance value of indoor wires. No problem is considered qualified.

    Three. Wall condition checks.

    The quality of the walls of some houses is not good, and it is easy to crack the wall, fall off the tiles, and seep water into the wall after decoration. Therefore, the acceptance of the wall is very important when the rough house is accepted.

    1. Check if the wall is empty.

    A common problem of rough houses is the problem of hollow walls. Hollow drums on the wall can be knocked out with a small hammer. If there is a drum sound, it means that there is a hollow drum. If the hollowing phenomenon is not treated, the topcoat will fall off, so you must pay attention to it.

    2.Measure the verticality and flatness of the wall.

    In addition to checking whether the wall is flat, also check whether the wall is vertical and sloping. In addition to visual inspection, the flatness and verticality of the wall can also be detected with tools such as rulers and corner rulers.

    Four. Check the ground condition of the building.

    1. Check whether the ground is flat.

    In general, there are two types of uneven ground. One is an uneven local area with small holes, mainly in the corners of walls or doors; The other is a large area of unevenness, which can be detected by visual inspection or an infrared level. If there is an unevenness, be sure to re-level, otherwise both the tiles and the floor will be affected.

    2.Inspect the ground for cracks and dents.

    Whether the ground is cracked can be visually inspected, but whether it is hollowed out needs to be detected by a quality inspection hammer tool. Cracks and cavities usually appear at the same time, but some appear separately. The hollow cracking of the ground will directly affect the later decoration construction, so we must be cautious when accepting.

    3. Check whether there is sand on the ground.

    If there is floating ash and sand on the ground, the ground will become soft. So, what causes sand on the ground? Generally, the cement label is not standard or expired, the mud content of the sand is too large, the cement mortar ratio is improper, and the maintenance is not in place. , which can lead to sand on the ground.

    5. Check the installation quality of doors, windows and accessories.

    Doors and windows are related to the safety of the owner's residence. Therefore, the owner should carefully check whether the model and materials are in accordance with the contract, and also check the flexibility and tightness of the doors and windows, the shortage and damage of spare parts.

  18. Anonymous users2024-01-26

    Some owners think that the construction of the rough house is less, and there is no need to accept it after the decoration. This is not right, the rough house and the hardcover house, the same need to check the quality of the house, so as to be able to find the problems in the construction in time, to ensure the safety and convenience of living in the future. On the question of whether it is necessary to inspect the rough house, yes.

    So what places need to be accepted for the inspection of the rough room? There are five main aspects: wall, ground, roof, water and electricity, doors and windows.

    It can be said that the wall is the largest construction area of the project, and it also affects the quality and structure of the house. First of all, check the surface of the wall to see if it is smooth and if there are no cracks. You also need to look at the putty painted on the wall, if there will be mud if you splash water on the wall, it means that the putty used is unqualified and has no waterproof function.

    Check whether the ground is flat and whether there is cracking, anti-sand or hollowing. The hollow drum can be inspected with the help of a tool, and the wall can be gently tapped with a small hammer to distinguish from the sound. If there is a hollow drum, mark this place and repair it in time.

    The acceptance of the roof is easy to be overlooked, but it is also the most prone to problems after living in it, so it is necessary to pay special attention to the waterproofing of the roof. Check whether the yin and yang angles of the roof are straight, if it is not on a flat line with the wall, it needs to be leveled and repaired, and then use putty to level after the plaster is low.

    Daily life is inseparable from the cracking and use of hydropower, and if the hydropower project is not done well, it will cause great trouble to home life. The acceptance of the waterway needs to be tested accordingly, and the pipes installed in the room are closed water and pressure test respectively. For circuit acceptance, the rationality of the circuit should be checked, whether it meets the electricity demand of electrical appliances, and ensure that each switch and socket can be used normally.

    Windows and doors should be installed firmly, meet the standards, and be tested for opening and closing, whether it is smooth and free of resistance. At the same time, pay attention to the sealing between the windows, there is no loosening, exposure, to ensure waterproof, sound insulation and warmth.

    You can get it for free

Related questions
11 answers2024-06-29

Before we carry out the renovation of the rough house, we need to accept the rough house delivered by the developer, and only then can we continue to carry out the next rough house decoration under the condition of ensuring that there is no problem with the preliminary acceptance. When decorating, we also need to pay special attention to the overall pattern, the transformation of water and electricity, the experiment of waterproofing, and the creation of some software facilities such as tiles and carpentry. >>>More

9 answers2024-06-29

The first step is to check the route of the hydropower project in the room to see if the appliances you purchased are paired, and it is best to consult the hydropower installation so that he can help you update and transform. In case the problem is discovered after installation, it will be more troublesome to deal with. It is said that the rough room is also known as the "initial decoration room", generally there is only a door set in the room and no door, and the bottom edge of the wall is just a basic treatment, but the public location, public facilities, all kinds of water supply and drainage, drainage pipes, precipitation, radiators, boiling water and other pipelines are assembled in accordance with the design documents. >>>More

8 answers2024-06-29

What are the precautions for receiving a rough house? There are three issues to be aware of, especially the first point, which must not be forgotten.

7 answers2024-06-29

The construction process of the blank house is as follows: first check whether there are cracks in the house, hollow a large area, determine the location, and then roll a layer of hardener on the wall (function: mainly to solidify the cement sand of the wall to prevent loose cement sand from falling off in the future), and then treat those cracks, and then touch the putty 2---3 times, and then polish and paint.