    First of all, we should pay attention to the acceptance of hydropower, hydropower engineering is a relatively hidden project in the decoration, so we must carefully and carefully follow the standard acceptance when accepting hydropower, and then pay attention to the wall and floor tile project, the acceptance of this piece can not have obvious staggered joints, can not have broken bricks, etc., there is also the acceptance of paint, to ensure that the paint surface is saturated and clean without particles, and the matters to be paid attention to in the reception should be checked when the faucet is checked to see if there is a leakage, and when checking the toilet, it can be glued to the toilet to see if it is strong. How about the load-bearing, turn on the lights in the house when the switch and socket are checked.

  2. Anonymous users2024-02-11

    It is necessary to check and accept the water and electricity, see whether the circuit is smooth, whether the bathroom is leaking, accept the paint, and accept the flatness of the floor tiles; When accepting, we must pay attention to details, accept from all angles, and do not ignore water and electricity problems.

  3. Anonymous users2024-02-10

    Be sure to check the water and electricity, but also check whether the waterproofing of the bathroom is in place, but also check whether the windows are tight, whether the door is tight, whether there are gaps, and ask if there is a problem when you are responsible, how to compensate, how to divide the specific responsibility, these must be asked clearly.

  4. Anonymous users2024-02-09

    Detail decoration quality problems (hollow wall tiles, latex paint cracks, etc.). Hydropower problems (water leakage, panalkali, water seepage, whether the circuit layout is standardized, etc.) such as: 1. Wall appearance inspection, generally check whether the wall color is uniform, flat, whether there are cracks, as well as the deviation of the wall corner, vertical leveling, and whether the wall is hollow.

    2. Ground inspection, check whether the floor has color differences, cracks, hollowing and loosening, and flatness. It is recommended to check the walls, waterways, electrical circuits, ceilings, and related waterproofing measures, etc., and these places are OK if there is no problem. In addition, it is recommended to find a professional decoration company to do the decoration, the all-inclusive circle in Beijing, from the design, construction, materials all have an integrated operation process, for the quality of acceptance, for example, hydropower, the acceptance of hydropower is not only the appearance, but more internal, and for the internal acceptance, I believe that a large part of the people are not clear, because for professional things, non-professionals, it is definitely not clear, so how to carry out the acceptance, We can use the external force of the toilet and kitchen sewer pipes to check whether there is water seepage, the deviation of the corner of the wall and the vertical flatness of the wall is very necessary, these two indicators can not only reflect the appearance of the wall of the house, but also check whether there is a problem with the structure of the wall. Wallpaper, wall cloth in the yin corner of the seam should be lapped, the corner of the yang should be compacted, acceptance must be more careful, don't live in to find the decoration of the problems, then repair it is more troublesome. After sorting out the precautions for house decoration, it is not too late to accept it after reading it. After the indoor air quality test is completed, a detailed report will be obtained, and the formaldehyde will be started as soon as possible, and the appearance will not exceed the formaldehyde content After looking at the position again, the continuous release of formaldehyde, and mastering these basic conditions, it will enter the battle with formaldehyde for 300 rounds.

    The circuit is one of the key points of inspection. If the circuit is not handled well, not to mention the impact on the sense of use, the most feared is that it will pose a threat to life, so special attention should be paid to the circuit.

  5. Anonymous users2024-02-08

    After the house is renovated, it needs to be accepted, be sure to see whether the decoration quality meets the standard, and ask the professional team to accept whether the standard is up to standard, and whether there is any formaldehyde exceeding the standard.

  6. Anonymous users2024-02-07

    Absolutely. We must be cautious when accepting, and we should also pay attention to some details, and we should also understand some contracts for decoration, and we should also check some lines such as water and electricity, and we should also check whether the doors and windows are tight.

  7. Anonymous users2024-02-06

    It needs to be accepted, because if there are some problems, you can also solve them face to face, so as not to let them not admit the account in the future, you can take a look at the standards of the bathroom and kitchen.

  8. Anonymous users2024-02-05

    Introduction: After everyone renovates a new house, it always needs to be accepted, so you must also know the circuit at the same time as the acceptance. Many people don't have an electrical box when they are distributing, so it may also cause some routers to disconnect, resulting in no way to act on their own actions.

    You have to take a look at the wall to see if there is a hollow phenomenon, some people find that the skin on the wall has fallen off soon after the renovation, which is also because you did not accept it at that time. <>

    Many people will install a lot of sockets at home, if others do not get these right, it will also bring you a lot of potential safety hazards, which dismantle in the acceptance at the same time you also have to know what you should do. Some people will find that it has been raining in the house when it rains, so at the same time, you should also know that if these things are not repaired for a long time, it will also feel that you are inexperienced, and it will also bring you great danger. Roof leaks are something that everyone doesn't want to see, so if he doesn't do it for you and doesn't do it evenly, you have to get it all over.

    The steps in the bathroom are very important, if you don't do a good job of waterproofing, it may cause the water you use to leak into someone else's home. At this time, the best way is to turn on all the faucets and turn them on to the maximum to see if there is any running water or bad things. When a person decorates, he must follow a fixed process, don't change everything blindly, and you may not pass the audit at all in the end.

    When buying a house, you must sign a good contract, like if there is a problem with the house, you can also choose to go to them. Young people are lazy and like to buy a renovated house, but if you don't accept it at this time, you will feel a big loss when you buy the house. The difference in ability also represents what kind of house you will choose, so no matter what, you must make yourself more savvy while choosing.

  9. Anonymous users2024-02-04

    Don't bring unnecessary trouble to yourself, and also pay attention to circuit problems, don't let the fire break out at home, and also pay attention to the separation of dry and wet, don't let the mold at home, but I believe that the most important point is that when accepting, you must pay attention to the problem of air leakage, and don't let the home be too cold.

  10. Anonymous users2024-02-03

    Look at the thickness of the walls, the structure and sealing strips of doors and windows, the structure of the house, the water and water supply of the bathroom, the water and electricity and the wiring with a clear cavity stupid shirt problem, natural gas pipelines, water heater pipes, if you don't know, you can ask the people around you for advice or do a good job on the Internet in advance.

  11. Anonymous users2024-02-02

    First of all, it is necessary to measure the size of the spine hall, talk about whether the size of the concealment is the same as what was said when buying, but also look at the quality of the wall, avoid the appearance of hollow walls, but also look at the pattern, but also look at the size of the glass window sill bathroom.

  12. Anonymous users2024-02-01

    Look at the thickness of the walls, the structure and sealing strips of the doors and windows, the layout of the house, the uneven water in the bathroom, the results of water and electricity and wiring, the air pipes, and the water heater pipes.

  13. Anonymous users2024-01-31

    As we all know, if you want to live in a new house, you must first decorate, and decoration is a complex process, involving many aspects. For the owner, the decoration and acceptance of each link is particularly important. So,How to accept after renovation

    What should I pay attention to when inspecting a house?

    How to accept after renovation- Floor installation.

    How to accept after renovation?First of all, we must verify that the installed bond is strong, whether it will make a sharp sound, whether it will loosen. The surface of the wooden floor must be planned and leveled, without traces of saws, slag and burrs, and the texture of the wooden floor must be natural and clear; In the case of floor tiles, the joints must be firm and even; If making sockets, the components must be straight, the height difference must not exceed 3mm, and there must be no visible seams.

    How to accept after renovation- Cement.

    We must verify the quality of the cement, verify whether there is a product certificate, determine the type of cement, and clarify the use of cement.

    How to accept after renovation- Waterproof coatings.

    The thickness of the inner waterproofing layer is an acceptable focal point because only the waterproofing layer reaches a certain thickness before it has the ability to waterproof, so the amount of coating is actually quite large. We must also be mindful of the use of pollutants in waterproofing construction, otherwise there will be long-term effects on the indoor environment and must be monitored at the time of acceptance.

    How to accept after renovation- Roofing works.

    We have to look at the type of materials used in the roof, specifications, colors, infrastructure, etc. In the design, if the panel and keel are well connected, the joints are average, the roof surface is flat, whether there are cracks, whether there are missing, and it is also necessary to verify whether it meets the relevant specifications corners, etc.

    1. Inspect the quality of the house in detail, including cracks in doors, windows, balconies, etc.

    Since the new house has a long time, there will be some dust and construction debris on the doors and windows, so the doors and windows should not be pushed and sliding with brute force. If it feels clogged, observe it carefully and clean it with a broom.

    2. Check the flatness of the wall and whether there are cracks.

    Especially check some walls for watermarks, kitchen sanitary covers, exterior walls, etc. If so, it's important to find out the cause as soon as possible.

    3. Carefully inspect the ground for cracks.

    If there is a hollow drum, it must be solved, otherwise it will easily penetrate into the floor during the renovation process.

    4. The state of water, electricity and coal is unlocked and can be used normally.

    Turn on the faucet to control the leak and try to make the flow bigger and more urgent. Let's take a look at water pressure. Second, test the drainage rate. Use a multimeter to measure whether each power supply is unlocked.

    5. Check whether the facilities, equipment, etc. indicated in the sales contract are missing, if the brand and quantity are consistent, under normal circumstances, there should not be any major problems in this regard, but it is necessary to check carefully.

    You can get it for free

  14. Anonymous users2024-01-30

    The house at home must be accepted after the renovation is completed, so that you can move in with peace of mind and do not have to worry about some small problems. For the owners of the first decoration, there is a lack of experience in this area, and the following will bring you how to accept the house after the decoration, and what are the key points of acceptance after the completion of the decoration.

    1. Acceptance of hydropower.

    Everyone must know the importance of hydropower, and here is the focus of acceptance. The main acceptance content is whether the circuit has been changed, whether the circuit capacity is enough to load the electrical equipment, and whether the power supply of the kitchen and bathroom is safe. The water pipe part mainly includes whether the sewer is normal, whether the floor drain sealing performance is good, and in addition, the water pressure test should be carried out to see if there is leakage of pipeline joints.

    Second, the acceptance of floor and floor tiles.

    If the floor and floor tiles are the focus of the ground inspection, it mainly depends on whether the floor or floor tiles are warped, hollow, etc., especially for the composite with pure floor, because the cement floor can not be completely paved, so there will be uneven situation, we must pay attention to whether this situation is serious.

    3. Acceptance of the wall.

    The wall is easy to appear flaws, pay attention to cracks and hollow sales. If it exists, it means that the cracks in the wall have not been repaired during the renovation, and in addition, there is a phenomenon of mixed colors at the junction between the roof and the wall.

    Fourth, the acceptance of doors and windows.

    Doors and windows are the line of defense for home security, and you must take a look at them when you accept them. The main inspection is whether the window is closed tightly, whether the sliding is flexible, whether there is a feeling of soft elasticity, in addition, there should be no traces of collision of the door, window sill stone, etc.

    5. Acceptance of kitchen and bathroom equipment.

    The key contents of the inspection between the kitchen at home mainly include whether the cabinet doors can be opened and closed normally, whether the wall tiles and floor tiles are hollow, etc., in addition to whether the water in the vegetable sink is unobstructed. For the bathroom, what needs to be checked is whether the ceiling is leaking, whether the sewer pipe is unobstructed, and whether the wall tiles are hollow.

Related questions
5 answers2024-07-17

1. Notify the other party of the contract of the time of material acceptance After the material is purchased, the purchaser needs to notify the other party of the contract to prepare for the acceptance of the materials. And this acceptance is best scheduled to take place as soon as the material enters the site. Therefore, it is very necessary to agree on the acceptance time. >>>More

13 answers2024-07-17

In the process of decoration of a new house, it is necessary to start the acceptance, and should not wait until the decoration is completed to accept. If the acceptance is unqualified, the wall is smashed, and the hole is dug, wouldn't it be even worse? Below the author will describe step-by-step what important project acceptances are and when. >>>More

2 answers2024-07-17

Since it has reached this point, the best way at present is to find someone who understands, or someone who is an expert, to take a look, there are too many cats in it. >>>More

7 answers2024-07-17

When the new house is renovated and accepted for water and electricity, the following places should be checked: >>>More

7 answers2024-07-17

Find out the contract one by one, pay more attention to the quality of the house, and refuse to accept it if you find a problem. >>>More