-
1. The role of decoration and measurement room.
Understand the detailed size data of the house, and accurately understand the length, width, height and location of doors, windows, air conditioners, heating, etc. of each room in the house by measuring the room.
2. Understand the pros and cons of the housing pattern.
Through on-site measurement, the designer will carefully observe the position and orientation of the house. As well as the surrounding environmental conditions, whether the noise is too large, how the air quality is, how the lighting is, etc., will directly affect the later design. If you encounter some bad house layout or external environment, you need to design to make up for it.
3. It is convenient for designers and owners to communicate on the spot.
If the owner has certain ideas about the design of the house, when measuring on the spot, you can communicate with the designer to see if these ideas are feasible, and the communication is more effective. In addition, if the owner needs to order the main material in advance, he also needs to communicate with the designer on site before making a decision.
4. Ensure the quality of house decoration in the later stage.
Only when the measuring room is more accurate, can we make an accurate design, so that it will not be impossible to achieve it because of the wrong size in the later construction, and design changes or project changes need to be made. If the location of some items such as water supply, heating, and gas is not measured or the measurement is not accurate, it may lead to the return or exchange of toilets and basins purchased later due to the wrong size and inability to install.
-
At first, I looked at the room type and sketched it. When sketching, it is best to start with a general frame. This can be positioned. The focus is to carefully draw the walls and windows. location. At the beginning of the measurement. Draw a few more times and become proficient.
-
Go buy an infrared measuring instrument, and the number of wall to wall will come out.
-
Is it a pre-design measurement, right? My experience in measuring the house is to draw the floor plan of the house first, and then pay attention to the top of the place where there is a beam, the height and width of the beam and the distance between the beam and the parallel wall, many novices do not pay attention to this, and then the thickness of the main wall, the general load-bearing wall is plastered with cement to become 300, and the wall thickness of the restaurant and toilet should be paid attention to, because the walls in these places are sometimes thinner. Also pay attention to where the heating in the house is.
The length, width and height of the window, and the distance from the ground and the wall. The door is generally 2100 high, but the width is not uniform, and the door in the same room is not as wide. The distance of the door from the wall.
Some windows are bay windows, so you have to indicate how much of the window extends out. Some places extend 710
-
New to it! You don't have any great skills! It's just to practice more and observe more, and it's best to take a few photos on the spot** and come back!
It is also necessary to indicate on the diagram the location of the launching and downspout beams. It is necessary to distinguish between 24 walls, 18 walls and 12 walls. The easiest way is to measure each room, and then use the method of compressing or stretching the wall to ensure that you measure the size of the room!
-
200mm is the thickness of an ordinary wall, and it should be fine.
-
The most important part of the house is the structural part, but it is hidden, you can't see it, you can only see what flaws are on the waterproof cavity, look at the pipes, and the rest can be repaired by decorating and calling for a good house.
-
Pay wages according to the schedule, and earn more on the premise of ensuring quality.
-
Package the construction site, but the workers work slowly, is there any good way to solve it?
I think that if the wages paid to workers are more reasonable, and the workers are still slow to work, we should find ways to mobilize the enthusiasm of workers, and we can use an incentive mechanism to reward workers with good work performance, heavy workload and outstanding achievements. Workers should not be allowed to eat in a big pot, and rewards and punishments should be clearly distinguished, so that work efficiency can be effectively improved, work progress can be accelerated, and the problem of slow work of workers can be well solved.
I wish you a speedy completion of the construction site project you have contracted!
-
I'll teach you a method, you go to measure, a simple hand-drawn line, the outer line, and then directly offset in the CAD, remember that you paint the outer wall or the inner wall of the wall, we help people paint hand-painted every day, as long as he tells the size on the line, we wish there was a hand-painted it, that is already a luxury, I hope it can help you. M's CAD
-
Carry out a retest, the measurement points around the foundation pit are jointly measured with the known control points, etc., and the coordinates of the measurement points are reversed, and compared with the initial data to check whether there is displacement.
-
The datum point can be set in a stable place far away from the foundation pit, and the construction control network can be combined with the measurement to accurately determine its coordinates. The reference point is then used to observe the measurement points around the foundation pit. Calculate the coordinates of the measurement point, and calculate the horizontal displacement compared with the original coordinates (the number of reference points is set according to the actual setting, which is enough), which is actually the traverse method observation.
It is also possible to use the method of front rendezvous, and a distant and stable point should be selected as the orientation point when orienting. The distance between the survey site and the orientation point should generally not be less than the length of the intersection edge. A 1-second instrument was used to observe by round-tripping.
The calculation of the displacement value of the measurement point usually does not use the method of calculating the coordinates of the measurement point and comparing the coordinates of different observation periods to calculate the displacement value, but uses the change value of the observation value to calculate the displacement value directly.
-
The master makes a 15 cm height black cement baseboard, you can first determine the height and then pave the tape at 15 cm, and then directly scrape the cement slurry with a total scraper, and after the batch scraping is completed, tear off the tape, which is the standard 15 cm height baseboard.
-
This is skilled work.
If you do more, you will be faster.
-
This is a direct mold.
Everything else has certain differences.
After all, the situation is different.
The easiest way to keep a record of work on the construction site is for each person to make a separate table, do a day to remember a job, and do half a day to record half a day's work. A statistic comes every month, so that everything is remembered clearly. Each person draws according to the number of days per month, in the morning, afternoon and evening. >>>More
Quick acne lazy acne removal.
How to remove acne:
1. Wild chrysanthemum decoction water. >>>More
If I have the ability, the future technology will develop relatively quickly, and I hope to take a time vehicle to reach the parallel world of my dreams, or one day have superpowers and go to the parallel world.
**Policy. After the diagnosis is confirmed, drugs can be used to control the infection first, and then the thyroglossal duct cyst should be surgically removed as soon as possible to avoid recurrent infection, cancer and other adverse conditions. >>>More