Originally, the floor was paved with granite.
floor tiles, re-surfacing parquet flooring.
Attention needs to be paid to waterproofing. If the granite floor tiles are more than a meter from the ground to the top surface, they do not need to be removed and retained, and the laminate floor can be laid directly on them.
If it is less than a meter, the granite part will have to be removed, otherwise the whole space will be oppressive and the residents will be very uncomfortable. If the ground is leveled with the porcelain leveling treasure of Zhongdi new materials, the flatness of the ground can basically meet the requirements.
1.The original ground cannot be hollowed out or damaged in a large area, and the wooden floor can be directly paved. If only part of the damage is made, only part of the tiles can be smashed, and it can be repaired to meet the requirements of the wooden floor.
Try not to use the keel to lay the wooden floor, because if the flatness of the old floor itself is not good, the flatness will be worse after the keel is laid, and the wooden floor will be uneven in the later stage, and it will definitely be deformed if you step on it for a long time. Adding a layer of wood to the floor tiles will not only reduce the height of the room, but it will also make the space feel oppressive. Moreover, the contact surface in front of the floor is glazed, which is easy to warp after a long time.
The best way to do this is to remove the tiles, re-level them, and lay a wooden floor.
2.Laminate flooring should be installed with good lighting. It is necessary to determine the installation direction of laminate flooring.
The lighting adjustment is generally parallel to the light, but the light should not be too strong. If the light is strong, thick blackout curtains can be used. If the lighting adjustment is not very good, it is better to be parallel to the direction of the long side of the room.
Laminate flooring will be installed using glue. If the glue spills during installation, do not wipe it off immediately. You can wait for the glue to dry and solidify slowly, then gently remove the glue with a plastic spatula, and then wipe it clean with a damp rag.
3.It is possible to buy tile adhesives.
Apply to old tiles and stick them directly. Local cavities can be shoveled out and then repaired. After parallel to other tiles, floor tiles and floors can be laid.
Laying wooden floors and floor tiles directly on top of the original floor tiles will cause the problem of floor height, but only one or two rooms in the local area will have a difference of 2-3 cm from the floor height of other rooms, and all of them need to be laid. The above is the answer to the question of what problems need to be paid attention to when the original floor is paved with granite floor tiles and re-paved with composite floors.
-
If you don't want the original floor tiles, you need to consider the cost of demolition, including labor costs, if you don't care about the height of the space, the original floor tiles do not need to be removed, just lay on the top and floor.
-
It is necessary to pay attention to the underground water and electricity lines, but also to pay attention to the quality of the floor, and choose more professional personnel to install the floor, check whether the floor is smooth and whether the installation is beautiful. The previous granite floor tiles should be cleaned.
-
Measure the distance, do a good job of moisture-proof treatment on the floor, soak the tiles in water in advance, choose a strong glue, pay attention to these problems, so that the composite wood floor is stronger.
-
Be sure to re-level the ground, and then find a good master, and be sure to lay mute cotton underneath, and then be sure to pay attention to the treatment of gaps.
-
I propose to put the floor on top immediately without knocking on the floor tiles. Wooden floors must be leveled, and the flatness of the floor tiles is generally guaranteed, which is equivalent to having a better bottom layer. Even if it is slightly uneven, it will not harm the paving and application of the ground.
For it is not recommended to smash the floor tiles, the key depends on the economic development, if the height of the building is enough, immediately lay the floor tiles on the floor tiles, about 14mm above and below. If it is so high, it is a bit of a small loss, not to mention that compared with the wooden floor of the skeleton of the dragon, the relative height is not very large.
Originally, the pavement was paved with floor tiles, and the floor could be immediately subsidized on the floor tiles. The flatness of the in-situ floor tiles conforms to the operating regulations of the actual floor. Nowadays, there is a thin floor on the market, which is not harmful to the height of the building, and the difference between the size of the wooden floor and the original floor tile can be used with a special type of edge strip for the wooden floor, and the effect is very good, the style is more tight, and the cost is low.
If you take into account that the original floor tiles are not preserved, then you must take into account the cost of dismantling the floor turn, the floor tile parquet transformation must be labor costs and auxiliary materials, generally higher than the floor 1 3, if the original floor tiles are removed first, and then the wooden floor is laid again, it will take more than half of the decoration cost. Including the labor cost of parallel lines**, we must pay attention to the wooden floor again, the pavement must be consistent with the design elevation, and the height-width ratio of the floor tiles and the pavement in the entrance must ensure that the standard specifications of the design plan are in order to ensure that the solid wood floor is installed and the floor tile level.
If you have to replace the parquet flooring, it is advisable to replace the laminate flooring from 0,8 to 1,2 or the double parquet with 1,5 solid wood panels. First of all, the inner door was temporarily removed, and then the surrounding baseboard was removed. After the above two items are removed, the wooden floor can be paved after clarifying the environmental hygiene.
First pave two mm thick waterproof and soundproof membrane, the wooden floor is gradually paved from one side to the wall one centimeter, the house and the large living room are best paved separately, and the junction can be pressed with (T) aluminum strips. The intersection of the large living room and the cupboard is only the glass sliding door that is paved to the family kitchen, pressed with (L)-shaped aluminum strips, and the same method is used for the sliding door of the house and the veranda. Once all the tiles have been laid, nail the wooden baseboards between the walls.
For the high bottom, at the bottom of the blackboard according to the wooden floor surface, leave three to five mm of indoor space, the rest of the laser cut off, in order to better maximize the maximum not to destroy the car lighting, first use a carpentry knife to cut five more knives around the front and back sides, and then use a manual cutting machine to gradually remove the bottom of the marking. After the excision, the corners are poured around and then pressed.
-
Quality issues, safety issues, environmental issues, income issues, family pressure issues.
-
When the original wooden floor is on the same level as the new floor tiles, they can be connected with copper strips. Because the copper material has excellent ductility, good sound reduction function, high corrosion resistance and strong wear resistance. If the wooden floor is not on the same level as the newly laid floor tiles, it can be connected with a lintel, which can be used as a step to form a gradient to divide it.
-
If the original wooden floor is re-tiled, the wooden floor must be removed before the floor tiles are laid. It is impossible to add floor tiles to the wooden floor. If it cannot be connected, the floor tiles will also be hollow, which will increase the height of the ground, and the indoor ground will have a height difference, and the door will not be opened, which will affect the residence.
-
Answer: There are several ways to deal with it 1. Leave the seam treatment, and the gap is silicone 2. Use copper strips or the same strips as the floor at the joints 3. High and low seam treatment, in laying, you can take the practice that the floor is 1cm higher than the floor tiles, and 2 can take close joint measures, and only need to close the mouth of the floor At the junction of the floor and the floor tiles, the floor is prone to moisture, wetness, deformation, blackening and other phenomena. How to avoid it needs to be dealt with in the process. It is true that the floor is higher than the floor tile 1, or due to the uneven ground of the original room, the formation of a height difference (but such a property is less), the height is different, this situation does exist, but no matter how uneven the ground of the floor is laid, it is always necessary to level the treatment, and the laying of the floor tile is also sure to be leveled to improve the treatment, there is a construction process problem here, whether the floor tile is directly lower than the floor (this practice is the laziest), or the floor tile and the floor leave about 24cm partition layer, The partition layer will increase the height difference (the partition layer is treated with tiles or marble, and the practice of marble is commonly used by Nanhui people), so it should be treated on this profile, first paved with floor tiles, and then done with partition layer water insulation treatment (with PVC plastic cloth double dressing), about 7 days to remove, and then do the ground joist, 7 days later and then lay the floor (the hardening cycle of cement mortar is about 14 days, to reach about 80% of the due hardness and condensation), so the construction technology and process is good and correct.
Hope it helps, dear
-
Between the floor and the floor tiles, the threshold stone is used to bridge the connection, and then the metal buckle is closed.
-
2000 paved wooden floor, how to connect the new floor tiles after the old wooden floor heart is connected, you can use an allergy between the two, or there or with splicing some patterns should be able to connect it to look better.
-
Summary. If you want to re-tile, you can lay it directly on top, and if you want to lay a wooden floor, you need to lay some on top of the tiles. Moisture-proof paper, to avoid laying wooden floors on top of it at that time, moisture and dampness.
Hello, do you want to re-til, do you want to re-tile or put a wooden floor on top of the tiles?
If you re-lay the tiles, you can directly lay Chang Tomato on it, and if you want to lay the wooden floor, Hui Xun is cautious, and you need to lay some on the top of the tiles. Moisture-proof paper, avoid laying wooden floors on top of it when the time comes, and return to the damp base before the base.
Tiled flooring.
The newly renovated tiles are not good, so I want to lay wooden floors.
You can lay the wooden floor on it, and you can ask the master who lays the wooden floor to smooth out the uneven place when you lay it.
How much does 115 square meters cost? Can I have a balcony?
How much does 115 square meters cost? Can I have a balcony?
The wall tiles are also not good, can they be knocked off?
Hello, you can also tear it down if you want, it is not good to have wooden floors on the balcony, unless your balcony is closed.
If you knock out the wall tiles, then you can't lay wooden floors on the wall, you can only knock the wall tiles and you can do something else.
**I don't know too much about the aspect, because the specific price of the Li's ruler and the wages of the worker, I don't know much about nuclear resistance, I recommend that you go to the building materials market to ask, and it is better to consult the height of the limbs.
Isn't it troublesome? Let this brick-laying person die, the floor and wall tiles are uneven, and there are many broken ones.
It's a bit more troublesome.
-
Laminate flooring has many advantages, it feels good on the feet and is warm in winter and cool in summer, which is the main reason why many people like it. Moreover, laminate flooring can make the home more textured and more beautiful. However, when laying laminate flooring, we should pay attention to the following aspects.
First, the ground must be flat and clean before installation.
Because the home was originally made of granite floor tiles, it may be necessary to pry off all these original granite floor tiles before laying them. Then remember to repair the floor again after prying to keep it level.
At the same time, do not hit the keel, and do not fix it with reinforced concrete, the gap should be 30 30cm.
Second, it is necessary to ensure that the interface between the two floors is stronger and not easy to loosen.
Before installation, special fixing glue should be applied to the horizontal and vertical interface positions of the floor, and the floor should be knocked on the side, so that the interface can be better fixed.
At the same time, pay attention to the height of the gaps around the floor and walls when installing. When laying the floor, in order to maintain a fixed distance from the wall, you can also use a small wooden board around the floor to maintain a consistent distance.
Third, when encountering irregular corners, pay attention to ensure the expansion joints.
Laying composite wood flooring is actually to do a good job in the details, which can reflect the quality of the construction.
Fourth, if the gap between the floor and the wall cabinet cannot be covered with a baseboard, then it is necessary to use PVC material buckles to seal it. This ensures that the laminate flooring is fully installed and that there are no other after-effects.
Whether the floor is laid well or not has a lot to do with the master's skills, so it is necessary to find a professional construction team to carry out the laying.
-
Find a professional master to deal with it, the previous bricks need to be removed, and the new floor should also pay attention to the gaps, you can't do it yourself.
-
Pay attention to the maintenance of the wooden floor, the wooden floor is easy to break, and it must be kept dry.
-
The most important thing is to ensure that the original floor is clean and tidy before installation, and there are no protrusions, otherwise the wooden floor will be insulated.
-
If you want to resurface the floor, you must pay attention to whether the material of the floor can be blended with the previous material.
-
You can directly lay it on top and find a trustworthy master, and the master's skill is very important.
-
Find a professional to deal with it, but before installation, the ground must be level and tidy.
-
There are actually nothing to pay attention to, and you can directly lay wooden floors.
-
I think if you want a new mural and wallpaper, you should first remove the porcelain baseboard and polish the putty here。Once the wall is repaired, you can place it on the floor. The door should talk to the paving master and deal with them as soon as possible.
The bottom needs to be sawed off with a saw blade.
However, it must be dealt with before the construction begins, otherwise the following procedures will be difficult to do well. There is no need to worry about the weight of the tiles. The load-bearing capacity of the house is not bad, it can fully support the weight of the tiles.
It is worth noting that the floor should be flat enough to allow for the laying of the floor. In addition, it is better to use laminate flooring and lay a layer of moisture-proof board. Even if there is moisture on the floor, there is no fear of letting moisture into the wooden floor.
Before the construction begins, we should take care to invite professional masters to come and see. If there is no problem, we will purchase the installation materials. In general, we will drill a little bit into the door so that the floor can be completely laid, and then we will wrap the edges.
If the tile is hollowed out, the hollowed out tile must be removed first. It's really fine to flatten the tiles before laying the floor.
Before construction, it is necessary to re-check the pre-determined laying direction and method together with the worker. In addition, a few more bags of flooring should be opened to check the color and texture changes of the floor with the worker. Determine if it is placed randomly or after being divided into depths and colors.
Floor tile purchase tips:
1. Anti-slip test: Floor tiles generally include glazed tiles, full-body tiles and all-body polished tiles, which all have one thing in common, that is, they are not anti-slip. Although beautiful, simple and generous, it is not particularly suitable for owners and friends who have elderly and children at home to decorate and buy, it is recommended to do an anti-slip test when purchasing, just in case. >>>More
1. What is the reason for the hollowing of the drum?
When laying cement or adhesive is not filled well, in the floor tiles. >>>More
Laminate flooring and laminate flooring are the same thing, but call a cat a mito; Hardwood flooring is what you need to be at home. I think the balcony and the living room are at the same height without a problem. Balconies can have wooden floors. >>>More
This practice is too tricky, the bathroom is the place where water is used most frequently, the focus of this area should be waterproof, dry paving can not meet the requirements at all.
1. Calculate the number of tiles according to the area.
1) First of all, measure the size of the ground wall of the paving space, and calculate the area (length and width). >>>More