-
One: 1200 square meters of workshop without driving. Civil engineering (150-200 square meters) + steel structure 300 square meters (wall veneer, roof veneer plus insulation cotton and steel wire mesh) = 500 square meters.
Total: 60-700,000. If you simply use round pipes and angle steel to make a workshop steel structure, you can save 100 square meters.
You can also save some points in civil engineering. About 400 square meters can be taken down, and you can't get a real estate certificate if you do this. Guan Jian depends on how you do it, in simple it may be lower, all according to your ideas.
Two: the fence is about 100-150 meters, you can also supply the material yourself, which can save more.
Three: the office building is only 300 square meters, the general building is not happy to do, and only the kind of construction team in the countryside is called to do, the materials you supply, they package the work, the labor may be about 100,000 processing materials, so a total of about 300,000 or so.
Four: the road and workshop level, according to the owner's usage. Comes and goes big. The workshop generally does about 100,000 yuan.
For reference only, the drawings shall prevail. If you want to save money, you can find the construction team to produce drawings, they know that there can be saved, there can be saved, and the design institute is too conservative.
-
I am a merchant who builds a factory, and I can only help you calculate the cost of the iron factory: 150 yuan per square meter, about 180,000.
-
The main body of 1200 square meters is multiplied by 600 yuan square cost price, the 1200 square meters of the iron house is multiplied by 200 yuan square meters, and the 300 square frame structure floor is multiplied by 800 yuan square meters. Fence 18 walls about 100 yuan a meter. This gives you an approximate total cost.
I hope it can help you, remember to give me points.
-
Where? What are the requirements? What material is used for roof panels? Do you want windows and doors?
-
According to the law, compensation shall be given for the expropriation of land. The land is owned by the state or the collective, so the compensation for the land should belong to the state or the collective, but the compensation for the attachments on the ground should belong to the property owner. Therefore, the buildings and factories you build can be compensated according to the compensation standard.
-
The steel structure is about 30,000, the civil engineering is aluminum alloy doors and windows, and the cement is poured on the ground about 50,000, a total of 80,000.
-
Specific circumstances are analyzed on a case-by-case basis. It also depends on the requirements of your house.
Generally, no piling, the exterior walls are ordinary paint. Basic national mandatory energy-saving requirements. 1600 yuan square!
-
If there are drawings.
I can help you calculate the cost.
The charge is based on the total cost.
-
According to what you said, it should be an independent foundation, and the basic cost is 280 300 yuan m2. The above are all rigid structures, the cost is 320 350 yuan m2 (your plant should be a span, the maximum span should be 18 meters, it is calculated according to this), the total cost is about 600 650 yuan m2, this is the price of Shenyang, you refer to it.
The brick-concrete structure has 7 floors, and you didn't say that there is no sloped roof, and you will be given 2 prices.
None: 850 yuan m2 or so Yes: 870 890 yuan or so.
-
1。According to your requirements: 5000 square meters, floor height meters, made into a standard steel structure workshop, unit price per square meter: about 600 yuan, excluding fireproof coatings, and epoxy flooring.
2。Build a 7-storey brick and concrete building covering an area of 2,000 yuan, about 9,000 yuan per square meter, and the total price is about 18 million.
-
It's okay here in Zhuhai... Western..
-
The cheapest in my house Come buy my house.
It's hard to say, maybe it's a miscellaneous brand. Anyway, you're talking about the fancy dress type. In the local area, shopping malls go around and small clothes will always be found!
The master can help pick a name with 5 lines??? With gold, wood, water, fire, and earth. >>>More
Free to build the method.
3. Then select a province at random, click the "Search" button, select one of the displayed schools to enter, and then enter the name of the new group in the class name of "Register a new class", and finally click "OK". >>>More
There are many factors that affect the construction of cold storage, such as area, region, temperature, use of equipment, etc., and it is recommended that the landlord find a few more professional companies to choose the right one according to their actual situation.
See if you can understand no, just helped you do the first one. >>>More