Introduction: After buying a house, the first thing you need to decorate is the rough house, and many people are also facing the decoration of the rough house for the first time, and everyone's experience is not very rich, so there are often some misunderstandings. So what is the order of decoration of the rough house? <>
When you decorate the rough house, you must first ask the designer or design the structure of the whole house yourself, such as which place is used as a bedroom, which place needs to be installed with what furniture must have a detailed understanding, and the most important thing is to measure the area of the house first, and all the space of the house is drawn on the drawings according to the proportion, so as to better design the layout of the whole house. After having the design drawings, you can invite the decoration team to start the decoration of the whole house, and the owner must carefully design every corner of the house when making wallpaper, only the drawings are clear, and the workers will work in a more organized manner. <>
Water and electricity are very important to every family, we can not do without water and electricity in life, so after the design of the drawings can be installed on the waterway and electrical lines, we must buy water pipes and lines, after all, it is buried in the wall, if the quality is not good, it is very difficult to repair, and the installation of water and electricity lines should also be extra careful, it is recommended that you install more plug-ins, after all, in the later life there are a lot of electrical appliances, If the plug is insufficient, it is easy to cause inconvenience to everyone's life. <>
After installing the water and electricity lines, you can hang the ceilings of each room, and then paint the walls and ceilings. After these aspects are completed, you can start to paste the floor, for the choice of flooring, also according to everyone's preferences, there are tile floors, there are also wooden floors, each has its own benefits, when these are installed, you can also buy some wallpaper to decorate the wall, the rest is to buy some furniture.
-
1. Measure the size.
Before decorating, you should contact the designer to measure the size at home, draw a simple size drawing, and mark the area of each area. [To decorate, find Hujia].
2. Determine the plan.
After the size measurement, it is necessary to determine the design plan and budget with the decoration company, and sign the decoration contract after confirming that it is correct, so as to ensure that the use of both parties is not damaged.
3. Main body transformation.
After the preliminary work is ready, the main body can be dismantled and modified. Pay attention to clean up the garbage in time after construction, so as to facilitate subsequent construction.
4. Hydropower construction.
After the completion of the body demolition and reconstruction, the hydropower workers can enter the site for hydropower construction, and the lines should be kept at a certain distance during construction, and the wiring should be horizontal and vertical, so as not to affect each other.
5. Carpenters, bricklayers and oilmen enter the site.
After the hydropower renovation is completed, the carpenters, bricklayers and oilers can enter the site. The order of entry should be carried out in accordance with the principle of who is dirty first, so the bricklayer should be the first to paste the bricks, and then the carpenter enters the site to install the cabinet, and finally the painter paints, but when brushing the paint, the ground or finished product should be protected to avoid the paint dripping on it, which is not easy to clean.
6. Installation of building materials.
After the paint has dried, it is time to move on to the installation of building materials.
7. Cleaning. After the building materials are installed, it is necessary to clean the wasteland from top to bottom, and clean up the garbage, dust and impurities.
8. Soft decoration into the field.
After the cleaning is done, the soft decoration can enter the site, and the order of entry should be from large to small.
If you have any decoration problems, you can consult Hujia Decoration. The company adheres to the working policy of reputation first and quality first, operates in strict accordance with the ISO9001 international quality system management, and gradually forms the design concept and construction management system with Hujia characteristics. The company will continue to adhere to the attitude of treating people with integrity, advanced design concepts and the spirit of continuous innovation, to create model houses higher than industry standards for customers, and sincerely serve the society.
-
The order of decoration is to scrape putty first, then to paint, install doors, prepare to place furniture, and finally remove formaldehyde, paste wallpaper, through such decoration, can make a change in the blank house.
-
Be sure to change the doors and windows first, and at the same time you need to demolish the walls and build the walls, then you need to modify the water and electricity, and then you need to do hard and soft decoration, then you have to paint and scrape putty, and then you have to lay the floor, install doors and windows, and finally you need to place furniture.
-
First of all, the wall should be treated, then the door of the house should be changed, then the water and electricity should be changed, the floor tiles should be laid, the wall tiles should be pasted, the windows should be changed, then the cabinets should be customized, and finally the walls should be treated, and then the lights should be installed, and then some furniture should be installed.
-
First go to water and electricity, then do waterproof treatment on the bathroom, then you should paste tiles, do carpentry, and after that, you should paste wallpaper on the room, as well as the purchase of curtains and lamps.
-
When decorating the rough house, you should first get the water and electricity ready, then paint the wall and then the ceiling, and then go to pave the floor, and then buy some furniture.
-
The rough house is not treated with the wall, you can first treat the wall of the rough house, that is, you can treat the wall flat, and then brush putty and paint, so that the wall is very good.
-
What is the order of the decoration of the rough room? What do I need to buy before renovating?
1. Before decorating a vacant house, you need to choose a suitable decoration company. It's not that we have to choose big brands. As long as the reputation is good and the service is in place, it's fine.
At this time, it is generally necessary to compare the goods with three companies and determine a strong and well-served decoration company.
2. Design interior decoration, including the location of wardrobes, electrical appliances, power supply, space layout of the house, and interior decoration style, so that the construction can be carried out in an orderly manner, and temporary rectification will be avoided and the construction progress will be affected.
3. Arrange water pipelines. Since water pipes and wires are buried in walls and underground, it is necessary to choose quality water and power pipes and arrange them horizontally and vertically so that the quality of the replaceable protective pipes can be easily handled in case of problems at a later stage.
4. Next is the mobilization of bricklayers and carpenters. The exact construction time also depends on the process differences and geographical location. The order of bricklayers and carpenters is determined according to the actual situation. Due to the cross-construction of waterproofing and base layer, waterproof materials should be entered in time.
5. Painting walls and ceilings. Please note that before buying paint, it is necessary to measure the approximate area to be painted and then choose the amount of paint, which will avoid a lot of waste.
6. After the above work is completed, indoor cleaning and garbage removal are required. After indoor cleaning, various accessories, lamps, switch panels, wardrobes, etc. can be installed. Be careful not to damage doors, walls, and floors as much as possible so as not to affect use.
The main decoration materials of the rough house are: basic building materials. Basic building materials include cement, sand, etc.
You know, cement and sand are used to lay floor tiles, floors, and plaster walls. It can be said that without these two basic building materials, the renovation project would not have progressed. These two basic building materials must be of good quality to ensure the quality of the finish.
There are two main decorative materials for a blank room: the main material. Whether the house is a basic decoration, a simple decoration or a fine decoration, the main material is needed.
The main decorative materials include floor tiles, floors, waterproof boards, etc. The ** of the main material is also relatively high, but it is still recommended that qualified homeowners choose big brand green environmental protection decoration main materials to decorate their houses.
The main decoration materials of the blank house are: auxiliary materials. There are many kinds of auxiliary materials, including gypsum wires, electrical wires, water pipes, screws, bathrooms, cabinets, etc.
When it comes to choosing ancillary materials, many homeowners feel that they have little influence on the renovation and mostly choose to use materials of average quality. You know, auxiliary materials such as wires and water pipes need to be buried in the ground or in the wall, and they need to have good wear and corrosion resistance. Therefore, the auxiliary materials should also be of the highest quality.
-
Be sure to choose the right home improvement company, then sign the contract in advance, understand the renovation of water and electricity and the demolition and modification of the wall, and then pay attention to waterproofing. Then it is necessary to pay attention to the bricklayers and carpenters. To buy appliances, tiles, flooring, cabinets and much more.
-
It is very important to buy a variety of materials before decoration, such as cement and tiles.
-
When the rough house is renovated, the room should be measured first, and the materials that may be needed should be purchased before the decoration. Then it is necessary to choose according to the order of decoration.
-
1. Clarify the decoration area and understand the size of the wall.
Clarify the area involved in the renovation process. In particular, the area of tiling, wall paint, wallpaper, and flooring. Define the main wall dimensions. In particular, it is necessary to design the wall size for the furniture in the future.
2. Reasonable demolition and modification, and clever use of space.
It mainly includes demolishing walls, building walls, shoveling wall skins, dismantling heating, replacing plastic steel windows, etc. The garbage after demolition and modification should be cleaned out in time to ensure the cleanliness of the room, and it is also to facilitate construction.
Hydropower transformation, try not to regret it. The bricks are on the wall and the ceiling, and it is difficult to add sockets. So, be sure to determine the exact location of switches, lamps, basins, bathtubs, washing machines, etc.
Before the water and electricity transformation, the cabinet designer should come to the door to make the first measurement to help you determine the transformation plan of the power supply and waterway. For water heaters, it is also best to send someone to design the location of the power supply and interface according to the model you have determined.
3. Optimize the appearance of the pipeline and strengthen the decorative effect.
In general, the bathroom is installed the most, and the bathroom decoration is the most headache in our entire home decoration, which is not only non-slip, but also to ensure dryness, so optimize the appearance of the pipe, not only to prevent moisture, but also to play a decorative effect.
4. Ground decoration (tile points).
The ground is decorated with substance (tile points), and before tiling, it is necessary to buy a floor drain. After doing waterproofing and brushing, it is ready to be tiled. In addition to the normal tiling attention, tiles soaked in water, dry in the shade; In addition to the broken tiles for cutting, I personally emphasize the overall beauty of the tiles.
5. Beautify the walls of the rough room and make the walls beautiful.
Sticking wallpaper is much better than painting the wall. After the wall paint is painted, the oiler will brush the nitro paint where the wallpaper needs to be pasted, and the paint can dry the next day, and then you can ask the master to paste the wallpaper. Do not open the window for ventilation within 48 hours after the wallpaper is pasted, and let it dry slowly.
Tell the master that if there is a warp in a few places, you should trouble him to help fix it.
6. The socket installation is skillfully arranged.
The socket panel can be installed in about half a day.
-
Now many real estate projects are rough houses, so the owners can decorate the new house according to their own needs and preferences after going through the delivery procedures, but in the process of decoration of the rough house, you should pay attention to the order of decoration, so that the effect of the house decoration will be better, so what is the order of the decoration of the rough house?
1. Demolition and alteration of the main body.
The first thing to do in the decoration of the blank house is the main body of demolition and modification, including wall demolition, wall building, shoveling of wall skin, etc., after the completion of the demolition, the garbage needs to be cleaned up in time to ensure the cleanliness of the indoor environment, and it is also convenient for construction.
2. Hydropower transformation.
Then it comes to the steps of hydropower transformation, before the transformation, the carpenter should be invited to measure the door, determine the position of the cabinet, and then formulate the installation plan of the power supply and waterway, and the plan must be designed to the exact location of the switch socket, lamps, washing machines and other supplies.
3. Wrap riser and tile.
The kitchen and bathroom environment is relatively humid, and when wrapping the riser, do not use the wooden keel, even if it is not allowed to apply anticorrosive paint on the wooden keel. When paving floor tiles, be sure to check whether the ground is flat, so as to avoid problems such as warping and falling off when used in the future.
4. Paste wallpaper and install sockets.
As for the installation of the socket, you should choose the socket with a switch function, especially in the kitchen, so that when using kitchen appliances such as microwave ovens and rice cookers, you can do not need to plug and unplug the power supply.
5. Install cabinets and ceilings.
First of all, you need to install the bathroom water heater and bath bomb, after the installation is completed, the ceiling edge banding, and then install the cabinets, after all the decoration work is completed, the owner needs to find a regular cleaning company, clean every corner of the home, and finally you can arrange the furniture to enter.
Summary: What is the order of rough house decoration is the relevant content is introduced to you here, I hope to help friends in need. Before decorating the rough house, you should make preparations, buy decoration materials and tools, and also need to understand the construction skills, so as to decorate your house more beautifully.
-
The decoration can be roughly divided into three stages: design stage, hard decoration stage and soft decoration stage.
The first is the planning and design phase, which is a brainstorming phase and the basis for all work. We need to clarify the overall layout and design of the house, including colors, materials, furniture layout, etc. At this stage, the development of a budget and timeline is also crucial.
Design is the soul of the renovation, and the budget and timeline are the framework of the renovation, ensuring that our renovation plan is both visionary and realistic.
Next is the hard installation stage. We can understand this stage as giving to the house"Mounting bones"process. Including water and electricity retrofits, wall treatment, floor and ceiling installation, door and window installation, etc.
Remember, it's important to do it in the right order, with the water and electricity first, and then the walls. In this way, the secondary damage and cost caused by the modification of the water and electricity layout during the later decoration can be avoided. First of all, hydropower transformation is the key, laying the foundation for the use and safety of household appliances in the later stage, so it must be carried out under the guidance of professionals.
After the water and electricity renovation is completed, it is time for the wall to be treated, you can choose to paint the wall or paste wallpaper, and even consider installing a suspended ceiling to make the space visually better. Then it is the laying of flooring, and choose the appropriate flooring material according to your needs, such as solid wood flooring, laminate flooring, etc. At the same time, the replacement or renovation of doors and windows is also carried out at this stage, which can not only improve the safety of the house, but also facilitate lighting and insulation.
You may find that the work at this stage is a bit tedious, but only by doing these basic work well, can Xinqida ensure the smooth progress of the next soft decoration.
Finally, we moved on to the most creative soft furnishing stage. This stage can be understood as giving to the house"Gain muscle"The process that gives life to the house. The purchase and arrangement of furniture, curtains, lamps, decorations, etc., is carried out at this stage.
It is the process of giving life and personality to a house through furniture, lamps, decorations, etc. First of all, the furniture should be chosen with a combination of functionality and aesthetics in mind, but also in harmony with your hard-furnished style. Secondly, curtains, lamps, carpets, etc. are all important elements to add to the mood of the room, and you can choose the style and color according to your preferences.
In addition, wall decorations such as paintings and hanging decorations can also add to the artistic atmosphere of the interior. It is worth mentioning that soft decoration is not an overnight process, you can gradually add and adjust according to the needs and feelings of life.
Overall, renovation is a process that requires patience and care, and I hope this sequence will help you to do a better decoration. Remember, your home is your castle, and no matter the order of renovation, the most important thing is to create an environment that you feel comfortable with.
The range of simple decoration of the rough room is about 500-1000 yuan square meters. The exact cost will vary depending on the size of the house, the choice of renovation materials, and the complexity of the renovation project. >>>More
Before we carry out the renovation of the rough house, we need to accept the rough house delivered by the developer, and only then can we continue to carry out the next rough house decoration under the condition of ensuring that there is no problem with the preliminary acceptance. When decorating, we also need to pay special attention to the overall pattern, the transformation of water and electricity, the experiment of waterproofing, and the creation of some software facilities such as tiles and carpentry. >>>More
The first step is to check the route of the hydropower project in the room to see if the appliances you purchased are paired, and it is best to consult the hydropower installation so that he can help you update and transform. In case the problem is discovered after installation, it will be more troublesome to deal with. It is said that the rough room is also known as the "initial decoration room", generally there is only a door set in the room and no door, and the bottom edge of the wall is just a basic treatment, but the public location, public facilities, all kinds of water supply and drainage, drainage pipes, precipitation, radiators, boiling water and other pipelines are assembled in accordance with the design documents. >>>More
Rough house delivery standards: walls, ceilings, indoor doors and windows, various pipelines, water, electricity. Rough room inspection standards: ceiling, wall, floor, balcony, kitchen, bathroom.
Check whether the specifications of the door brand conform to the agreement of the annex to the contract, and if the anti-theft door is agreed, it should meet the national standard of the anti-theft door. Check whether there are scratches, collisions, corrosion and other phenomena that seriously affect the appearance on the surface of the door leaf, and whether the door leaf is installed perpendicular to the ground. Check that the door frame wraps around the edges, the hinges have obvious rust, and the door frame is installed vertically. >>>More