What aspects need to be checked during the acceptance of the embryo room?

Updated on home 2024-07-05
10 answers
  1. Anonymous users2024-02-12

    Check whether the specifications of the door brand conform to the agreement of the annex to the contract, and if the anti-theft door is agreed, it should meet the national standard of the anti-theft door. Check whether there are scratches, collisions, corrosion and other phenomena that seriously affect the appearance on the surface of the door leaf, and whether the door leaf is installed perpendicular to the ground. Check that the door frame wraps around the edges, the hinges have obvious rust, and the door frame is installed vertically.

    Check that doors open and close smoothly and agilely, and that there are no unusual sounds. whether the closure is strict; When the door is opened, whether the executor hits the wall; whether there is a phenomenon of "door fights"; Check the lock and confirm that the hand is securely installed. Whether the latch function is normal.

    Please make sure that the air-conditioning vents and air-conditioned seats are properly reserved. If the reservation is not reasonable, it may be inconvenient to install the machine or rainwater backflow. First of all, it is necessary to confirm whether each socket in the room is in normal use, whether the detection method can be detected with a pen, or you can use a charger with an indicator light to plug into the socket, and the socket is working normally after the indicator light is on.

    It is necessary to check whether the indoor inlet wires, electrical boxes, and weak current equipment are complete, and whether the incoming optical fibers are in place.

    In terms of water and electricity, let's talk about water first, and the precautions for water supply inspection are mainly to confirm whether there is water in the water pipes and faucets in each room** and whether they are complete. If there is no problem with the water supply, it is necessary to consider drainage. The main locations for acceptance drainage are basins, toilets, bathtubs, toilets, kitchens, and balcony floor leaks (murmuring sounds and water accumulation on the surface).

    There can be no standing water on the qualified ground. Because the ground is the lowest. However, because of the leakage of the blank floor, a certain height of the floor of the post-packaging will flow out.

    Try to make the water flow as loud and urgent, look at the water pressure, and try the drainage speed.

    You need to consult the air-conditioned seats and holes in the living room, south and north bedrooms. In particular, when inspecting the air-conditioning hole, be sure to check that the inside and outside are low. It's high on the outside and low on the inside, and when it rains, the rain pours in, which is a more troublesome thing.

    In particular, the air-conditioning hole is open on the back, and the irrigation is very serious. If this problem is discovered, the developer is strongly asked to plug the original hole and drill it again. The first step in the electricity inspection is to confirm whether the quantity and amount of electricity in the electric card and water card are consistent with the purchased quantity.

  2. Anonymous users2024-02-11

    The actual area of the house is measured. When checking the wiring, turn on all the lights to see if the lights are fully on, and then check if the socket is powered. Check whether the ground is flat and whether there is cracking and hollowing.

  3. Anonymous users2024-02-10

    1. Carefully check the area and floor type of the house. Compare whether the actual area of the house is consistent with the one marked on the purchase contract, and see if the house type is the same as written in the contract. 2. Carefully inspect the floor and walls of the house.

    To see if the floor of the house is flat, tap on the walls of the house to check if there is a hollow place on the wall, 3. Carefully check the sewer pipes of the house. There are many blank room sewers will be blocked, when the rough room inspection, you can prepare a bucket, fill it with water and pour it into the sewer pipe, no water overflow means that the pipe is unobstructed.

  4. Anonymous users2024-02-09

    1. It is necessary to check whether all the doors and windows in the rough room are damaged, whether the accessories are complete, the details (strong and weak electric boxes, the wiring in place), whether the drainage and sewage pipes are damaged, and whether the locks and handles are damaged. 2. All kinds of pipelines should be subject to acceptance work such as water flow, pressure test, ball test and heating thermal commissioning. 3. The roof project shall carry out water storage and water spraying tests.

    It is important to check whether the drainage of drainage pipes, sewage pipes, and floor drains is smooth and unobstructed. 4. The floor of the room with waterproof requirements should be planned in strict accordance with the building requirements of the waterproof layer and the protective layer, and two water storage tests should be carried out during the acceptance to achieve no leakage. Observe whether there are water traces, watermarks, etc. on the top of your house to prevent water leakage upstairs from causing trouble in the future.

  5. Anonymous users2024-02-08

    Check the waterproofing, check the doors and windows, check the actual living area, check the switches and sockets, check the construction situation, check whether the walls and floors are flat, check whether the walls are hollow, etc.

  6. Anonymous users2024-02-07

    Buying a house requires an investment of a large amount of savings, so you must be very careful when inspecting the house, many people are the first time to inspect the house, and there is no experience in the inspection of the embryo house.

    When inspecting the rough house, the owner had better bring a tape measure to measure the area of the house, compare whether the actual house area is consistent with the mark on the purchase contract, and then look around the house, and see if the house type is the same as what is written in the contract.

    When inspecting the rough room, the ground and walls of the house should also be carefully checked, first to see if the ground of the house is flat, especially to check whether there are pits on the ground at the corners of the wall, now most of the heating pipes of the house are under the cement layer, if there are pits on the ground, it is likely that the heating pipes buried below are also problematic, if you find that the ground of the house is damaged, you must communicate with the developer in time, and then tap the wall of the house to check whether the wall is hollow. If you find a hollow spot, mark it on the wall as well.

    When the rough room is inspected, there is another place where you must not forget to check, that is, the sewer pipe in the house, there are many sewers in the rough house will be blocked, when the rough room is inspected, you can prepare a bucket, fill it with water and pour it into the sewer pipe, no water overflow means that the pipe is unobstructed.

    Once the house is accepted, the problem can only be borne by the owner, so it is very important to say that the rough house inspection, before the house inspection, we should look at some knowledge about the house acceptance, so as to know what should be paid attention to, to ensure that there will be no mistakes in the acceptance.

    You can get it for free

  7. Anonymous users2024-02-06

    Some owners think that the construction of the rough house is less, and there is no need to accept it after the decoration. This is not right, the rough house and the hardcover house, the same need to check the quality of the house, so as to be able to find the problems in the construction in time, to ensure the safety and convenience of living in the future. On the question of whether it is necessary to inspect the rough house, yes.

    So what places need to be accepted for the inspection of the rough room? There are five main aspects: wall, ground, roof, water and electricity, doors and windows.

    It can be said that the wall is the largest construction area of the project, and it also affects the quality and structure of the house. First of all, check the surface of the wall to see if it is smooth and if there are no cracks. You also need to look at the putty painted on the wall, if there will be mud if you splash water on the wall, it means that the putty used is unqualified and has no waterproof function.

    Check whether the ground is flat and whether there is cracking, anti-sand or hollowing. The hollow drum can be inspected with the help of a tool, and the wall can be gently tapped with a small hammer to distinguish from the sound. If there is a hollow drum, mark this place and repair it in time.

    The acceptance of the roof is easy to be overlooked, but it is also the most prone to problems after living in it, so it is necessary to pay special attention to the waterproofing of the roof. Check whether the yin and yang angles of the roof are straight, if it is not on a flat line with the wall, it needs to be leveled and repaired, and then use putty to level after the plaster is low.

    Daily life is inseparable from the cracking and use of hydropower, and if the hydropower project is not done well, it will cause great trouble to home life. The acceptance of the waterway needs to be tested accordingly, and the pipes installed in the room are closed water and pressure test respectively. For circuit acceptance, the rationality of the circuit should be checked, whether it meets the electricity demand of electrical appliances, and ensure that each switch and socket can be used normally.

    Windows and doors should be installed firmly, meet the standards, and be tested for opening and closing, whether it is smooth and free of resistance. At the same time, pay attention to the sealing between the windows, there is no loosening, exposure, to ensure waterproof, sound insulation and warmth.

    You can get it for free

  8. Anonymous users2024-02-05

    Housing prices are rising every day, and for us with limited conditions, we can only buy relatively cheap rough houses. Although the rough room is not as luxurious as the commercial house, it is also very beautiful if it is decently decorated. Then the inspection is an important part of the decoration.

    If the inspection is careful, it can not only ensure the convenience of our future residence, but also ensure the quality of decoration. So how to inspect the embryo room? What are the steps?

    Let's take a look.

    1. What are the steps to inspect the embryo room?

    1. Look at the outside first.

    When inspecting the embryo room, the exterior should be inspected first. For example, the tiles, paint, unit doors and stairways of the exterior walls should be carefully inspected.

    2. Check the interior again.

    When inspecting the embryo room, it is also necessary to pay attention to its internal inspection. Such as: doors and windows, ceilings, walls, floors, and waterproof water storage.

    3. Measure adjacency.

    When inspecting the embryo room, because of the problems such as closed water test and water meter idling, it is necessary to cooperate with the upstairs and downstairs neighbors.

    1. Don't watch it at night and don't watch it during the day.

    The purpose of this is to find out what happens to the noise, lighting, and safety around the house after dark.

    2. Look at it on a rainy day and regret not looking at it on a sunny day.

    When inspecting the rough room, choose to inspect it on a rainy day, the purpose of which is to have a comprehensive understanding of the bearing capacity and moisture-proof capacity of the house. It can better check for rain leakage and water infiltration.

    3. Look at the pattern and not look at the building materials.

    When inspecting the rough room, we should look at the design pattern, not the beauty of the building materials, in case the building materials are flashy. If the design pattern is not good, it is useless in beautiful building materials.

    4. Look at the corner of the wall and not at the ground.

    When inspecting the embryo room, you should see whether the corners of the wall are flat, whether there are cracks, if it is a new wallpaper that has just been pasted, you should pay more attention, and observe the bearing capacity of the corners.

    5. Look at the workmanship and regret the key to regret the decoration.

    When inspecting the rough room, it is also necessary to look at the fineness of the workmanship, especially the workmanship of each window edge, wall corner and ceiling.

    6. Look out the window and don't look at the curtains.

    When inspecting the embryo room, it is necessary to look out the window to judge its lighting and ventilation. Rather than looking at the beautiful performance of the curtains.

    Well, the above is the relevant introduction to the steps of testing the embryo room, do you understand it clearly? I hope that the results of the collation can provide some help to people in need.

  9. Anonymous users2024-02-04

    How to accept the embryo room? Keep these seven points in mind.

  10. Anonymous users2024-02-03

    First, measure the actual area of the room.

    According to the floor area and drawings of the suite provided in the handover letter, the buyer can measure it on the spot. If the error is large, they can ask the developer or commission a professional organization to retest. You can also let the decoration company send someone to measure the size directly, saving you trouble in the future.

    2. Hydropower inspection.

    If the water and electricity are not smooth, even the basic living needs will have problems in the future, so be sure to check the water and electricity infrastructure before renovating.

    It is important to check the following details:

    1.Pay attention to check whether the sewer pipe is unobstructed and unobstructed. You can tell by the speed of the water flow and the sound of the flowing water.

    2.Check the strong and weak power supply in the room to see if it is normally available.

    3.In order to ensure the safety of electricity in the future, it is necessary to test the insulation resistance value of indoor wires. No problem is considered qualified.

    Three. Wall condition checks.

    The quality of the walls of some houses is not good, and it is easy to crack the wall, fall off the tiles, and seep water into the wall after decoration. Therefore, the acceptance of the wall is very important when the rough house is accepted.

    1. Check if the wall is empty.

    A common problem of rough houses is the problem of hollow walls. Hollow drums on the wall can be knocked out with a small hammer. If there is a drum sound, it means that there is a hollow drum. If the hollowing phenomenon is not treated, the topcoat will fall off, so you must pay attention to it.

    2.Measure the verticality and flatness of the wall.

    In addition to checking whether the wall is flat, also check whether the wall is vertical and sloping. In addition to visual inspection, the flatness and verticality of the wall can also be detected with tools such as rulers and corner rulers.

    Four. Check the ground condition of the building.

    1. Check whether the ground is flat.

    In general, there are two types of uneven ground. One is an uneven local area with small holes, mainly in the corners of walls or doors; The other is a large area of unevenness, which can be detected by visual inspection or an infrared level. If there is an unevenness, be sure to re-level, otherwise both the tiles and the floor will be affected.

    2.Inspect the ground for cracks and dents.

    Whether the ground is cracked can be visually inspected, but whether it is hollowed out needs to be detected by a quality inspection hammer tool. Cracks and cavities usually appear at the same time, but some appear separately. The hollow cracking of the ground will directly affect the later decoration construction, so we must be cautious when accepting.

    3. Check whether there is sand on the ground.

    If there is floating ash and sand on the ground, the ground will become soft. So, what causes sand on the ground? Generally, the cement label is not standard or expired, the mud content of the sand is too large, the cement mortar ratio is improper, and the maintenance is not in place. , which can lead to sand on the ground.

    5. Check the installation quality of doors, windows and accessories.

    Doors and windows are related to the safety of the owner's residence. Therefore, the owner should carefully check whether the model and materials are in accordance with the contract, and also check the flexibility and tightness of the doors and windows, the shortage and damage of spare parts.

Related questions
18 answers2024-07-05

Introduction: Nowadays, most of the houses sold on the market are rough houses, because the house prices of rough houses are relatively cheap, and we need to accept them after buying a rough house, so do you have an understanding of the pipeline of the acceptance of the rough house? Next, let me introduce to you how to accept the pipes of the rough room! >>>More

11 answers2024-07-05

Before we carry out the renovation of the rough house, we need to accept the rough house delivered by the developer, and only then can we continue to carry out the next rough house decoration under the condition of ensuring that there is no problem with the preliminary acceptance. When decorating, we also need to pay special attention to the overall pattern, the transformation of water and electricity, the experiment of waterproofing, and the creation of some software facilities such as tiles and carpentry. >>>More

9 answers2024-07-05

The first step is to check the route of the hydropower project in the room to see if the appliances you purchased are paired, and it is best to consult the hydropower installation so that he can help you update and transform. In case the problem is discovered after installation, it will be more troublesome to deal with. It is said that the rough room is also known as the "initial decoration room", generally there is only a door set in the room and no door, and the bottom edge of the wall is just a basic treatment, but the public location, public facilities, all kinds of water supply and drainage, drainage pipes, precipitation, radiators, boiling water and other pipelines are assembled in accordance with the design documents. >>>More

13 answers2024-07-05

Choosing a reasonable machine for foot strength exercises is enough.

8 answers2024-07-05

First, the cost of raw materials, which must be considered; second, labor costs, human labor costs are indispensable; Third, the cost of intellectual property, which is respect for the creator.