How long does it take to dry with tiles on the walls in the summer

Updated on home 2024-07-14
17 answers
  1. Anonymous users2024-02-12

    No problem, you can take a shower after 24 hours, but don't step on the few pieces on the ground in the corner.

  2. Anonymous users2024-02-11

    The wall is still on the ground, and if there is glue in the gap on the wall, it is best to wait for two more days if it is on the ground.

  3. Anonymous users2024-02-10

    In the summer, the wall tiles can be dried in about two days.

    How to tile the wall:

    Clean the brick wall, flatten it with 1:3 cement mortar, grind it flat, and shave it with an iron sheet, requiring the wall to be vertical and the corners square. If the wall is painted with white ash or other paint, the gray skin and coating need to be shoveled off, and the exposed cement mortar surface should be brushed and moistened before being done.

    Pop up horizontal or vertical lines on the scraped wall as a basis for pasting the first row of wall tiles.

    Before pasting, the wall tiles should be soaked in water for 1-2 hours, and after removing and drying, scrape the cement paper mortar on the back of the tile with a shovel or iron sheet (cement: paper tendon lime = or cement slurry with 107 glue. Paste from bottom to top in the shape of a pint or a field shape.

    Whenever a row of tiles is laid, a long ruler should be used to check the baseline so that the wall is flat and the vertical and horizontal joints are straight. The gap width should not exceed millimeters.

    After laying a part of the bricks, wipe the mortar on the surface of the tiles with a dry cloth.

    Use a soft and dry white cement slurry to fill all the gaps between the tiles and fill them tightly. Finally, use a dry cloth to smooth out the gaps and wipe the tiles clean.

  4. Anonymous users2024-02-09

    The tiles generally dry in 2-3 days.

    Precautions for tiling:

    1. The tiles are soaked in water on demand.

    Wall tiles generally need to be soaked in water before paving, and the tiles that have been soaked in water affect the secondary sales, and the manufacturers or merchants generally cannot return them, which will cause unnecessary waste. Suggestion: To combine the construction progress of the workers, how much you need to soak, don't soak it all at once.

    2. Make a plan for arranging tiles before paving.

    Some construction workers paved as soon as they got the bricks, and only found that the proportions were not coordinated when they were paved to a certain extent, and then removed and re-paved, resulting in unnecessary loss and waste. Suggestion: Make a plan for paving bricks before paving.

    3. Remind workers to notify in time if they find tile problems.

    Don't wait until the paving is done to find out the problem, causing the construction party and the material party to pass the buck to each other. Suggestion: Clearly tell the workers before construction, and notify them in time when they find ceramic tile quality problems, so that they can ask the material party and the construction party to identify and solve the problem together.

    4. Correctly mix the mixing ratio of cement and sand.

    The proportion of cement is large, and the bricks can be quickly sticked, but the expansion coefficient of cement mortar is large, and it is easy to squeeze the bricks after paving. Suggestion: The mixed ratio of cement and sand is 1:3 for wall tiles, 1:2 for floor tiles, and cement for cement.

    5. Be careful in tile processing.

    Especially when the wall tiles touch the sunny corner, be careful not to destroy the glaze layer of the tiles, and pay attention to the gaps when connecting, not too small. Some tiles that need to be cut are better, and they can be delivered after being cut by the material dealer when they are purchased.

  5. Anonymous users2024-02-08

    Under normal circumstances, cement mortar will begin to solidify after 2 hours, and you can walk around on it after 48 hours, but it takes days to completely dry, so after 24 hours, you can cover the sawdust at room temperature for 48 hours, and do not step on it during the curing period until it is stable. Reason: The floor tiles are a mixture of cement and yellow sand, mainly yellow sand, only a small amount of cement, and basically dry, do not need to wait for a long time to solidify.

    When laying the floor tiles, after being hammered hard by a rubber hammer, it has been mixed with the yellow sand below, and it does not move its position very much.

    I hope it can help you, and if you still have questions, click on the avatar and wait for you to tease

  6. Anonymous users2024-02-07

    20 minutes – ranging from an hour. The speed of tile glue drying is relatively fast, and the specific degree depends on the thickness of the glue. If the glue is relatively thin, it usually takes about 20 minutes to dry.

    If the glue is thicker, you may have to wait for an hour or more.

  7. Anonymous users2024-02-06

    Depending on the ventilation conditions and temperature, it takes fifteen days for normal condensation. It takes a month to dry out.

  8. Anonymous users2024-02-05

    Generally, the floor tiles are wet paved with cement mortar, and the floor tiles can be completely dried after 5-7 days after being pasted in summer, and it generally takes 15-30 days in winter.

  9. Anonymous users2024-02-04

    It takes about a week in the summer and a month in the winter. Depending on room ventilation, temperature, humidity, let's treat it specifically.

  10. Anonymous users2024-02-03

    If the wall is damp, you can do a good job of waterproofing before pasting the wall tiles.

    How to put wall tiles:

    1. Selection and treatment of bricks.

    Check the quality of the bricks, select bricks with uniform color, consistent size, neat edges, smooth and flat surface, and classify and stack bricks of different specifications, varieties and color numbers.

    2. Basic treatment.

    Clean up the base layer, the uneven wall should be chiseled or pre-filled, and then watered to moisten the surface, and then plastered with bottom ash, the bottom ash is generally 1 3-1 4 cement mortar, thick 7 12mm, scraping, rubbing, curing 1 2d. When the base layer is a concrete wall, a 107 glue cement slurry should be brushed as a binding layer, and then the bottom ash should be wiped after 2D. The bottom ash layer requires a flat surface and a vertical façade.

    3. The elastic line is embedded.

    Depending on the wall size as well as the size of the brick, pop up the horizontal and vertical control lines of the brick. The pre-arrangement generally starts from the sunny corner, and the non-whole bricks are arranged in the secondary part or the shady corner of the wall. Use waste tiles to plaster cement mixed mortar as a marker block, the spacing of the marker block is 1-, and the supporting board, ruler and other hanging straightening are used to control the surface flatness.

    4. Tiling. Soak the bricks in clean water for 2-3 hours, remove them to dry or wipe off the water. The mortar can be paved with 1 mud mortar, or with cement 107 glue water 100 5 26 pure cement slurry to increase the binding viscosity. When paving, first wet the bottom ash layer with water, and then plaster the back of the tile with mortar, scrape the four sides into an inclined plane, paste it on the bottom ash layer that has not been set with the line as a mark, and gently tap the tile with the ash spoon handle after being in place, so that it is glued firmly and flat, and check the flatness and gaps for each paste.

    The size of the gap should meet the design requirements. The exterior wall brick paving should be carried out from top to bottom, from left to right, and the construction height of the exterior wall is generally daily.

    5. Hook seam. After the paving is completed, the cement dirt must be removed within 4 hours, the surface ash must be swept away, the joints should be scratched with bamboo sticks, the surface should be scrubbed with cloth and silk cotton, and the joints should be wiped with a long-bristled brush dipped in the same color cement slurry, and the gaps should be evenly compacted, and finally cleaned with cotton silk, sandpaper or dilute hydrochloric acid brushing, and washed with water.

  11. Anonymous users2024-02-02

    Whether a damp wall can be tiled or not is closely related to the degree of moisture of the wall, that is, the moisture content of the wall.

    This statement is more general, and it is not easy to determine the degree of dampness of the wall, so we can use the soil method to determine it. We can use dry powder cement to sprinkle on the wall, after the wall adsorbs cement, the base color of the wall is obvious, indicating that the moisture content of such a wall is not high, and the tile can be paved. If the dry powder cement is sprinkled on the wall and adsorbed, the base color of the wall is basically blocked, which means that the moisture content of the wall is too high, and the tiles cannot be paved according to the conventional operation.

    When laying tiles on walls with too high moisture content, a certain proportion of glass water (used in casting molds) should be mixed into the tile adhesive or cement mortar, which can accelerate the solidification of cement mortar. The specific ratio can be determined depending on the humidity of the wall, and the mixed glass water mortar must be a small amount, at most not more than the amount of mortar for paving ten tiles. If you pay attention to quick drying, the amount of mortar used for a tile should be mixed with glass water, otherwise it will be too late to use it if it is mixed too much, and the mortar will be wasted if it solidifies.

  12. Anonymous users2024-02-01

    In the southern city, due to the dampness, the ventilation on the first floor is not very good, and the air humidity is high in the rainy season, and the water droplets often appear on the wall of the house, so the use of tiles on the wall of the whole house can prevent the impact of moisture on the wall, and there is no need to worry about the yellowing and falling off of the wall. 2.In many cases, the low-rise residents of the community, especially the lighting on the first floor, will be affected by the greening of the community and the spacing of the real estate, and the lights should be turned on indoors even in the daytime, in this case, the living room tiles will increase the brightness of the house, so that the overall effect of the house increases.

    This is deeply experienced by the owners who live in the community and are affected by the distance between the buildings and the greening of the community, and these owners will tend to use tiles to increase the brightness of the whole house wall and floor when decorating. 3.There is also a situation where the living room wall tiles are used for decoration, such as the use of tiles for the TV background wall, through the shape and pattern of the wall tiles to play a decorative effect, so that the decoration effect of the new house is more beautiful.

    Now the tile modeling wall in the living room is, a very common decoration method, but also a very brilliant decoration method, especially now popular modern black gray effect and simple European style decoration, very inclined to this decoration method. Hope it helps.

    Question: Is it okay to tile the walls of the wine cellar?

  13. Anonymous users2024-01-31

    It is best not to use iron tiles on the damp wall, because the damp wall tiles are not easy to dry, and it is not easy to go on the wall.

  14. Anonymous users2024-01-30

    It is better to lay tiles in a dry situation.

  15. Anonymous users2024-01-29

    In winter, tiling can dry for 7 daysIn winter, the temperature is relatively low, the walls generally take 2-3 days, and the floor tiles.

    It usually takes a week. If the renovation is done after 24 hours, you can walk with wooden planks covering the surface, but you can't stack it with heavy objects, and in winter it is best to wait 5-7 days before carrying out other decoration projects.

    Regardless of whether it is wall tiles or floor tiles, move them from outside to indoors for 24 hours, wait for the temperature of the material to rise, and then adjust to room temperature before packaging so that the hollow object will not fall after construction.

    Precautions for tiling:

    1. Before pasting tiles, first of all, the size of the sampling inspection, to see whether the grade and color difference and the purchased sample is consistent with the confirmation of the correct before continuing the construction, if you find that there is a different or wrong color, you must immediately notify the merchant to replace in time.

    2. Before paving the tiles on the ground, the ground should be wet with water in advance, and then the tiles should be soaked in water for 24 hours, and the water should be drained before use, so that the tiles can be filled with water, so that the water in the mortar will not be absorbed and cause hollowing.

    situation.

  16. Anonymous users2024-01-28

    Actually, it didn't have much of an impact, because it was better to lay tiles in the summer, and it was better to paste them.

  17. Anonymous users2024-01-27

    Ceramic tile is the most common decorative material, paving ceramic tile seems to be a very simple construction, in fact, it is very particular about the standardization of paving tiles, so as to ensure the aesthetics and flatness of the tiles, and the home will also appear more comfortable and beautiful. Many friends who have no decoration experience want to know how many days can they bury the tiles in winter? How many days can you get on the floor tiles after laying them in winter?

    Let's answer the question for you.

    How many days can tiles dry in winter?

    The time for the tiles to dry is about 7 days, and it also depends on the temperature of the room and the construction skills of the master. After laying the tiles in winter, you need to do the corresponding protection work, do not walk on the tiles for a short time, so as not to fall off the tiles, and after a day, you need to check whether the tiles are hollow, so as to deal with them in time.

    Due to the relatively low temperature in winter, when the decoration workers are pasting tiles, the cement under the tiles is relatively slow, so it takes at least a week or so for the floor tiles to be completely dry. In order to speed up the drying speed of tile cement, we can choose to apply tiles on the days when the temperature is relatively high, and it is best not to choose the weather when it is snowing or raining. Or you can turn on the air conditioner in your home, if you don't have an air conditioner installed in your home, you can also put a heater next to the tiles, or cover an electric blanket directly on top of the tiles, so that the tiles can dry faster.

    How many days can you get on the floor tiles after laying them in winter?

    Under normal circumstances, you can walk around the floor tiles after 48 hours of pasting, but at this time you can't have too intense movements, you can only walk "gently", and you can't step on the joints of the floor tiles. After 96 hours, the strength of the cement has reached a certain level, and it is safe to walk around on it.

    If it is in the summer when the indoor air circulation is better and the temperature is relatively high, then people can step on it for about two days after laying the floor tiles, but they can only step on it, and they must not put very heavy objects on it. However, if it is in winter or other seasons, due to the relatively low indoor temperature, the cement mortar is not easy to dry, so it is at least a week or so before you can step on it.

    Generally speaking, the winter tile drying time is about 7 days, which mainly depends on the weather and temperature. If it is summer, the cement solidifies and dries relatively quickly, about two days, the tiles can be dried, and people can step on them, but you still need to wait a week to walk around and construct on the tiles at will.

Related questions
8 answers2024-07-14

1.In the process of tile laying design, first of all, we must choose a better tile glue, and the position of the wall joints must be effectively fitted, so as to ensure the waterproof effect of the wall and ensure that there will be no subsequent discoloration. >>>More

9 answers2024-07-14

Use tile adhesive.

Yes, but it is not recommended to do so in actual construction, because the surface of the tile is very smooth, and it is not easy to stick it firmly when the tile is pasted; In addition, whether the original tile is firmly attached remains to be investigated, and then the tile will increase the load of the original tile adhesive layer, increase the gravity of the brick and the possibility of occurrence. When we pave tiles, we should hang wires on the wall and ground to confirm the height of the tile paste, so we are less likely to have uneven tiles when paving tiles. When laying tiles, pay attention to leveling with a ruler, if there are raised tiles, you can use a rubber hammer to knock on the surface of the tiles. >>>More

6 answers2024-07-14

In winter, you can't stick exterior wall tiles, which are easy to fall off. >>>More

6 answers2024-07-14

If the balcony is used as a leisure balcony, it is not used to dry clothes, and it can be discarded without tiles; >>>More

14 answers2024-07-14

Shovel it down. Take a shovel and slowly shovel off the white ash from the wall.