In the case of interior decoration, the water and electricity changes in front are completed, the toilet is made of waterproof materials three times, and the following procedures are pasted with wall tiles and floor tiles. Because the interior decoration involves a lot of decoration design, there are some raw materials customized production and processing must be carried out separately, must be balanced, the floor tiles are not paved, and the interior decoration behind cannot be carried out, and it is in a termination situation. Some of the production and processing of customized furniture include soft furnishings, and only when the floor tiles are paved can the later procedures be carried out.
There are many steps that must be carried out separately, the floor tiles are not paved, there is no way to measure the ruler, due to the unclear brick under the foundation cushion, the thin thickness of the paving floor tiles, the soft decoration design is generally not given to the embedded specifications, the embedded specifications are high or low are product quality problems, only after the floor tiles are paved, the soft decoration design manufacturers can come to the door to serve the amount of size, the production and processing system to achieve the door-to-door service assembly, faster must be more than five weeks long, the interior decoration is all the first to pave the floor tiles, so as to prevent the delay of the construction period.
There are pipelines such as hydropower project pipelines and household fresh air systems on the ground to avoid damage to the pipelines in the construction and use of the project, so the tiles are pasted first. The benefits of first tiling can also be the main material of the wooden production class can be accurately measured in advance, submit the order, because the size of the ceiling can basically be ordered, the specifications of the pavement can only be determined after the tiling is completed, which can improve the construction time of the project, and the customized specifications are more accurate. There is no doubt that the floor tiles should be pasted first, because the ground and walls need to be embedded in the ground and walls, cables, water pipes, and wall grooves, resulting in impurities and dust.
After the pipeline is stabilized, the grooved area is smoothed with cement slurry, and the pipe is covered. When cutting floor tiles, there is a lot of dust, if the wall is painted first, the dust caused will be stained on the painted wall, which is not easy to remove the ash, and endangers the appearance and generosity. Everyone must pay attention to one problem, that is, the maintenance of the floor tiles after they have been laid.
I would like to propose that you put hard maintenance on the tiles that have been paved. For example, a protective film is applied to the floor tiles, followed by a layer of plasterboard ceilings or blockboards. This type of maintenance is the safest and most reliable.
-
You should stick the floor tiles first, if you make a mistake, it will affect the quality of your decoration, and there will be many shortcomings, which will affect the paving of tiles.
-
Be sure to pave the floor first. If you do it the other way around, you may not be able to control the height of the wall, and there may be some gaps.
-
Paint the wall first. If you get it wrong, the floor tiles will be covered in paint, which will be very messy.
When decorating your home, you can first paste the floor tiles, and then lay a mat on the floor tiles to paint the wall.
Nowadays, it is common to lay wall tiles first, starting from the middle, and reserving the height of a brick in the lower part. >>>More
When renovating a new house, we generally give priority to the tiles and then paint the walls. This order is based on several reasons. >>>More
Interior wall paint tends to drip onto the floor. The wall paint is applied with a roller, and in the process, the liquid wall paint may drip onto the floor. Even if the floor is well protected, there is a high chance of soiling, especially in the crevices, where it is difficult to clean after being contaminated. >>>More
When it comes to interior decoration, the usual sequence is to lay the floor or tile first, and then paint the walls. This sequence is mainly to consider the convenience of construction and the guarantee of the overall effect. If the wall is painted first, the construction of the floor or tile may cause pollution or damage to the wall before the wall paint film is dry. >>>More