Do you stick wall tiles or floor tiles first for home decoration?

Updated on home 2024-07-16
9 answers
  1. Anonymous users2024-02-12

    Nowadays, it is common to lay wall tiles first, starting from the middle, and reserving the height of a brick in the lower part.

    In the past, the workers and masters laid the floor tiles first, but the floor tiles were laid first, and you were idle for at least a period of time after the floor tiles were laid.

    In fact, you can paste wall tiles or floor tiles first, which one is the first construction, the key is to pay attention to two problems.

    First, whether it is conducive to the protection of the project in the early stage of construction.

    Second: whether it is conducive to a reasonable installation and construction progress; If this question is all positive, then there is no problem whether the wall tiles are constructed first or the floor tiles are constructed first.

  2. Anonymous users2024-02-11

    In the past few years, the general worker master is the first to lay the floor tiles, but first paved the floor tiles, at least after the floor tiles are paved, at least for a period of time you are idle, the bricks can not be stepped on, you can not ask the workers to pave the wall tiles, if it is not dry and solid, the floor tiles are uneven. And if you stick the floor tiles first, there will be cement and sand falling on the floor tiles when the wall tiles are pasted, and the hardness of the sand is large, and the surface of the floor tiles will be scratched during construction; In addition, it is not easy to do hygiene; After the floor tiles are applied, the floor drain is opened. The cement slurry flow is easy to enter the floor drain.

    Cement is soaked in water can also solidify, plugging the pipeline is troublesome, now it is generally the first to pave the wall bricks (kitchen and bathroom), from the middle of the paving, the lower part of the reserve of a brick height, but when paving, the brick should be placed on top of the top, to prevent the brick above from sliding down, and wait until the brick is completely sticky, you can remove it.

    Some people are afraid that the wall tiles will be paved first, and the gap between the wall and the floor tiles will be errored, which will not be right, which will affect the appearance. The gap between the wall and floor tiles is on the top, this problem is not big, the workers will do pre-paving before paving, if you can also find it after paving, leave a few on the edge, which does not affect the appearance. The general ones are in the corner, and they are not obvious.

    1. Measure a horizontal line at any elevation around the wall before you can start to paste the wall tiles, but you have to control the order of the bricks, so as not to cause more times of cutting bricks. It can improve the efficacy without hindering the aesthetics.

    2. After pasting the wall tiles, Jinsheng floor tiles are paved, the drainage slope is controlled, the sanitary napkin is not backflowed (flowing in the direction of the door) and the waterproof protection is not, and the water is turned off after the paste is carried out to ensure that there is no leakage.

    3. Cleaning, steel wool balls can be used for wall cleaning.

  3. Anonymous users2024-02-10

    Hello, there is no clear provision for this problem, the first paving and then paving wall tiles can be, the advantage of paving the floor tiles first is that the joints of the wall tiles are on the wall, the aesthetics is relatively good, the disadvantage is that the floor tiles are paved first, and the wall tiles can only be pasted after the tiles are dry, which increases the construction time, and secondly, if the floor tiles are paved first, it is easy to scratch the finished floor tiles when building the wall tiles, and the finished product needs to be protected. Generally speaking, there are more advantages of sticking wall tiles first, which can reduce the difficulty of construction, reduce the hollowing of the lower wall tiles, shorten the construction period, and there is no obvious difference after completion.

    Hope the above can help you.

  4. Anonymous users2024-02-09

    Generally, the wall tiles are pasted first, but if the wall tiles and floor tiles are to be jointed, the floor tiles must be pasted first before the joints can be matched.

  5. Anonymous users2024-02-08

    All belong to the masonry process, depending on the master and the process. Personally, it is recommended to paste the wall tiles first, otherwise paste the floor tiles first, and get a protective film, for fear that the wall tiles will leak to the floor tiles when they are pasted. It's troublesome.

  6. Anonymous users2024-02-07

    Interior decoration, kitchen and bathroom walls and floors are tiled.

    The normal sequence is to do the waterproofing of the wall first, after the waterproofing of the wall, the wall is mortared and haired, and then the wall tiles above the wall are paved, and a height of a brick is left under the entire wall, which is left to the last paving. Then do the entire ground waterproofing, including the reserved row of places on the wall, and then do the secondary wall corner waterproofing. Then start to pave the floor tiles, and finally pave the row of wall tiles left on the wall.

    The advantage of this is that the first wall tile presses the floor tile, and the ground will generally be properly sloped, and the lowest place is in the place where the floor drains and drains. In this way, there is water on the wall and can be left directly in the lowest part of the ground along the wall, and the water will not accumulate for a long time in the gap at the corner, and the corner brick joint will become moldy after a long time. Secondly, there is another advantage, if the ground is waterproofed first, it is easy to destroy the waterproof of the ground when paving the wall.

    Therefore, the last row of bricks in the corner is generally left for the last paving.

  7. Anonymous users2024-02-06

    In fact, you can paste wall tiles or floor tiles first, which one is the first construction, the key is to pay attention to two issues: one is whether it is conducive to the protection of the project in the early stage of construction; Second: whether it is conducive to a reasonable installation and construction progress; If this question is all positive, then there is no problem whether the wall tiles are constructed first or the floor tiles are constructed first.

  8. Anonymous users2024-02-05

    Interior decoration, if you don't ask for it, the general master will first paste the wall tiles and then the floor tiles, but in this way, the water will enter the ground from the gap between the floor tiles and the wall tiles, and it is easy to penetrate downstairs! Therefore, you must talk to the master about the wall tiles and the floor tiles, so that the water on the wall flows to the floor tiles and will not penetrate below.

  9. Anonymous users2024-02-04

    The decoration is to paste the wall tiles first, and then the floor tiles.

    In this way, the decoration can avoid delaying the construction period. If the floor tiles are paved first and then the wall tiles are laid, try to wait for the tiles to be completely dry before the wall tiles can be laid, if the floor tiles have not been completely dried, the wall tiles will be laid at this time, and the behavior of stepping on the floor may make the floor tiles uneven and even fall off. Moreover, when the wall tiles are pasted in the later stage, it is inevitable that cement and sand will fall on the floor tiles, damaging the surface of the floor tiles and making it difficult to clean.

    Laying tiles is not a trivial matter, because some people think that they can pave and can lay them themselves for a fee, but it leads to various problems in the future. Paving tiles must be paved by professional construction personnel, because they have professional paving in time, not only paving beautiful, but also can save paving time.

    Precautions when tiling and plaving:

    1. Before laying the tiles, soak them in water for a period of time, and the purpose of soaking the tiles in water is to let some small gaps in the tiles absorb water, so as to avoid hollowing or falling off in the later stage.

    2. If you don't soak the tile in water, directly spread it on the wall, the tile will absorb the moisture in the cement, and after a long time, it will lead to problems such as the tile opening and cracking, warping, etc., not only wasting the tile, but also the aesthetics of the entire wall is also very poor.

    3. When laying tiles, we must first determine the position of the first tile, because the position of the first tile directly determines the aesthetics of the entire wall in the later stage, so only the position of the first brick is determined, and the tiles behind it are easy to pave, and there will be no skew.

Related questions
24 answers2024-07-16

When decorating your home, you can first paste the floor tiles, and then lay a mat on the floor tiles to paint the wall.

23 answers2024-07-16

The general practice of the decoration company or the construction party is to lay the wall tiles first, then pave the floor tiles, and pave the floor tiles after the wall tiles are paved, which will not affect the wall tiles and do not delay the construction period, so the general construction party will adopt this approach. If the floor tiles are paved first, and then the wall tiles are paved, you must wait for the tiles to dry and solidify and then pave the wall tiles, if the floor tiles are not completely dry, you will directly pave the wall tiles, step on the floor tiles, which will artificially cause the hollowing, loosening and height inequality of the tiles!

15 answers2024-07-16

When renovating a new house, we generally give priority to the tiles and then paint the walls. This order is based on several reasons. >>>More

19 answers2024-07-16

During the renovation process, in general, we will install the cabinets first, and then put on the wall coverings. The main reason for this is that after the cabinet is installed, it may cause some damage to the wall, and if the wall cloth is pasted first, the wall cloth may be damaged in the process of installing the cabinet, resulting in unnecessary waste. In addition, after the cabinet is installed, the area of the wall will be reduced, so that the number of wall coverings required can be calculated more accurately when applying the wall covering, and waste can be avoided. >>>More

19 answers2024-07-16

When it comes to interior decoration, we generally do the laying of floor tiles before installing sliding doors. There are several reasons for this order. >>>More