What are some of the strange requirements you have encountered in the construction industry?

Updated on society 2024-07-25
18 answers
  1. Anonymous users2024-02-13

    Party A requires Party B to issue invoices to its own company to deduct taxes. If the company withholds the tax but does not pay it to Party B, Company B knocks out the tooth and swallows it by itself, and it has to pay the tax in advance. There are really a lot of such strange construction industry Party A.

  2. Anonymous users2024-02-12

    In the construction industry, I encountered a strange request from Party A to make his house not smell at all.

  3. Anonymous users2024-02-11

    It's quite unreasonable, and then it's embarrassing for the other party and yourself, and sometimes you can't make a very suitable conclusion.

  4. Anonymous users2024-02-10

    It's just that some plans are really vexatious, but you have no choice but to do that.

  5. Anonymous users2024-02-09

    I think it seems to be very unreasonable, but it has to be executed.

  6. Anonymous users2024-02-08

    I don't want to spend money and be vexatious.

  7. Anonymous users2024-02-07

    If you encounter a strange request in the construction industry, you will pay first, and then treat it.

  8. Anonymous users2024-02-06

    Party A disregards all the technical requirements, stubbornly according to its own ideas, must be designed according to his requirements to draw drawings, design fees can be more. The design institute directly denies the contract!

  9. Anonymous users2024-02-05

    Obviously a very large house with plenty of space, but he changed the bedroom to a very small one.

  10. Anonymous users2024-02-04

    When the project is settled, it is required that it cannot be settled according to the list in the bidding documents, and it is settled according to the fixed amount!

  11. Anonymous users2024-02-03

    Add people, machinery, and materials, but don't add money.

  12. Anonymous users2024-02-02

    According to the plan, the 26-layer structure of the design drawing has been capped, and Party A requires another 8 layers to be built on it, hehe.

  13. Anonymous users2024-02-01

    The money was in place and all the requirements were solved perfectly. All questions are not problems.

  14. Anonymous users2024-01-31

    1. Supervise the construction progress, quality, safety and civilized construction, and report to the company regularly in the form of monthly reports.

    2. Supervise the implementation of the general contract and report to the company.

    3. Supervise and report the implementation of the supervision contract to the company.

    4. On behalf of Party A, solve the problem of the general contractor and Party A's independent subcontractor.

    5. On behalf of Party A, we will be stationed on site to solve the surrounding relationships, such as quality inspection stations, security inspection stations, police stations and other first-class departments.

    6. On behalf of Party A, solve the problem of on-site technical drawings and on-site visa.

    7. On behalf of Party A, please invite relevant personnel from quality inspection, security inspection, archives, ant prevention office, civil air defense office, and design institute to the construction site for the first disclosure meeting.

    Building construction refers to the production activities in the implementation stage of engineering construction, the construction process of various buildings, and it can also be said to be the process of turning various lines on the design drawings into physical objects at designated locations. It includes foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction, etc. The place where the construction work is carried out is called the "construction site" or "construction site", also called the construction site.

  15. Anonymous users2024-01-30

    The construction unit is not Party A. The construction unit, the owner, and Party A are generally different titles of the project owner. When Party A is a real estate developer, the construction unit and Party A are both real estate developers, and the person who buys the house is the owner.

    The construction unit is relative to the construction (construction) unit. The owner is the relative supervision unit, the construction unit, and other regulatory agencies. Party A is relative to Party B, and the owner is Party A in the contract, so Party A is often referred to.

    Party A generally refers to the party that proposes the goal, and in the process of contract drafting, it mainly proposes what list of goods to be achieved, and is the leading party of the contract. Moreover, Party A is generally the investor, that is, the main body of operation.

    Article 15 of the Construction Law of the People's Republic of China The contracting unit and the contractor of the construction project shall enter into a written contract in accordance with the law to clarify the rights and obligations of both parties. The contract-issuing unit and the contracting unit shall fully perform the obligations agreed in the contract. Those who do not perform their obligations in accordance with the agreement shall bear liability for breach of contract in accordance with law.

    Article 15 of the Construction Law of the People's Republic of China The contracting unit and the contractor of the construction project shall enter into a written contract in accordance with the law to clarify the rights and obligations of both parties. The contract-issuing unit and the contracting unit shall fully perform the obligations agreed in the contract. Those who fail to perform their obligations in accordance with the contract shall bear liability for breach of contract in accordance with law.

  16. Anonymous users2024-01-29

    As a generation, if you are stationed on the construction site, it is recommended to focus on the big picture, 1. First of all, pay attention to the preparation, approval, and process implementation of the special safety plan for major hazards (especially this one).

    2. The second is the progress of the project, and when the progress of the project is poor, it is necessary to understand the actual situation and solve the problem with the construction unit (the progress is the most important problem for Party A).

    3. Actively contact the design unit and relevant local departments to help solve the deficiencies in the project and design 4. Supervise the quality and supervision of the project by the way.

  17. Anonymous users2024-01-28

    The construction environment must be cleaned, the roads are clean, and the materials are neat, including the cleaning of the construction area. The safety atmosphere should be good, such as helmets, hat belts, safety belts, etc. Prepare reporting materials, including construction plan, labor arrangement, quality assurance, construction period guarantee, etc.

  18. Anonymous users2024-01-27

    Party A and Party B are generally for specific contracts. The contract issuing party is Party A, and the contracting party is Party B.

    For the general contract, Party A is the owner, or the developer; Party B is the general contractor and construction unit.

    For the first contract, then Party A is the construction unit, and Party B is the first business (including labor services).

    For subcontracts, Party A is the general contractor, and Party B is the subcontractor.

Related questions
22 answers2024-07-25

There are no god-like people, they are all forced to make a living, and if there is a good job, I believe that few people are willing to suffer on the construction site. The heart of a 90-year-old single construction site dog!

13 answers2024-07-25

Colleagues dinner, everyone eats and drinks together when the game is played, play the truth, lose to say some leaders, or colleagues shortcomings and deficiencies, others are picking good to say, to my leader said don't worry, today there is no leader, everyone is a friend, I have something bad to say directly, I will work hard to correct. As a result, I believed it and told the truth to the stupid people.

16 answers2024-07-25

I've had a lot of malicious jokes, such as on Teacher's Day, my students gave me a drink, but when I opened it, I found that it had already been opened and I had already taken a sip.

20 answers2024-07-25

The binary of 12 is 1100 and the ternary is 110; The binary of 13 is 1101 and the ternary is 111; The binary of 14 is 1110 and the ternary is 112. This group is funny, the first two are the same (11), and the second is just two or three (00 01 10vs0 1 2).

19 answers2024-07-25

My first boyfriend is very literate, and he always inadvertently fluctuates his heartstrings through an article, and he feels that such a boy is particularly attractive, and he can't resist it.