Can I lay a layer of cement on the bathroom floor tiles and then do waterproofing? What will be the effect? It is important to do waterproofing when you keep it at home.
If it is not waterproof, the probability of water leakage will increase in the future. What is the waterproofing order of the house? If the bathroom floor is not waterproof, the downstairs neighbor's house will leak, affecting the neighborhood relationship, what is the waterproof method of the bathroom floor?
What are the steps to waterproofing the house? What is the waterproofing method for the toilet floor?
Home improvement waterproofing steps.
Waterproofing must be carried out after leveling the ground with cement mortar. This prevents the waterproofing coating from leaking due to uneven thickness. Before waterproofing, be sure to clean the floor and apply it 2 or 3 times with polyurethane waterproof paint.
If that doesn't work, brush it a few times.
The joints between the walls and the ground and the pipes between the water and the water are prone to problems, and workers must be urged to deal with the corners of these sides, and the waterproof paint must be applied to the location. The decoration team requires the kitchen and bathroom sewer pipes to be made of cement protective roots, 10 20 cm from the ground polyurethane waterproof coating, from the ground to redo polyurethane waterproofing, plus the original waterproof layer, constitute a composite waterproof layer, enhance waterproofness.
If there is no waterproof layer, the wall next to it and the top corner wall are prone to moisture and mold. Therefore, be sure to do a good job of waterproofing the wall before laying the wall and floor tiles. The general waterproofing treatment requires the wall to be waterproofed 30 cm high, but the non-light-bearing body wall must waterproof the entire wall, at least to a meter high.
The waterproofing of the wall adjacent to the shower position should also be maintained at a height of one meter, and the height of the waterproofing paint on the wall adjacent to the bath should also be taken into account when using the bath.
Toilet floor waterproofing method.
1. It is easy to operate, and can be used only by stirring on site.
2 .It can be applied on a wet foundation surface (but there should be no standing water).
3. It can withstand high hydrostatic pressure, and can be effectively waterproof on both water surface and negative water surface.
4. It has a certain toughness, which can cover small cracks and prevent slight vibration.
5. Good abrasion resistance, good adhesion, plastering and smoothing directly on the waterproof layer after drying, and various finishing tiles can be pasted with suitable bricks.
Home improvement waterproofing steps As mentioned above, when doing waterproofing on home decoration, the construction steps of the master are basically the same, and the specific situation varies depending on the material. There are many waterproof methods for toilets, and it is recommended to choose a good method during construction to ensure the final effect of waterproofing the bathroom.
-
Absolutely. In this way, waterproofing can make the waterproof effect better, and it can also reduce some troubles in the later stage, which is more convenient and more professional.
-
It is also possible, which can prevent water penetration, and can also play a good waterproof effect to protect the level of the bathroom.
-
No, it won't work, and it will still leak after doing so.
-
No, because cement is very absorbent, so if you lay cement and tiles, the bathroom will be more humid. The end result will only be that there will always be water on the floor of the bathroom, which will cause people to get sick.
-
As we all know, tiling must be rubbed on the reverse side of the wall tile with cement mortar, cement mortar with moistureThe effect of waterproofing is to avoid the infiltration of water, so that waterproofing and tiling have established a contradictory relationship, if the moisture of cement mortar can not penetrate into the wall, the cement mortar dries slowly, and it is not easy to fix when tiling, which will affect the operation.
Another is that the cement mortar can not solidify quickly and will cause delamination, even if the tile is pasted, it will fall off after a long time. Therefore, the waterproof wall should have an impact on tiling. Do waterproofing is not only done once to survive, generally waterproof must be 2-3 times, and the order of waterproofing is also required, not to say that the waterproofing of the wall and floor are done together, but to do the wall waterproof wall tiles first, and then do the pavement waterproof paving floor tiles after the wall is done.
If the wall and pavement are waterproofed at one time, when the wall tiles are pasted, stepping on the pavement will destroy the waterproof layer, and then the waterproofing work will be equivalent to doing it in vain. After the wall waterproofing is done, there is no need to make a protective layer. However, there are two key points, one is that it cannot be used as a soft waterproof layer, such as polymer material waterproof architectural coatings, waterproof membranes, or flexible K11.
Second, the engineering construction preparation of waterproof raw materials should be appropriate, especially K11, and no less granular materials can be added.
It is proposed that the waterproof cement mortar should be used for wall waterproofing, and the ground leveling and waterproofing are two-in-one, but if the thickness is needed, at least 1cm thick. After the pavement waterproofing is done, it is necessary to make a protective layer. Interior decoration such as tiles in the back, employees trample on it more often, and it is very easy to destroy the waterproof raw materials.
There is often a situation that the water is not leaked when the water is tested, and the bricks are leaked when they are pasted. After the waterproofing is done, it is best to make a layer of cement mortar protective layer to avoid destroying the waterproof layer when the wall tiles are pasted. The waterproofing of the wall of the toilet is generally guaranteed to be more than one meter away from the road surface in the room.
It is very difficult to solve the problem of sticking to the wall tiles, and if the floor tiles are not good, the wall will be hollow and burst.
-
Waterproofing must be done with bricks. Using cement as the protective layer of wall waterproofing material is the most basic and affordable method, which can directly mix cement with water into a paste and then brush it on the wall, or you can use cement mortar to smear a thin layer. Because the waterproof wall will reduce the adhesion of the adhesive material, it will affect the firm quality of the tile, so that the pasted tile will have a series of quality problems.
-
A layer of cement protection should be added to the bricks, so that the waterproofing effect of the bathroom can be better.
-
If the bathroom is waterproof, then you can directly complete the waterproof tiles, and you don't need to use cement for protection.
-
After the bathroom is waterproofed, it is necessary to make a layer of cement protection layer in the original waterproof layer and then paste tiles, because the installation and usability will be stronger, and it can also ensure that the bathroom will not leak, dry and wet separation, not easy to get wet, and the practicality is relatively strong.
-
Hello dear! I'm here to answer your questions, and I'm glad you asked! Is it okay to do the waterproofing of the wall after the bathroom floor tiles are paved? The bathroom tiles have been paved and cannot be waterproofed.
The waterproof coating is done before pasting the tiles, and the first process of bathroom decoration is to make waterproof coating. There are many kinds of materials used in home decoration, including ceramic tiles, auxiliary materials for pasting tiles, and waterproof coatings. The first process of new house decoration is the bathroom, bathroom decoration, first of all, change water and electricity, water and electricity are installed in the location designated by the owner.
After the water and electricity are installed, the wall can be leveled. The bathroom is made of waterproof coating, which has high requirements for the flatness of the wall, and the wall is smooth and smooth, and it can be directly waterproofed. The wall is partially rough and uneven, or there are cracks to do waterproof coating The effect is not ideal, the wall needs to be leveled, the leveling mortar does not need to be wiped too thick, and the wall can be evenly leveled.
The wall surface is smooth and smooth, which lays a good foundation for waterproof coatings. Usually, the bathroom needs to be waterproofed three times, and the first waterproof paint is dry before the second waterproofing can be done. After the waterproof coating of the bathroom is done three times, you can paste the wall tiles and pave the floor tiles.
The bathroom is waterproof, all before the tile is pasted, and the tile cannot be pasted without waterproof coating. Everyone is very aware of the brightness of the tile, and with three layers of waterproof paint on it, the luster of the tile is gone. What you see on the tiles is waterproof paint, and you can't see the color of the tiles.
Decorate the bathroom to do waterproofing, never heard of waterproof paint made on the tile. Before renovating, it is important to learn and understand some aspects of decoration. The bathroom is basically pasted with light-colored tiles, because the bathroom has fewer windows, and some bathrooms do not have small windows.
The bathroom basically chooses beige, or white pattern tiles are more, the bathroom has small windows, you can choose warm color tiles, such as pale pink tiles with patterns, after all, the bathroom is the most frequent place to use every day, warm pattern tiles will feel very warm. Such a beautiful tile is made of three layers of waterproofing, and the whole bathroom is dark gray. Because the walls also need to be waterproofed, the tiles are not visible in the bathroom.
It is important to do waterproofing in the order of the process. The bathroom is waterproofed three times before pasting the tiles, and after the tiles are pasted, it is not possible to do waterproof coatings.
This practice is too tricky, the bathroom is the place where water is used most frequently, the focus of this area should be waterproof, dry paving can not meet the requirements at all.
If you want to separate a bathroom with a shower in the bedroom, but you don't want to tear down the wall and dig a hole, how to solve the drainage problem? >>>More
Now in the decoration, the vitrified bricks are often put on the wall, and the standard construction process of vitrified bricks or full-body bricks on the wall is thin paste. In fact, it is really not recommended to put floor tiles on the wall, in the actual construction process, if there is non-standard construction, it is also a very troublesome thing to deal with thin stickers. Once the vitrified brick is puffed up on the wall, the gain outweighs the loss! >>>More
Generally use different, because of the floor tiles of the bathroom. >>>More
a. Rust removal method: Rust can be washed with 2 oxalic acid solution, and then wiped with water. After grinding 3-4 vitamin C tablets into powder, sprinkle them on the surface of the floor tiles, and then scrub them with water several times to remove rust stains. >>>More