-
Construction workers are an indispensable position for construction units, and their market prospects are also optimistic. So, what about the consumption of construction wages? How much can I spend a month?
How much do construction workers pay? The average salary of construction workers in Beijing: 6200 yuan per month, and the average salary of construction workers in Guangzhou:
5,700 yuan per month, average salary of construction workers in Chongqing: 5,600 yuan per month, average wage of Jining construction: 4,800 yuan per month, average wage of construction in Wuhan:
4400 yuan per month, the average salary of construction personnel in Shanghai: 6700 yuan per month, the average salary of construction workers in Chengdu: 5000 yuan per month, and the average salary of construction in Changsha
5420 Yuan, construction workers are divided into electrical construction workers, civil construction workers and municipal workers. The average salary is 5,700 yuan per month. The income of a construction worker is usually made up of three parts:
Salary + subsidy (travel expenses) + bonus. The base salary has been introduced to you, which is different for each unit. Some units have more than a hundred per day, and it is 3000
There is also a bonus, and a good project bonus is not a one-time dream.
What factors are associated with high levels of consumption? Generally, construction workers who are new to the industry must be paid a lower salary. After the accumulation of certain work experience, the salary will also increase.
After all, graduates, abilities and experience are constantly washing, and salaries will be lower. After two or three years of work, the salary is still good. But this also does not satisfy their own efforts and abilities.
Different regions, different levels of consumption, and different salaries. In the coastal and economic development areas, the level of consumption is high, and wages are of course very high; Payroll is also spread in the city in economically backward cities. Many people have just graduated and always think of a big career, but the day slowly repeats itself and loses its drive.
Since you get into this, you have to do well. Usually take advantage of the work, test some architect and other certifications, improve your professional skills, and add chips for yourself, and this time you want to do more!
The wages of construction workers are generally construction workers as the five members of construction, which plays an important role in the construction process. From the bidding of the project, the construction personnel need to be actively involved in the construction, project quality management, site safety, site data, monthly reports, budgeting, settlement and coordination. The construction worker is required to participate in the bidding phase during the project bidding**, and once the construction personnel bid will win the construction worker as one of the managers of the project, and he has a preliminary understanding of the project.
If there are errors in **, you can occupy as much as you want after the project starts. Of course, construction workers should be careful to employ some kind of bidding technique in **. If there is no balance in the provision of methods, multiple procedures, appropriate reduction of tenders, etc., regardless of the mode of solicitation, certain measures are taken due to the potential risks of construction staff, for example, the materials reported during the tendering period are subject to reasonable preferences.
According to the market situation, the main materials are appropriately proposed, the ** adjustment of auxiliary materials will not affect the bidding preferences, and the filter is properly filtered to the ** change factors of the material.
-
There is still a shortage of construction workers, after all, many college students now feel that it is very embarrassing to go to work on construction sites, and the general salary is about two or three hundred a day, and the salary is still very considerable.
-
There is no shortage of construction workers at the construction site, and the wages of the employees here are relatively high, with an average of more than 6,000 yuan, but this kind of work is not for everyone, and it is particularly hard.
-
It is very lacking. The salary can be about 7000 8000. However, this kind of work is very hard, and most people are reluctant to do it.
-
In particular, their wages can reach about six or seven thousand, and their income is still relatively high, but the work is relatively hard.
-
It is particularly lacking, and the salary is not particularly high, about 5,000 yuan, but the usual work is very tiring.
-
First of all, it depends on your own conditions, and secondly, it depends on what kind of unit. In a private unit, if your level is good, the boss trusts you and will take a lot, but then you will definitely not be able to just do technology; China Construction is generally more than three or four thousand, not counting the bonus of the project, and other construction units are not very familiar with it.
Site technician, mainly surveying and pay-off, sub-project projects.
Construction technology disclosure. Cooperate with the material clerk and project manager, do a good job in the project acceptance of the material for the record, and the drawings will be reviewed.
Preparation of construction plan, preparation of construction schedule, coordination between various types of work in construction, and guidance of construction technology.
1. Pay-off: First, after the full-time surveyor sets the main axis and the elevation control point, the technician cannot always rely on the theodolite.
It is necessary to master the basic skills of the pendant. When measuring the size of the pay-off, it is necessary to eliminate the use of small rulers and one foot (3 meters and 5 meters are commonly used on the construction site) to avoid the accumulation of errors.
2. Material plan: As a technician, you must do it yourself, you calculate the actual amount, don't look at the content of the budget quota, the quota is prepared by integrating various engineering categories, and the content in some quota items cannot be used in actual construction, and some are not enough.
3. Technical disclosure: Generally speaking, the common problem of technical disclosure is that there are many copies of books and specifications, and there are not many people who can guide the construction.
-
The salary is 6,000-10,000 yuan, and the company has different treatments.
Engineering construction personnel pay-off personnel are a kind of surveyors. They are mainly engaged in lofting and alignment in engineering construction. There are certain requirements for pay-offs, such as being able to understand drawings. Know how to stake out accurately. In particular, it is necessary to be attentive and responsible.
In fact, there are very few pay-off workers on construction sites who specialize in managing pay-offs, and few people are called pay-offs. The work of pay-off is generally done by technicians, so pay-off workers are also called "technicians" on construction sites. However, the work of a technician is not only to pay off the line, but also to understand the pay-off as half a technician.
Safety precautions.
1. Before the construction personnel enter the construction site, they must carry out the education and assessment of construction safety and fire protection knowledge, and the employees who fail to pass the assessment are prohibited from entering the construction site to participate in the construction.
2. Strictly implement the operating procedures, shall not command and operate in violation of regulations, and have the right to refuse the instructions of illegal operations and have the responsibility to stop others from operating in violation of regulations.
3. Personal protective equipment must be worn correctly during construction operations, and safety helmets must be worn when entering the construction site. It is forbidden to use fire without permission, and it is strictly forbidden to operate after drinking.
4. Personnel engaged in high-altitude work should experience it regularly. Those who suffer from high blood pressure, heart disease, anemia, epilepsy and are not suitable for high-altitude work shall not engage in high-altitude work.
5. When working at high altitudes, steel bars, and structures, be sure to wear non-slip shoes.
-
In Harbin, if you are a pay-off technician, it is 6,000---10,000 yuan a month, and if you are a pay-off management technology, it is between 12,000---15,000 yuan a month.
-
The salary of a site project technician is 8000-10000 January.
In the same way, the construction materials courseware of the construction materials of the construction of the construction of the project is not the same, the technician guides the work of the big worker, and inspects and supervises the workload of the overall project. Large workers still need some technology, and if the technology is unqualified, they will be reworked, and small workers will work physically on the full screen. The type of job is different, and the salary is different.
The labor dispatch company will calculate the project quantity in the middle of the month, and at the end of the month, the labor wages will be paid to the salary card of the workers, and the wages will be paid on a monthly basis under the real-name system.
-
It has nothing to do with the place, first of all, it depends on your own conditions, and secondly, it depends on what kind of unit.
In a private unit, if your level is good, the boss trusts you and will take a lot, but then you will definitely not be able to just do technology;
China Construction is generally more than three or four thousand, not counting the bonus of the project, and other construction units are not very familiar with it.
-
Let's look at the experience, there are three or two thousand, and tens of thousands are also common, I don't know what your situation is.
-
It depends on the specific work and project, but also depends on one's own ability and experience.
-
How much is the salary at the construction site! Hello, I am glad to answer for you<> pro-construction site wage is the daily wage of migrant workers on the construction site, the general working hours of Tiangong are about ten hours, 200-250 yuan for labor, carpentry, bricklayer, steel construction and other technical work in 300-400 yuan, if the small contracting technology is proficient, a few people are diligent and willing to endure hardships can reach 500-700 yuan per day. It needs to be said that the age of migrant workers on the construction site is generally 40-60 years old, and they are the pillars of a family.
Working on construction sites to earn money every day, without any benefits and paid vacations, people work hard for life in all walks of life, and they know their bitterness and warmth! Hope mine can help you <>
Do you have any other questions?
-
As of February 2020, it is:
DU4000 - 7000 yuan. zhi
Building construction. DAO members are grassroots technical organization and management personnel who have professional knowledge of construction and construction, have the right to go deep into the construction site, provide technical support for the construction team, and review and supervise the quality of the project.
Under the leadership of the project manager, go deep into the construction site, assist in the construction supervision, review the project quantity with the construction team, provide the specifications, models and arrival dates of the materials required on the construction site, do a good job in the acceptance visa and management of on-site materials, timely carry out the acceptance and quantity visa of the concealed project, and assist the project manager to do a good job in the data collection, storage and archiving of the project.
-
I am from Guangzhou, Guangdong, and I am happy to help you answer, and the construction is not a holiday.
Private experienced, skilled builders 4000 7000Depending on the power of the ability to get a salary. Work is an eight-hour clock, and private people often work overtime, 8 a.m
00 12:00, 2:00 p.m. 6:00
00, in general, there is no overtime. Unless the deadline is rushed.
State-owned enterprises, private enterprises, with technology and experience, can operate independently, 4000 6500 is relatively fixed, but the bonus is high. There are three insurances and one housing fund, five insurances and one housing fund.
The salary that just came out of school is not much, 8:00 12:00 in the morning, 2:00 in the afternoon and 6:00 in the afternoon, and generally does not work overtime. Unless the deadline is rushed.
It belongs to the probationary period, private secondary school is basically not accepted, 1800 probationary period (junior college), there is a relationship with different state-owned enterprises do not receive technical secondary school, 1500 2000 (junior college), there is a relationship with different private wages about 1200 (technical secondary school) 1800 2000 (junior college) hope to adopt, typing is not easy, haha.
That's my number. 294154886
-
This position is basically from dawn to everyone else has gone to sleep. The salary is higher, generally 8,000 (Shanghai). It is the consumption of youth, but the prospects are good.
-
6 o'clock - 20 o'clock, because continuous construction rarely has holidays. There is usually a one-hour break at lunch.
-
Dalian is generally 4000-5000, without insurance. I start working at dawn around 5 a.m., but not necessarily at night, so I usually live on the construction site. It seems that the holiday is only for the New Year.
-
The salary of the construction worker in Chongqing may be about 3,000 in the early stage, and 8,000-10,000 after getting started in the later stage.
-
Dalian is generally 4000-5000, without insurance.
-
If there is a supervision certificate, then the salary is relatively high, and the ability is strong, and the salary is higher.
-
The annual salary of construction workers ranges from 6.2 million yuan, and some construction workers even earn even higher annual salaries. The main reasons for the large difference in annual salary: working years Characteristics of the project (industrial, public construction, civil construction, etc.) Nature of investment Project funds** and payment of project funds The area where the project is located The nature and content of the work The ability to work and the responsibility risk of the project Management Model (such as whether to adopt the contracting model), etc.
-
Look at what position it is, generally more than a year of ordinary construction workers 5k to 6k, if the building number is long, about 9k to 1w, this thing depends on seniority and technology.
-
Constructor is a highly technical position and belongs to the management position. Don't look at the high salary, he also has a big responsibility, to undertake important tasks such as command, inspection, training and so on, if there is a problem with the project, he is directly responsible, a little higher normal!
-
The construction staff of the construction team under our unit is every month.
6000 pieces in.
Chengdu Metro.
-
To tell the truth, your documents are not valuable, don't be unhappy, useful is the two construction and one construction engineer senior engineer, as for the salary, depending on what you do, the roadbed and attachments are about 5000, the bridge can reach 8000, a tunnel is almost 10,000, it depends on the project and the boss, of course, if the salary in the state-owned enterprises will be very low, of course, it depends on your experience, it is estimated that you will graduate for about 2 years.
Construction site bai safety slogan Dadu
Full: 1. Weeds are not. >>>More
Whether it is worth marrying or not, it is not only a matter of occupation, the word construction worker can only show that he can bear hardships and stand hard work, and he also has a certain degree of education. >>>More
The work of the hydropower supervisor is to verify the original materials such as the quality inspection report of the incoming raw materials and the construction measurement results report, inspect the use of the contractor's construction materials, components and engineering equipment, and make on-site records, check and record the on-site construction procedures, construction methods, etc., and inspect and count the daily work; Verify the results of engineering measurement and verify the qualifications of personnel in key positions; Inspect and supervise the construction safety and environmental protection measures at the project site, report to the supervising engineer in a timely manner if any abnormalities are found, check the contractor's construction log and laboratory records, and verify the original situation of the contractor's quality assessment.
How can we learn the difference between the construction plan of the civil construction worker and the construction party.
If the injury is serious and the labor relationship can be determined with the unit, you should apply for work-related injury identification and labor ability appraisal as soon as possible, and then apply for labor arbitration as soon as possible according to the appraisal results to request the employer to compensate for work-related injuries, because the statute of limitations is only 1 year, and the law does not support it if the statute of limitations is exceeded. >>>More