The materials and related processes that need to be prepared for civil engineering bidding

Updated on society 2024-07-22
6 answers
  1. Anonymous users2024-02-13

    The materials required are:

    Legal person identity certificate, legal person power of attorney, unit introduction letter (authorized person), enterprise license, enterprise qualification certificate, tax registration certificate, organization ** certificate, safety production license, authorized person's ID card, project manager practice qualification certificate, project manager title certificate (there may also be safety production assessment certificate), technical person in charge of the title certificate.

    Bidding process: a bidding organization for the project should be established;

    It is necessary to apply for construction and approval of the procurement of civil engineering projects;

    After the relevant procedures, processes and formalities comply with the regulations, the purchaser selects the supervision unit, and the selected supervision unit must comply with the relevant provisions and requirements of the "Procurement Law" and the "Bidding and Bidding Law";

    Commencement of the preparation of tender documents in accordance with legal procedures. The bidding documents must be prepared by the bidding organization according to the characteristics and needs of the civil engineering project to be procured, and the supervision unit can assist;

    The tender announcement shall be publicly issued in a timely manner. After the bidding documents are reviewed by the bidding group and approved by the relevant competent departments, the bidding announcement can be publicly released to the whole society;

    "Screening" of the qualification review or other conditions of the corresponding bidder. The bidder shall, within the time specified in the tender announcement, register with the tenderer and receive the prequalification documents, the tenderer shall review the prequalification documents received within the specified time, after the prequalification, the tenderee shall promptly issue a prequalification notice to the prequalified bidder, inform the time, place and method of obtaining the bidding documents, and at the same time inform the prequalification applicant of the prequalification result;

    Start ** Tender Documents. The bidding documents are only given to bidders who have passed the prequalification. Any bidder who has not participated in the prequalification and participated in the prequalification but is not qualified shall not obtain the bidding documents;

    Organize site surveys. From the issuance of the bidding documents to the specified deadline for submitting the bidding documents, the tenderer shall, in accordance with the time specified in the bidding documents, depending on the project situation, organize all bidders to conduct on-site surveys, so that they can further understand the site conditions and environment of the project, and the questions raised by the bidders shall be sent in writing to all bidders;

    Tender documents are accepted. The tenderer and the bidding department or unit shall arrange special personnel to be responsible for the management of bidding documents;

    Establish a bid evaluation committee or bid evaluation team. The bid evaluation committee or bid evaluation team shall be established by the purchaser in accordance with law;

    Bids should be opened in a timely manner according to the specified time;

    After the end of the bidding activity, it will be transferred to the bid evaluation immediately;

    Filing should be timely. After completing the procedures and processes of bid evaluation, the bid evaluation committee or bid evaluation team shall submit a written bid evaluation report to the tenderee in a timely manner and recommend qualified bid-winning candidates;

    Issue a written notice of award. After the bid evaluation report is reviewed and approved by the procurement supervision department at the same level or the next higher level, the tenderer can issue a notice of winning the bid to the winning bidder, and at the same time notify all the bidders who have not won the bid of the winning result;

    Sign the winning contract. According to the time and place agreed in the notice of winning the bid, the two parties sign the contract agreement.

  2. Anonymous users2024-02-12

    Don't do anything if you are generally invited, you have to prepare all the information of your company, safety assessment information, project manager qualification review information, etc., ** is the calibration or the cost of your own company, what is the region, you will pay attention to the requirements of the region to prepare for the east, you can add me QQ private chat, which is not clear.

  3. Anonymous users2024-02-11

    The bidding conditions for construction projects include the following: (1) the tenderer has been established in accordance with the law; (2) If the preliminary design and budget estimate shall be subject to examination and approval procedures, it has been approved; (C) the scope of the bidding, the bidding method and the form of the bidding organization should be carried out in the form of examination and approval, has been approved; (4) The corresponding funds or funds** have been secured; (5) There are design drawings and technical information required for bidding.

    Article 8 of the Measures for Bidding and Bidding for the Construction of Failed Projects in Engineering Construction.

  4. Anonymous users2024-02-10

    The information required for bidding is as follows:

    1. Technical bidding;

    2. Commercial bids, including construction period guarantee commitment, bid-winning commitment, quality assurance commitment, project budget, etc.;

    3. If it is a large-scale project, then it is also necessary to prepare a credit bid. It mainly includes the company's assets and financial status in the past two years.

    It is necessary to study the bidding documents first and conduct detailed investigation and research. Review the quantity of the project, prepare the bidding documents to check the slag, and then submit the bidding documents.

    Tendering and Bidding Law of the People's Republic of China

    Article 3. The following engineering construction projects, including the survey, design, construction, supervision and procurement of important equipment and materials related to engineering construction, must be tendered within the territory of the People's Republic of China

    1) Large-scale infrastructure, public utilities and other projects related to the public interest and public safety;

    2) Projects that use all or part of state-owned funds for investment or state financing;

    3) Projects that use loans and aid funds from international organizations or foreign countries.

    The specific scope and scale standards of the projects listed in the preceding paragraph shall be formulated by the development planning department in conjunction with the relevant departments and submitted for approval. If the law or the scope of other projects that must be tendered have provisions, follow those provisions.

  5. Anonymous users2024-02-09

    1. Preliminary design approval or scheme approval (please provide planning permission if you have a planning permit); 2. Proof of funds from the opening bank (original); 3. Registration form for approval of public bidding for engineering construction (in triplicate) (Municipal Bidding Office); 4. Tender announcement (in triplicate); 5. Bidding contract (with a list of personnel) or self-bidding license; 6. If the excavation depth is more than 5 meters, the foundation pit enclosure plan needs to be provided; 7. Housing property rights certificate and lease contract are required for decoration projects; If the house property right certificate has not been obtained, the original planning permit, bid winning notice, construction permit, completion acceptance report, etc. of the project shall be provided. Planning permission is required for decoration works to alter the façade.

    Legal basis: Bidding and Bidding Law of the People's Republic of China

    Article 13 The bidding agency is established in accordance with the law, engaged in the bidding business and provides related services to the social intermediary organization Qingshen.

    The bidding agency shall meet the following conditions:

    A) there is a place of business and corresponding funds for the bidding business;

    B) the ability to prepare the bidding documents and the organization of the evaluation of the corresponding professional strength;

    Article 15 The tendering agency shall handle the bidding matters within the scope entrusted by the tenderer, and comply with the provisions of this law on the tenderer.

    Article 16 if the tenderer adopts the method of public bidding, it shall issue a tender announcement. The tender announcement of the project that must be tendered in accordance with the law shall be published through the newspapers and periodicals, information networks or other media designated by the state.

    The tender announcement shall contain the name and address of the tenderer, the nature and quantity of the bidding project, the place and time of implementation, and the method of obtaining the bidding documents.

    Article 17 if the tenderer adopts the method of inviting bidding, it shall issue an invitation to bid to more than three specific legal persons or other organizations with the ability to undertake the bidding project and good credit.

    The invitation to bid shall contain the matters specified in the second paragraph of Article 16 of this Law.

  6. Anonymous users2024-02-08

    1. To handle public bidding, you should bring information, preliminary design approval or scheme approval.

    2. Proof of funds from the opening bank.

    3. Registration form for approval of public bidding for project construction.

    4. Tender announcement.

    5. Bidding contract (with a list of personnel) or self-bidding license;

    6. If the excavation depth is more than 5 meters, the foundation pit enclosure plan needs to be provided;

    7. Housing property rights certificate and lease contract are required for decoration projects; If the house property right certificate has not been obtained, Liang Xulu shall provide the original planning permit, bid winning notice, construction permit, completion acceptance report, etc. of the project. Planning permission is required for decoration works to alter the façade. For the construction project of public bidding, if the tenderer pre-qualifies the bidding applicant, it is necessary to submit the prequalification application report and prequalification documents, and then enter the construction application procedure after approval.

    1. Format requirements for construction project bidding.

    Bidders should be informed that this volume is mainly written on the general situation of the tendering party and the bidding methods and requirements, etc., and a code of integrity should be attached at the end of this volume.

    1. Preparation conditions for bidding projects.

    2. Project content, scope, engineering quantity, construction period, geological survey unit and engineering design unit.

    3. The site, water, electricity, roads, etc. that can be used for the project

    4. Project quality level, technical requirements, special requirements for engineering materials and bidding units, and project acceptance standards

    5. Project feeding methods and main materials, project price settlement methods:

    6. Organize the bidding unit to conduct the project site survey, explain the time and place of the bidding documents

    7. Registration, bidding date, bidding documents sending method:

    8. Time and method of bid opening and evaluation, basis and notice of winning bid.

    9. Miscellaneous. Second, the bidding process of construction projects.

    1. Bidding qualifications and filing, the tenderer shall handle the bidding matters by himself, and prepare friends to discuss with the relevant departments according to the regulations; If the bidding matters are entrusted, the entrustment contract shall be signed.

    2. Determine the bidding method, and determine the public bidding or invitation to bid in accordance with laws, regulations and rules.

    3. Issuing bidding announcements or bidding invitations, and implementing public bidding for the rubber belt, should be designated by the state or local newspapers and periodicals, information networks or other media, and at the same time publish the bidding announcement on the Internet of China's engineering construction and construction industry; If the invitation to bid is implemented, an invitation to bid shall be sent to more than three bidders who meet the qualifications.

    4. Prepare and issue prequalification documents and submit prequalification applications, and if prequalification is adopted, prepare prequalification documents and issue prequalification documents to applicants participating in the bidding.

    5, pre-qualification, to determine the qualified bidding applicants, review and analysis of the content of the prequalification application submitted by the bidding applicants, if the tenderer needs to conduct a comprehensive investigation of the bidder's bidding qualification legitimacy and performance ability, can be reviewed by prequalification.

Related questions
6 answers2024-07-22

Step 1: Prepare the business license, tax registration certificate, and organization certificate of the enterprise participating in the bidding. >>>More

5 answers2024-07-22

I don't recommend that you follow the script, because even if there is a suitable one, it may not be suitable, since it is a youthful rebellion, it is recommended to direct some touching things about adolescence, which is more valuable, and the class meeting should be written according to the specific situation of your class, which is more valuable and meaningful.

6 answers2024-07-22

A lunar eclipse is a special astronomical phenomenon in which when the Moon moves to the shadow of the Earth, the area between the Moon and the Earth will be blocked by the Earth due to the sun's rays, and a piece of the Moon is now missing. >>>More

14 answers2024-07-22

Information required to apply for a trademark in Thailand: >>>More

16 answers2024-07-22

Conditions for registering a German company:

1. Shareholders who are at least 18 years old and have no nationality restrictions. >>>More