First, paving. 1. The yang angle touches the angle and does a 45-degree chamfer. There will be gaps when the chamfer is done, and you can't see it after the beautiful seam is done.
2. Most of the bathroom and kitchen tiles should be soaked in water (the all-porcelain ones do not absorb water and do not need to be soaked in water), and the floor tiles are dry paved and do not need to be soaked in water.
3. Tile paste, wall tiles need to be glued on the back.
4. Tell the master in advance that if you find that a piece has color difference or flaws in the process of paving, don't put it on the wall.
5. The wall is pressed to the ground, the tile gap is smaller, and the process requirements are higher. When laying, the bottom row of bricks on the wall is empty first, and then it is laid after the tiles are laid.
6. Find the slope, and the bathroom should be sloped for good drainage. One bathroom with two floor drains, one in the shower room and one outside. Note: The floor drain of the shower room is made in a sunken back shape.
7. Bathroom wall and floor joints. If it is difficult, you can only face the position of the open side, and the place that is blocked can not be seamed.
8. Leave a gap between the two bricks, use a cross card to leave the joint, and make a beautiful seam in the later stage.
10. The beauty sewing should be carried out after the tile is dry, preferably 3-5 days after the tiling is completed.
Second, the acceptance of funds.
1) Check the hollow drum, within 5% is considered qualified. There are a few hollow drums around, and the hollow drums in the middle of the tiles need to be replaced.
2) Acceptance flatness, the junction of four bricks, clean and tidy, 2 meters by the ruler to accept the flatness.
3) Acceptance of sewer, toilet sewer pipes and floor drains. Whether the water is unobstructed, and whether the zigzag design of the floor drain is laid.
4) Wall tiles and floor tiles are jointed, the gap between bricks is uniform, and the cross joints are vertical.
5) The yin and yang angles are 90 degrees, and whether the yang angles are in place.
6) The hot and cold water outlets of the shower are on a parallel line, and whether the size of the opening is appropriate. Smooth corners.
7) Whether there are corners, edges and porcelain on the surface of the tile.
8) Whether it is a wall pressing the ground.
9) If there is a tile acceptance, the location and direction of the tiles, etc. (The pattern of the floor tiles in our bathroom is not right, but it is not that the tiles have little impact).
10) Whether the bricks in the same space have color difference.
-
The choice of craftsmen for tiling, the choice of tiles, it is recommended to choose large brands when choosing tiles, and at the same time conform to the color and style of the overall home decoration style, the connection of places, and the beauty of the seam should be carried out after the tiles are dry.
-
Be sure to do a good job of moisture-proof work, before tiling must determine the length, width and height in advance, to choose the right brick, be sure to soak the tile in water, and then when tiling, be sure to wipe all the cement mortar clean, to use a level to correct in advance.
-
I think we need to pay attention to the details, the first problems, the use problems, the quality problems and the construction problems.
-
Before pasting tiles, you should do a good job of waterproofing, the tiles should be soaked in water first, the ground should be kept flat, the gaps around the tiles should be filled, and the distance between the tiles should be designed in advance.
-
Base surface treatment before tiling:
1. All surfaces should be solid, clean, free of hollows, oil, wax stains, release agents and other loose substances; 2. The painted surface should be rough chiseled, exposing at least 80% of the original surface; 3. After the concrete surface is completed, it should be cured for at least 28 days before laying bricks;
4. The surface of the new plastering should be cured for at least 7 days before the bricks can be laid;
5. Old concrete and plastered surfaces can be cleaned with industrial detergents or degreasers, and then rinsed with high-pressure faucets. Its surface can be paved with bricks after drying for 24 hours;
6. In the substrate with large water absorption rate or in a high temperature and dry environment, the base surface must be wetted before construction.
on tile productsInterpretation:
1. Understand the scope of application of this type of tile adhesive and what types of bricks are suitable for paving.
2. Please mix and stir tile adhesive with water according to the ratio requirements, and use an electric mixer to stir.
2. After mixing, the tile adhesive should be used up within the specified time, and the unused product should not be reused with water.
3. Use it under suitable climatic conditions to avoid construction at high temperature and low temperature.
4. Choose a special tooth scraper for tile adhesive construction, and small bricks can be scraped with small tooth marks, and large tooth marks scraper can be used instead.
5. If the gap on the back of the tile is deep or the stone and tile are large and heavy, the working surface and the back of the tile should be coated with glue at the same time.
6. Pay attention to the expansion joints for tiling, which helps to drain the air, improve the full slurry rate of tiling, and reduce hollowing and tile extrusion cracking.
7. The tile paste order should be paved from bottom to top, and the tile spacing can be adjusted according to the actual area.
-
The wall tile paste must be firm, and the hollowing rate must be within 3%. There are no defects such as skew, missing edges and cracks.
1. When the base layer is treated, all kinds of dirt on the wall should be cleaned up, and watered and moistened one day in advance. If the base layer is a new wall, when the cement mortar is dry, it should be arranged with bricks, elastic lines, and pasted surface bricks.
2. Before the formal paste, the standard point must be pasted to control the flatness of the pasting surface, and the flatness should be checked with a ruler at any time during operation.
3. Before pasting the tiles, they must be soaked in clean water for more than two hours, and the bricks should be taken out to dry for later use. When pasting, paste from bottom to top, require the mortar to be full, when the ash is lost, it must be removed and re-glued, and it is not allowed to plug the ash from the brick joints and mouths.
4. When laying and sticking, when encountering pipelines, lamp switches, and supporting parts of toilet equipment, etc., they must be cut and matched with a whole brick sleeve, and it is forbidden to use non-whole bricks to patchwork and paste. The whole or independent parts should be pasted at one time, and when it cannot be completed at one time, the stubble should be left at the construction joint or the dark corner.
Construction skills for floor tiling
1. If ceramic floor tiles are used for tiling, the ceramic floor tiles should be soaked and dried first.
2. When pasting tiles, the cement mortar should be fully smeared on the back of the ceramic floor tiles, and then compacted with a rubber after paving. At the same time, check and correct with a level to wipe the cement mortar on the surface.
3. After 2 to 3 hours after the tile is pasted, wipe the joints with white cement, and use cement mortar with cement and sand = 1:1 (volume ratio), and the joints should be filled densely, flat and smooth. Then wipe the surface with cotton silk.
-
<> "Before tiling, you must regret it, and you must communicate with the bricklayer to confirm these 10 things.
1. Communicate with the master to make begonia corners, not Yang horn strips.
2, communicate with the master before returning to the bright do not take the same color tile to cut the width of the door in the middle, this is not a real shop.
3. Tell the master in advance to do such a whirlwind floor drain, and some masters will not do it if they are troublesome when they are in the water.
4. Tell the master in advance that the kitchen check valve must be tiled, otherwise it will leak and have to be reworked in the future.
5. Tell the master in advance that the bathroom is waterproof, and it is necessary to do brushing treatment, otherwise it will be easy to fall off the bricks in the future.
6. Tell the master in advance that the slope must be done to make the alcoves, otherwise it will be easy to accumulate water in the future.
7. Tell the master in advance that the bathroom should be pressed against the wall, not on the ground.
8. Tell the master in advance whether to make a single package or a double package, a single package should be pasted to the door hole, and the double bag sleeve should not be pasted to the door hole.
9. Tell the master in advance that the bathroom bricks must be on the wall and the ground, otherwise it will be ugly if you make a little mistake.
10. Tell the master in advance that the small bricks must be laid in the place where the furniture can cover, otherwise it will be ugly.
-
<> "What details must be paid attention to before tiling?
Clause. 1. Before tiling, it is necessary to typeset in advance, so that the master can arrange the cut bricks as much as possible in the place covered by the furniture.
Clause. Second, tell the master to make this kind of real shop, not to make the same color of the door stone.
Clause. 3. Tell the master in advance to make begonia horns, and don't stick yang horn strips.
Clause. Fourth, I told the master to make this kind of back-shaped floor drain, which is faster to drain.
Clause. Fifth, communicate with the master in advance whether to stick the seam.
Sixth, after doing a good job of waterproofing, it is necessary to do brushing treatment to prevent the tiles from falling off in the later stage.
Clause. Seventh, if you make a niche, you must communicate with the master before spring in advance, and you must do the slope.
Clause. 8. Let the master press the Hui Ze resistance reverse valve, otherwise the back seal is not tight and there will be air leakage.
Clause. 9. Communicate with the master in advance whether to make a double package or a single package.
Clause. 10. When opening holes above, you must use a professional hole opener, otherwise you will jump porcelain.
Clause. Ten. First, you must leave a maintenance opening, otherwise you will smash the bricks in case of problems.
Clause. Ten. Second, tell the master to press the wall to the ground, not the ground.
-
When tiling in the home, no matter where it is, we must pay attention to waterproofing, and secondly, the water pipes on the surface of the room are everywhere, so we must wrap it well when pasting tiles, and finally the tiles must be compact and stable, which is related to the later life of a family in the room.
Now the tiles are more mature, just to say that the good and bad of the tile is the need for the homeowner to buy their own, followed by the tile itself is a technical job, no matter how you choose to find a technical experience, skilled ability of the technical worker to paste the tile is the best.
First, pay attention to waterproofing when tiling.
The most important thing is waterproofing, if the waterproofing is not good, once the family leaks, the water will flow down, not only will affect the residents downstairs but also make the whole room become very wet, and it is very difficult to make up the waterproof in the later stage, generally when pasting tiles is to go through professional testing and inspection, the process of tiling needs to be checked by the homeowner, so it is necessary to do it in the waterproof, and this is a very important problem, once it is not done, then it is very troublesome to live later. <>
2. Wrap the water pipe.
Because there are a lot of fruits in the room, so you must wash and wrap it, because only the water pipe is kept, that makes the whole room very beautiful, remember not to hide the blood vessels or wires outside the tile, which will affect the beauty of the whole room, and will have a very big impact on the life history of the family in the later period. <>
Third, the tiling should be compact and stable.
When tiling, you must check whether it is detected and stable, remember not to leave gaps, this is very important, because there must be a close connection between the tiles and the tiles, so that the whole room effect is very good, and it is also relatively compact, tiling is not in a hurry, you must be careful to paste the tiles, if you paste it well, it will make the whole room set off the warmth and beauty, and can make the whole room more beautiful and textured, if you don't paste well, it will affect the effect of the whole room. <>
-
When carrying out the construction of the base layer, it is necessary to deal with the stains on the wall in advance, and at the same time, the wall should be watered and moistened one day in advance; If the wall of the base layer is hearty, when the cement mortar is dry, you can carry out the process of arranging bricks, elastic lines, and sticking towel wall tiles; In addition, before tiling, it must be soaked in water for more than 2 hours, and the brick body is not bubbling, take it out to dry, and set aside.
-
Tile placement details, avoid the use of warped tiles, the bottom should be smooth, confirm the size of the site, need to pay attention to protect the windows, waterproof water and electricity, these pipes should also be checked in the process of handling whether they meet the requirements of paving.
-
Pay attention to cleaning, waterproofing, blocking, order, adhesion, etc., only by paying attention to these details can it be pasted more well.
-
Ceramic tile is a highly functional decoration material in the state, whether it is laid on the ground, or laid on the wall of the kitchen and bathroom, it is very practical! But the construction is more troublesome, generally need professionals to carry out the construction, if you want to do it yourself, you must understand the specific steps of construction! So what do you need to pay attention to when you paste tiles yourself, and what are the specific steps?
First of all, you should determine whether to paste tiles yourself, dry or wet paving, and secondly, you should do a good job of auxiliary lines to ensure that the construction is kept vertical, and then apply the stirred mud for paving, and you can complete the laying!
Before tiling yourself, be sure to determine whether it is dry or wet. Dry paving should use a drier cement mortar, but it is necessary to soak the bricks in advance, so that the construction will be simpler. Wet paving should add a lot of water to the cement mortar to keep the mud sticky, and the tile does not need to be soaked, it can be constructed directly, but this requires professionalism.
In general, dry paving will be better, and it is not easy to make mistakes in construction.
Paste the tiles yourself, and make auxiliary lines in advance. This helps the construction, can maintain a vertical in the process of construction, and can also refer to the auxiliary line for laying, which is very convenient to reduce the occurrence of distortion, uneven cover and other problems, which is a point to pay attention to!
After determining the paving method, you can apply the tiles yourself, first of all, stirring the mud. If it is a dry spread, you don't need to get too much water, just stir it. Then apply it to the back of the tiles that have been soaked, try to apply it evenly, stick it on the ground, and beat it with a shovel handle or a glue hammer, so that it can be glued more firmly, and it can also ensure that the mud fills the space between the tile and the ground, so that a tile is paved, as long as you continue to go down according to the front tile!
Paste tiles yourself, you must understand the specific construction steps before you can carry out construction. After all, this requires a certain amount of professional knowledge, generally as long as you determine the paving method, set up the auxiliary line can be tiled yourself!
You can get it for free
Many winter fishing enthusiasts will take a small stool to sit on the ice to fish, which is the most noteworthy is the solidity of the ice, if the ice is not strong enough, anglers can easily fall into the ice water, and winter fishing enthusiasts wear cotton clothes, if you fall into the water, the cotton clothes absorb the water, will increase their own weight, it is difficult to climb ashore, so the most noteworthy is the solidity of the ice.
Domain name, server. Among them, the server should be stable and open quickly! >>>More
You can't jump on any elevator.
Attention to vertical elevators: >>>More
Pack the things you need to bring in advance, many people pack up when they leave, and start to go out after packing, so the result is that many things are forgotten to bring, if you can buy it with money when you get to school, it's okay, but like some documents and the like may need to be couriered or go home to pick it up.
Some say that Sanya, Hainan is the most suitable for winter tourism, some say that Xishuangbanna, Yunnan is the most comfortable, and there are also said that the housing prices in Beihai, Guangzhou, are cheap and suitable for the elderly ......There are different theories, and each has its own preferences. I am a native of Xinjiang, Xinjiang winter is long and cold, as I get older and older, in recent years I have been paying attention to the domestic winter suitable places for travel, but also been to Xishuangbanna, Beihai and other places, friends come to Sanya for the winter, this year I came to Sanya for the winter, November 2 to Sanya has been three months now, after a winter, I think I have the right to speak. <> >>>More