Should the decoration company do the tile cleaning for the decoration company?

Updated on home 2024-07-13
22 answers
  1. Anonymous users2024-02-12

    If you are half a pack, it generally does not include tile seams, and then find someone to do the beauty seam and help you do it!

  2. Anonymous users2024-02-11

    Generally, the contractor only packs the basic labor, if there is no talk about the beauty of the sewing package in the early stage, then it is not included, before the decoration also has to do caulking, the beauty of the sewing is only done by specialized people, if it is caulking should be wrapped in the clear bag.

  3. Anonymous users2024-02-10

    If you need to use a special sewing agent, such as color, this should be negotiated with the decoration company in advance, and any requirements can be directly raised.

    Of course, there is no doubt that the construction must have been done by them.

  4. Anonymous users2024-02-09

    For many owners who decorate for the first time, the first problem they face in decoration is to choose the decoration method. Or do you choose all-inclusive? Let me share with you some of the advantages and disadvantages of semi-package repair and full-package repair.

    First, the advantages of all-inclusive and half-package.

    1. All-inclusive advantages: it is more time-saving, labor-saving and worry-free, and the responsibility is relatively clear and clear, and any problems in the decoration can be attributed to the construction party. The whole package is repaired in quality, and it is also more beneficial for later maintenance, which can shorten the decoration company, and the decoration effect is holistic and relatively beautiful.

    2. Half-package advantage: in the decoration design, there is a decoration company responsible for the more troublesome piece, no need to hire someone else to design, and some more fragmentary things such as auxiliary materials are purchased by the decoration company, which can save a lot of heart. The main decoration materials are bought by themselves, which is relatively more cost-effective, and the things they buy are more assured to use.

    Second, the disadvantages of all-inclusive and half-package.

    1. The disadvantages of all-inclusiveness: if the owner is not concerned about the decoration, it is easy to cut corners, if there is really no time to manage the decoration, we must choose a formal and reliable decoration company, and tighten the acceptance standards to avoid this phenomenon. If the construction period is not clear in the contract, it is easy to delay the construction period.

    2. Disadvantages of half a package: that is, you need to control the whole process, and you must go to the material market to run the material during the rest time, and the final result of running out of the same brand and model may not be better than the ** Ruyi given by the decoration company, but you can rest assured that you can buy it in person. And the later construction site should be watched by yourself, so as not to have problems in the later stage of the construction site.

    3. How to choose half a package and an all-inclusive.

    If you have enough time and know more about decoration, you can choose a half package.

    If you have time, but you don't know how to decorate, it is recommended that you choose all-inclusive.

  5. Anonymous users2024-02-08

    The house is very happy, but I don't understand the decoration at all and have a headache, if you want to succeed in the decoration of the new house, the most important thing to do is to find a good decoration company, so it becomes particularly important to choose a decoration company when you start to decorate, and it is not a simple thing to choose a decoration company, not only to construct, but also to serve well. So what should I pay attention to when talking about half a package with a decoration company? 1. Find the corresponding design company according to your own project, and it is obviously unrealistic for a small home improvement company to ask a decoration company with Grade A qualification to do it for you; ?

    ?2. Go to the decoration company for a field trip to see the scale of the company, this part represents the strength of the company, look at the model information, if you can, it is best to go to the model room to see on the spot; ?

    ?3. Go to the construction site where the company is currently building, if the management is in place and the workmanship is good, you can basically consider choosing this, of course, you have to talk about it.

    If the construction site is messy, you should hurry up and look for it again; ?

    4. Explain all the requirements and ideas of the new house in your mind to the designer clearly and communicate well, otherwise the things you will make at that time are not exactly what you think in your heart; ?

    5. This is very important, don't believe in those decoration companies that are free of design fees, designers are also people, they also want to earn, no design fees their money from the **? Therefore, companies that dare to charge design fees are generally very powerful companies, and small companies rely on these things to attract customers, in fact, the wool is still out of the sheep; ?

    ?6. Check the plan carefully, before this you have to pay a deposit and other deposits (if you are not completely sure do not pay first), because the drawings are CAD, so you communicate well with the designer, if there are renderings, of course it is the best; ?

    ?7. After determining the design plan, it is to sign the contract, generally two contracts for design and construction, or it can be a contract that merges the content together, carefully check the ** of each item, the number of obvious problematic projects to be proposed, and there is to prevent over-reporting projects and under-reporting projects, under-reporting projects will ask you to add later, and you have to pay for it, and then it is the material, you must see whether it is the brand and model you specified, and the model should be noted that many people are easy to ignore.

    About talking with the decoration company to pay attention to some matters to introduce this, you only need to pay attention to the above when signing the contract, probably there is no problem, you must be careful when signing the contract, some details can not be missed, the general decoration company for the project warranty period, from two years to five years, so as far as possible to choose a longer warranty company.

  6. Anonymous users2024-02-07

    1. First of all, it is clear that half a package, half a package generally refers to the "four links and one flat" project of the house, which is.

    The surface mainly includes special water, electricity, ventilation, network and ground and wall leveling projects.

    2. The water in the half package mainly refers to the water pipe laid to the position that needs to be used according to the requirements of the owner, including two parts: water outlet and water inlet, generally including the water in the kitchen, the toilet in the bathroom, the shower room, the mop pool, the washstand, and the washing machine.

    3. The ventilation in the half-package has been connected by the general developer, which is mainly related to the kitchen stove and natural gas water heater.

    4. The energization in the half-package is relatively easy to understand, and all the electricity to be used must be energized, which means that the wires are laid, the plug is set, the switch is set, etc.

    6. The leveling projects in the half-package mainly include: the living room, the main and secondary bedrooms, and the balcony wall leveling, mainly referring to the latex paint project, the background wall project, the ceiling project in the design scheme, and the wallpaper project of some owners.

    7. Other parts of the half-package project that must be completed by the decoration company also include the door sleeve foundation, which is to make the place that needs to be installed into a finished door that can be installed directly.

  7. Anonymous users2024-02-06

    This depends on whether you have talked about this detail in the early communication with the decoration company, if the early stage has indicated that you want to match the seam, there is no seam in the construction can ask the decoration company to rework, if you do not talk about the details in the early stage, it depends on how you talk to the decoration company. Linquan and Qing Decoration is committed to creating a warm and comfortable home for you.

  8. Anonymous users2024-02-05

    It's not the same, the general decoration company only makes a seam for you, and the seam agent is generally sent by the brick seller, or the decoration company buys it itself, and the market price of the beautiful sewing is about 30 to 120 square meters! If you make 100 square meters of wall and floor tiles in your home, the cost will go up. The renovation company won't give you what to do for free.

  9. Anonymous users2024-02-04

    Seams are not included. This has to find a professional to do, generally more than 10 to 20 square meters, and the decoration company is definitely not willing to pack. Ordinary caulk costs a few dollars a pack, while the beauty sewing treatment requirements are relatively high, and the effect is obvious, dirt resistance, beauty, practicality, etc.

  10. Anonymous users2024-02-03

    This is not included, and you need to find another special person to do it.

  11. Anonymous users2024-02-02

    Are you all-inclusive, and if so, the beauty sewing agent is also wrapped in it.

  12. Anonymous users2024-02-01

    I'm a bricker. Analyzing your situation, it is estimated that your half package ** is not high, and the decoration company is not profitable, so it is snub to you. As you said, smashing the wrong wall leads to an ugly ceiling, no matter whose responsibility it is, as long as you change the plan, there will be an extra expense, and the decoration company will not be willing to bear it.

    As for buying ceramic tiles, we in Xuzhou here take people to buy ceramic tiles to mention 30%, do you understand? You do your own research, and the renovation company doesn't make you any money, and you now have the idea of terminating the contract, which may be what the renovation company expects. The best solution is to have a good relationship with them, and smoke no matter who comes, in order to reduce the loss.

    Renderings are not just what you say, and the designer is asking the boss to pay the salary. If you don't know how to decorate, don't find someone to do it yourself. I'll give you an example of tiling.

    Tile purchase 100 square 8,000 yuan, cement yellow sand 2,000 yuan, labor cost of 5,000 yuan, if the paste is not good, tile cement waste rebuy not to say, the tile on the wall as garbage smashed down the labor cost will have to be thousands. Garbage downstairs fee, you have to buy pockets of garbage,,, if you really can't change companies, the contract stipulates that your construction period will be strictly enforced. How's that, let's give points.

  13. Anonymous users2024-01-31

    If it is a large area of falling off, it must be a problem of the decoration company, if it is an individual brick falling, then deal with it yourself, it is more troublesome to find.

  14. Anonymous users2024-01-30

    There are many reasons why the wall tiles fall off, and if it is the cause of construction, this responsibility should be the renovation company. Of course, it may also be the reason for the decoration materials, or the reason why the wall is not strong, which will also lead to the wall tiles falling off.

  15. Anonymous users2024-01-29

    The developer's responsibility is due to the poor quality of the materials used by the developer during construction.

  16. Anonymous users2024-01-28

    It depends on what causes the tiles to fall off, whether the tiles fall off due to human factors, or whether the construction causes them to fall off, and when signing the contract, the warranty period is one year or 2 years.

  17. Anonymous users2024-01-27

    The half-package is between the clear package and the half-package, the decoration company is responsible for procurement, construction and auxiliary materials, and the owner himself is responsible for buying the main materials.

    The main materials that the owners need to buy themselves: floor tiles, wall tiles, tiles, paints, doors, kitchen cabinets, sanitary ware, locks, lamps, faucets, electrical appliances, wardrobes, bookcases, furniture, curtains, hardware, etc.

    The decoration company is responsible for buying auxiliary materials: cement, sand bricks, large core boards, decorative panels, water pipes, wires, latex paint, switch panels, kitchen and bathroom ceilings, shoe cabinets, waterproofing agents, living room TV background walls, living room layout ceilings, stones, window sill marble materials, distribution boxes, etc.

    Advantages: (1) You can take the initiative by yourself;

    2) The decoration materials you buy yourself will be more assured;

    3) There is a decoration company to help design, and you will save a lot of worry;

    4) You can save some effort in some small things.

    Disadvantages: (1) If you want to buy the main materials for decoration, you need to do your homework in advance, and it will be very troublesome if you accidentally buy the wrong one;

    2) Decoration auxiliary materials let the decoration company purchase, and if you encounter unreliable ones, you will definitely be pitted;

    3) The decoration company will have restrictions on the materials of the half package, and cannot be selected at will.

  18. Anonymous users2024-01-26

    Semi-packaged repair includes the renovation of indoor structure, the renovation of hydropower and muddy construction; The second is the construction of wood and lacquer, including bricks, water pipes, switch panels, power grid lines, caulks, small hardware, etc. The precautions for semi-package repair are: first, we must determine the design scheme; The second is to do a detailed budget for the main materials in order to avoid budget overruns in the later stage; Finally, be sure to measure the actual area size.

  19. Anonymous users2024-01-25

    What does it mean to decorate half a package and what items are included in a half package repair.

  20. Anonymous users2024-01-24

    1. Half package includes indoor structure renovation (such as wall demolition or new wall) 2. Half package includes hydropower renovation construction (water supply and drainage design and installation, circuit design and installation, sanitary ware installation, etc.) 3. Half package includes mud construction (backfill, ground leveling, waterproof treatment, wall tiles and floor tiles, etc.) 4. Half package includes wood construction (ceiling, modeling production and some on-site production of furniture, etc.) 5. Half package includes paint construction (wall, wallpaper or latex paint, furniture paint, etc.) Many decoration companies plan to also include the purchase of some auxiliary materials, mainly: cement, river sand, gypsum board, modeling plates and small miscellaneous parts (such as nails, bolts, universal glue, etc.), but these auxiliary materials are varied, but also pay attention to the contract agreement.

  21. Anonymous users2024-01-23

    Walls, floors. Hydropower additionally**. Others are not included, or additional**.

  22. Anonymous users2024-01-22

    Half a package is mainly hydropower tile oil, Ming really understands.

Related questions
7 answers2024-07-13

Each has its own advantages, depending on individual circumstances. Buying materials for decoration by yourself is more hard and tiring. It is more time-saving and labor-saving to find a decoration company. >>>More

8 answers2024-07-13

Decoration is generally divided into full package, half package, and package cleaning work; >>>More

1 answers2024-07-13

The specific decoration of the house can be calculated here,just enter the area city,calculate the decoration in seconds,know the real in advance,and

6 answers2024-07-13

For many people who are about to decorate, they generally want to understand what the decoration half package is and how to calculate the decoration half package, so as to have an understanding of the concept of half package repair and the decoration cost. Since you want to know these information about the decoration half package, let me introduce to you what the decoration half package is and how to calculate the decoration half package. >>>More

8 answers2024-07-13

The price per square meter of semi-packaged repairs will be affected by a number of factors, including location, housing condition, decoration standards, material selection and the pricing strategy of the renovation company. Therefore, it is difficult to give accurate uniform standards. >>>More