Do you install doors or paint walls first when you decorate your house?

Updated on home 2024-07-26
19 answers
  1. Anonymous users2024-02-13

    First paint the wall with putty.

    Two times, then install the door, and then paint the wall putty one last time.

    This ensures that the junction between the wall painting and the door cover line is at a vertical angle of 90 degrees, which works well from a distance and up close.

    It's a good idea to close the details beautifully, but this method is generally only found in high-end homes. Because the wall is painted putty twice and then stopped and waited for the door to be installed for the last pass, many construction teams are unwilling to wait, which is time-consuming and labor-intensive.

  2. Anonymous users2024-02-12

    The decoration of the new house should be done after the wall is painted once before installing the door, so that the door effect will be much better if the wall is smoother.

  3. Anonymous users2024-02-11

    According to the order of the decoration project, the installation of the interior door must be after the wall decoration.

    In fact, the installation of wooden doors in the overall decoration is considered to be the final construction project. Interior doors are installed not only after the wall decoration, but also after the floor and ceiling decoration. In addition to doors and curtains, the installation of interior doors can be said to be the last project to be implemented.

    This is mainly to protect the door from being bumped, of course, the wooden door is installed at the end, which is also inseparable from the convenience of other projects.

  4. Anonymous users2024-02-10

    There are several ways to decorate whether to install the door or paint the wall first, and you can choose by yourself. Generally, these two projects are done alternately.

    Paint the wall and install the door order.

    1.Paint the wall first and then install the door: After the oiler has done the putty and wall paint, then the carpenter enters the site to install the door.

    The advantage of this practice is to avoid the door being damaged by the oiler during construction, and at the same time to avoid the door dirty, and at the same time the oiler construction is more convenient. The disadvantage is that the oiler needs to repair the joints of the door casing, window casing and wall in the later stage. This method is a normal construction sequence, but the error of the hole in the wall of our house is relatively large.

    2.Scrape putty first, install the door, and then paint: this method is now used more, mainly because the flatness of the wall is poor, and it requires oilers and carpenters to cooperate with the construction.

    First the whole plaster leveling, then paste the fiber mesh cloth, drape a layer of putty, and then install the wooden door. After the installation of the wooden door is completed, scrape the second layer of putty, and sand, and then paint the wall. After the installation of the wooden door is completed, it is best to protect it with a protective film.

    The advantage of this practice is that the carpenter and oilman cooperate to deal with the gap between the door and window cover and the wall, so as to avoid uneven gaps and ugliness. The disadvantage is that it is difficult to coordinate the types of work.

    3.Install the door first and then paint the wall: Before the oiler works, the door is installed, which is relatively rare, but there are also cases.

    Because the current wooden doors are customized, the cycle is relatively long, and there is no need for oilers to paint on the wooden doors, so they are basically installed during the oiler construction process or after the construction is completed. In the past, the doors were all made of carpentry, so first install the door cover, wooden door, adjust it well, remove the door, and then the oilman painted, and then install it after the paint is painted. Handmade wooden doors need to be pressed for a period of time after painting to avoid deformation.

    So if it is a customized wooden door, it is generally installed when the oiler is finished or when the oiler scrapes the putty. If it is a handmade wooden door, it should be installed before the oiler enters the field. Click for more content.

  5. Anonymous users2024-02-09

    When decorating a house, you should first secure the door and then paint the walls. The main reason is as follows: Anmen knows that if you use a chainsaw or other tools, if you have painted the road, the wall will be dirty.

    The set door is installed, which needs to be horizontal and vertical. It is impossible to meet such requirements with general wall plastering. When installing the door line, it is necessary to remove the bumps and pits.

    It is necessary to repair the defects when scraping the wall grin, so that the gap between the wall and the mouth line is straight and beautiful.

    Before scraping putty, you should use plaster to level the wall, and then you should scrape the putty on the wall. In the decoration wall treatment process, the putty needs to go through multiple processes, and the materials used should also have a sense of delicacy, and the putty material should be evenly applied on the wall to form a flat and neat decorative effect.

  6. Anonymous users2024-02-08

    It should be the gate first and then the wall. The main reason is as follows: you need to use a chainsaw and other tools when you install a door, and if you have painted it, your walls will be stained.

    When the door is installed, there will be door sleeve wire, base carpentry board and other materials, those materials are long and hard, and the wall will be damaged by accident. Although the wall can be repaired, there is always a certain gap between the wall that is repaired and the wall that is done at one time.

  7. Anonymous users2024-02-07

    The general practice is to install the door first and then paint the wall. The advantage of this is that the gap between the wall and the lining can be repaired while painting.

    But nowadays, most of them paint first and then install the door, for two reasons:

    First, the construction period of the customized door is longer, and the business in order to save time is generally done after the door is done well, so that it can be installed.

    Second, if the paint is painted, if the wall paint is slightly improperly operated during the painting process, the wall paint will splash on the door, and the corrosive paint will contaminate the paint surface of the wooden door, or other problems that affect the door.

  8. Anonymous users2024-02-06

    Install the door first and then brush the wall, because the wall can not be completely flat, when installing the door, it will inevitably lead to a certain gap between the door sleeve and the wall, which can be filled before brushing the wall to ensure the overall beauty. Don't worry about brushing the wall when brushing the door, the general latex paint can be wiped off with a wet rag on the door, and the business will provide door guards when buying latex paint, it is best to have a person who knows how to stare at it when decorating, otherwise it will not only detour, but also unsatisfactory.

  9. Anonymous users2024-02-05

    In my house, the walls are dealt with first, and the doors are installed last.

  10. Anonymous users2024-02-04

    The wall paint is easy to clean. Let's install the door first. 、

    Even if the paint gets on the door. 、It's good to clean up after that。 、

    It is not easy to clean up the old first brush. 、

    But be careful with the walls.

  11. Anonymous users2024-02-03

    The new house has to install the door first and then paint the wall. Because after installing the door, before painting the wall, the decoration worker can fill all the gaps in the door into a whole. However, it is important to note that the door needs to be wrapped to prevent staining the door frame during the process of painting latex paint.

    In addition, there are door sleeve lines, base carpentry boards and other materials when Anmen, those materials are long and hard, and the installer accidentally knocks down the wall. Although the wall can be repaired, there is always a certain gap between the wall that is repaired and the wall that is done at one time.

    New house decoration, door line generally can not be completely flat and straight with the wall, after the door is installed, there will generally be gaps, if you want to fill those gaps need to take a certain amount of time, small gaps can be patched at one time, such as large gaps, that can be a few times to the master. You will have to paint it after it is repaired, so you must install the door first.

  12. Anonymous users2024-02-02

    Decoration is generally done after painting first, and then the door is installed. If you install the door first and then paint it, you can't paint it in all directions.

    Wooden door painting skills:

    1.First, fill the knots and grooves with putty, wait to dry, and polish;Then fill the putty, wait to dry, and polish;

    2.Apply the primer twice, and add water to the sandpaper after each time it is dry.

    3.varnish once or twice overlay.

    The whole process of paint should be diluted and applied as evenly and thinly as possible.

  13. Anonymous users2024-02-01

    It must be painted first, and if it does not meet the requirements of installing the door at the same time, you can put a layer on the side as he said, and you can also use fast adhesive powder to make up, and then spread kraft paper after repairing, and then scrape putty. This one must be painted first. Now if you want to remedy, the paint is shoveled for him, after the shovel is finished, if he finishes the decoration for a short time, I suggest that you shovel down the whole down, after the shovel is finished, give him a remedy, remedy and repaint, while painting I suggest that if a wall is white, the whole wall is lined up more than twice, so that it is not easy to appear that the effect is not the same, and the color of the paint is also the same after painting.

    The knowledge of the home network forum is good, I have studied a lot better, I recommend you to take a look.

  14. Anonymous users2024-01-31

    After the wall putty is batched first, you can brush the latex paint first, and then you should go to install the door immediately. If your finished door merchant is willing to install the door frame and door sleeve in advance, it is the best, and the door can be a little later.

    After the door frame and door sleeve installation technology, the painter needs to repair the gap next to the door sleeve. Therefore, it should be installed after the wall putty is batched and before the latex paint is painted.

  15. Anonymous users2024-01-30

    Usually, the door is painted first, and if you need to adjust your position later, the order will be reversed.

  16. Anonymous users2024-01-29

    Install the door first, and then put a film on the door to protect it.

  17. Anonymous users2024-01-28

    Decoration must be installed and then painted, what kind of door is yours?

  18. Anonymous users2024-01-27

    This doesn't matter, it's all there...

  19. Anonymous users2024-01-26

    The order of painting walls and installing doors when decorating the house can be determined according to the requirements and progress of the construction period. 1. If the construction period is tight and the door has arrived, it can be carried out at the same time as scraping putty; If there are no restrictions, it is best to install the suit door first and then scrape the putty. 2. There are certain benefits to installing the suit door first

    The set door is installed, which needs to be horizontal and vertical. It is impossible to meet such requirements with general wall plastering. When installing the door line, it is necessary to remove the bumps and pits.

    It is necessary to repair the defects when scraping the wall putty, so that the gap between the wall and the mouth line is straight and beautiful. 3. There is also a disadvantage of installing the door first, that is, it increases the difficulty of putty construction, which needs to be protected by a protective film, which increases the difficulty of construction, but ensures the overall construction quality.

Related questions
6 answers2024-07-26

Throughout the renovation process, the installation of the door cabinet is usually carried out in the final stage of the renovation. This is mainly because the installation of the door cabinet needs to be carried out after most of the decoration work such as wall painting and floor laying is completed to prevent damage to the door cabinet during the decoration process. In addition, the installation of the door cabinet also needs to be carried out after the installation of infrastructure such as wires and water pipes to ensure that the installation position of the door cabinet does not conflict with these facilities. >>>More

8 answers2024-07-26

Among the many whole-house custom brands, Beiyi is a brand worth recommending. With its high-quality products and services, BEYI has won wide acclaim from consumers. We have a wide range of customized products, including wardrobes, bookcases, shoe cabinets, wine cabinets, TV cabinets, etc., which can meet the needs of different consumers. >>>More

12 answers2024-07-26

Let's talk about the order of decoration in my personal home at that time. >>>More

5 answers2024-07-26

The normal is to pave the floor tiles, gradually measure the customized cabinets, doors, door and window covers, etc., so as to gradually go on the carpentry, the carpentry is done gradually batch the wall, paint, after the customized cabinets, doors this kind of home, gradually assembled. Process: After making home furniture and carpentry, and laying bricks for interior decoration, it is necessary to gradually customize home furniture, wardrobes, kitchen cabinets, sprinkle cabinets, shoe racks, doors, door and window covers, etc. >>>More

14 answers2024-07-26

In the renovation process, we usually hit the cabinet first and then install the door. This is because the design and fabrication of the cabinet requires more time and effort, while the installation of the door is relatively simple and can be done after the cabinet is completed. In addition, if the door is installed first, it may have a certain impact on the production and installation of the cabinet, such as space limitations. >>>More