    The normal is to pave the floor tiles, gradually measure the customized cabinets, doors, door and window covers, etc., so as to gradually go on the carpentry, the carpentry is done gradually batch the wall, paint, after the customized cabinets, doors this kind of home, gradually assembled. Process: After making home furniture and carpentry, and laying bricks for interior decoration, it is necessary to gradually customize home furniture, wardrobes, kitchen cabinets, sprinkle cabinets, shoe racks, doors, door and window covers, etc.

    At the same time, the carpenter enters, and at this time the raw materials are first, which is the contractor who has calculated the raw materials, so that the past is pulled (some customers are contractors).

    Conventional living room decoration, hotel, corridor, restaurant kitchen, bathroom, balcony ceiling, which are carried out by carpentry, generally a construction site according to 2 carpentry calculations, this kind of decoration ceiling, more than 5 days to get it. If you add a TV background wall, it will be more than half a day. After the carpentry is over, after digging out the light hole, you can remove your own waste and leave the site.

    Lacquer worker entry: followed by the lacquer worker's entry, the lacquer worker has to approve the wall, spray latex paint, generally push the wall first, repair the wall cracking, decorate the ceiling nail hole, the seam, the closing angle line, this is similar to 1 and a half days.

    Top ground leveling, wall leveling, the first putty powder, this may be 2 days long. It's cool in the middle, this is based on the temperature, like spring, Akita, generally 1 day to do, the weather is not good, this is not easy to say, the wall is leveled thick, it must be not easy to dry, to do it before starting the second time. The second putty powder can be scraped in one day, and it is waiting to be dried, all according to the temperature factor.

    The walls and tops are leveled and dried, so you can polish and polish, and the grinding and polishing is a careful work, and you can't rush too much, the purpose is to polish and polish it in order to be uninhabited, and I usually need to polish and polish it in two days.

    I don't paint most of the primer here, the topcoat says it works, I don't feel like it works, and if the walls are damp, the paint won't be done. It may take about 10 days for the wall to be completed. Able to be cleaned simply.

    The decoration of new houses, the batch of putty and the assembly of solid wood doors are all necessary processes, and the following process needs to be assigned at the end of the plasterer wall and floor tile paving. The normal decoration sequence is basically to apply plaster to level the ground at the bottom of the embryo room; Later, it can be regarded as the assembly of solid wood doors and custom wardrobes. Naturally, it is not a certain situation, the example of the set door installed in front of the ground leveling of the bottom floor of the wall, or some; It is not possible to clear and individual phenomena.

  2. Anonymous users2024-02-11

    In general, it is necessary to install the door first, and then scrape the putty, which can better solve the problem of some gaps, and the steps can be adjusted if there is a mistake, and it will not cause a great impact.

  3. Anonymous users2024-02-10

    When decorating, the ground of the home should be paved first, then the putty scraped, and finally the doors and windows should be installed, because the putty will inevitably hurt the doors and windows after the doors and windows are installed.

  4. Anonymous users2024-02-09

    When decorating, it is generally necessary to scrape putty first and then install the door, if the door is to be painted, be sure to brush the door paint first, and then scrape the putty powder.

  5. Anonymous users2024-02-08

    When decorating, you should scrape the putty first and then install the bedroom door, because the putty is easy to pollute the bedroom door and door cover, and the installation of the door will not pollute the putty on the wall.

    There are many processes to be carried out in decoration, and certain principles must be followed, such as the beginning of the water and electricity transformation, and then the wall can be built and the ceiling is tiled, and different decoration processes have a sequence, so as to ensure the quality and effect of decoration. For example, when decorating, scraping putty and installing bedroom doors should choose to scrape putty first and then install bedroom doors.

    First, scraping putty is easy to cause pollution to the wooden door

    Now people choose the bedroom door are wooden doors, first the bedroom door is installed and then scrape the putty, it is easy to splash and fall, it will cause a certain amount of pollution to the installed bedroom door, it will be more troublesome to clean up the putty, and it is easy to cause irreparable damage to the door, which will affect its decoration effect and use feeling.

    Second, the putty will contaminate the door cover

    Now people's customized bedroom doors are finished doors, not only the door but also the door cover, and the door cover will be in direct contact with the wall when installing, if the bedroom door is installed first and then scrape the putty, it will cause a certain amount of pollution to the door cover in the process of scraping the putty, which will affect the visual effect of the door cover, if you want to clean up the polluted putty, it takes a lot of effort, and it is difficult to restore the door cover after cleaning.

    3. Installing the bedroom door will not affect the effect of putty

    After scraping putty on the wall, it will be relatively flat and will turn white, and it will not have a negative impact on the putty on the wall and the decorative effect when installing the bedroom door. Because when installing the bedroom door, the door cover will be directly put on the wall of the hole, and then the styrofoam will be used to fill and fix, even if the installation is completed after the glue is completed, and finally the door leaf will be installed again, the whole process will not cause pollution and damage to the wall, so the decoration should be scraped putty before installing the bedroom door.

    After reading the above introduction, you can know that it is okay to scrape putty and install bedroom doors first when decorating, but it will be better to scrape putty first, which can ensure the quality and effect of decoration, and will not cause pollution and adverse effects on bedroom doors.

Related questions
26 answers2024-07-17

When decorating, it should come firstScrape puttyThen install the bedroom door, because scraping putty is easy to contaminate the bedroom door andDoor casing, and the installation of the door will not cause pollution to the putty on the wall. >>>More

22 answers2024-07-17

When doing interior decoration, in general, we will do the putty work on the wall first and then install the bedroom door. This sequence is mainly based on the logic and efficiency considerations of the renovation project. >>>More

17 answers2024-07-17

When doing interior decoration, the correct order should be to scrape putty first and then make cabinets. First of all, scraping putty is the basic project of interior decoration, and its main role is to make the wall smooth and provide a good foundation for the subsequent wall decoration. If you make the cabinet first, it may affect the working effect of scraping putty, and may even cause the cabinet to be contaminated with putty. >>>More

16 answers2024-07-17

When it comes to interior renovation, the usual step is to scrape putty before installing the door. This is because putty scraping is the process of leveling and beautifying the wall, and if the door is installed first, it may cause pollution or damage to the surface of the door. In addition, sanding and painting are required after scraping putty, which can cause unnecessary damage to the doors that have already been installed. >>>More

17 answers2024-07-17

In response to the question of "scraping putty first or installing the wardrobe first, how would you choose?" "This question, in my personal opinion, should be based on the actual situation: >>>More