I just bought a building and the construction crew punched a few holes in the board, what should I d

Updated on society 2024-07-13
12 answers
  1. Anonymous users2024-02-12

    In the building that I just bought, the construction crew has made several holes in the roof or floor, in which case the structure must be repaired according to the size of the holes. If the edge of the hole is greater than or equal to 300 mm, it is required. Rebar is implanted and concrete is poured for repair.

    If conditions permit, it will be better to find the original steel bar for welding and reinforcement and repair it later. Hope mine is helpful to you.

  2. Anonymous users2024-02-11

    You can find a developer or property repairs. Because the quality of some engineering projects is not in place after the completion of a time, or many engineering projects need to be observed for a long time, it may not be possible to check whether there is a quality problem when it is completed and accepted, but it must be found by use. At present, the warranty period for residential decoration stipulated by the state is two years, and the warranty period for kitchen and bathroom waterproof projects is five years.

    The owner should pay attention to carefully observe the various quality problems of the house, negotiate with the developer or the property in time, and try to solve them within the warranty period.

  3. Anonymous users2024-02-10

    This can be found in them.

    Ask questions before you accept them.

    Or you can ask for it later.

    It's all your right.

  4. Anonymous users2024-02-09

    This doesn't matter, he should check whether the wall process is sturdy, it's just a quality check.

  5. Anonymous users2024-02-08

    The fault of the construction workers should be solved by themselves until you are satisfied.

  6. Anonymous users2024-02-07

    If this is your personal one, then surely they have no right to impress your house.

  7. Anonymous users2024-02-06

    Summary. Kiss Punching holes in the floor slab is because the reinforcement density of some floor slabs does not meet the requirements and needs to be filled.

    Kiss Punching holes in the floor slab is because the reinforcement density of some floor slabs does not meet the requirements and needs to be filled.

    If it is a high-rise building, it must be reserved for a hole in the floor slab during construction. In this way, in the later stage, these devices such as elevator shaft holes, various vents, and equipment shafts can be installed. And it can be used as a pipeline reserved hole for electromechanical installation, as a projection hole for measurement and positioning, and as a hoisting hole for installation equipment.

    After the floor slab is penetrated, when Chongyuan fills the hole, it is necessary to wet the perimeter of the hole first, and then fill the hole with sailor Zheng mud and bricks. If it is a relatively large hole, be sure to use cement slurry and bricks and steel bars to play a supporting role. Then the entire floor slab should be reinforced, and then after the hole is filled, it should be painted with leakage plugging, and then it must be brushed with waterproof paint after it dries.

    This is the reason why we need to leave a hole in the floor slab when we are building in real life.

  8. Anonymous users2024-02-05

    Summary. Hello dear, happy to answer your <>

    Punching 30 holes in the floor slab is serious because it affects the overall quality structure.

    Is it serious to have 30 holes in the floor slab.

    Hello dear, happy to answer your <>

    Punching 30 holes in the floor slab is serious because it affects the overall quality structure.

    Legal analysis: the impact of the floor closed board punching on the safety of the house should be specifically analyzed, if the number is not large, not in the "early trouble", the damage will not be too early to crack seriously; If it is hit on the steel bar, load-bearing and other parts, it will bring potential safety hazards.

    Legal basis: Article 275 of the "Law of the People's Republic of China" Whoever intentionally destroys public or private property, where the amount is relatively large or there are other serious circumstances, is to be sentenced to up to three years imprisonment, short-term detention or a fine; Where the amount is huge or there are other especially serious circumstances, the sentence is to be between three and seven years imprisonment, and Article 36: Where the victim suffers economic losses as a result of the criminal act, the offender shall be punished in accordance with law, and shall be sentenced to compensation for economic losses according to the circumstances. Where criminals who bear civil liability for compensation are concurrently sentenced to a fine, and their assets are insufficient to pay in full, or where they are sentenced to confiscate their assets, they shall first bear civil liability for compensation to the victims.

  9. Anonymous users2024-02-04

    Hello dear for your question, oh <>

    30 holes are serious <> the floor slab, from a legal point of view<> the normative section disturbance requires that it is strictly forbidden to open holes in the prefabricated slab, but if it is played in the direction of the slab, it can be guaranteed that the internal prestressed steel bar is not cut off, and it is no problem to hit a few less, but how long will it take to lose two days. But if it is done vertically, you have to cut off two steel bars, so it's better not to do it. If the hole is small, it will generally not have any effect on the floor slab; If the hole is larger, it will not only reduce the overall stiffness and load-bearing energy of the floor slab, but also weaken its seismic energy.

    Floor slab drilling, if not operated properly, is easy to cause damage to the steel bar and floor structure, which will reduce the load-bearing capacity of the floor slab. Theoretically speaking, the floor slab can not be punched at will, if the decoration needs, it is necessary to use special tools to quietly punch holes, and can not use electric hammer drilling, so as not to cause the floor slab to produce lie joints due to too strong vibration.

  10. Anonymous users2024-02-03

    Summary. Hello dear, I'm honored to answer for you, 30 holes in the floor slab are generally serious kisses!! If the hole is small, it will generally not have any effect on the floor slab; If the hole is larger, it will not only reduce the overall stiffness and load-bearing performance of the floor, but also weaken its seismic performance.

    Hello dear, I'm honored to answer for you, 30 holes in the floor slab are generally serious kisses!! If the hole is small, it will generally not have any impact on the floor slab; If the hole is larger, it will not only reduce the overall stiffness and load-bearing performance of the floor, but also weaken its seismic performance.

    Extended information: Floor slab drilling, if not properly operated, is easy to cause damage to the steel bar and floor structure, which will reduce the bearing capacity of the floor slab. Theoretically speaking, the floor slab can not be punched at will, if the decoration needs, it is necessary to use the tools used in the town to punch, and the electric hammer can not be used to drill holes, so as not to cause cracks in the floor slab due to the vibration feeling is too simple and strong.

    Theoretically speaking, the load-bearing wall can be punched, but it has strict requirements for the size and number of holes in the place of punching.

    When drilling holes in the floor slab, it doesn't matter if the steel bar is drilled, causing the edge concrete to crack.

    Dear, it doesn't matter if there is such a small crack.

    It will not affect the stability of the floor slab.

    No, dear. Rest assured.

  11. Anonymous users2024-02-02

    These holes can compromise the integrity and strength of the floor, causing the floor to become unstable and prone to safety issues such as cracks and subsidence. In addition, the number, size, depth and location of holes will also affect the structural safety of the floor. If there are too many holes, too large or not properly placed, it may lead to a reduction in the bearing capacity of the floor, affecting the use and safety of the house.

    Does it make a difference if there are more than a hundred holes in the floor of a room?

    Hello, dear, happy to answer your questions! If there are more than 100 holes in the floor of a room, then it can have a serious impact on the floor structure. These holes may damage the integrity and strength of the floor, causing the floor to become unstable and prone to cracks, subsidence and other safety issues.

    In addition, the number, size, depth and location of the holes will also affect the structural safety of the floor. If there are too many holes, too large or not properly placed, it may lead to a reduction in the bearing capacity of the floor, affecting the use and safety of the house.

    What should I do?

    If more than a hundred holes have been made in the floor of a room and the impact on the floor structure has been discovered, then the following measures are recommended:1Immediately stop drilling holes on the floor to avoid further damage to the floor structure.

    2.Conduct a structural assessment and analysis of the floor to determine the extent to which the location, size, and number of holes affect the floor structure. 3.

    Based on the assessment results, a corresponding remediation plan is formulated. If the hole has little impact on the floor structure, the hole can be filled with filler and the hole can be judged to be rotten; If the hole is large or the location is inappropriate, it needs to be strengthened and reinforced. 4.

    Implement a restoration plan to ensure the quality of construction and avoid re-damaging the floor structure. 5.Regularly inspect and maintain the floor structure to ensure its safety and stability.

    It should be noted that the repair and reinforcement of floor structures require professional building engineers or structural engineers to design and construct, and it is not recommended for non-professionals to operate. At the same time, a comprehensive assessment and analysis of the floor structure must be carried out before any repair and reinforcement can be carried out to ensure the feasibility and effectiveness of the repair and reinforcement scheme.

    Is it necessary to do a house inspection.

    Dear, yes, ask a professional to evaluate and inspect the <> of the house

    That is true. Does this make a difference?

    If the floor of a room has been drilled with more than 100 holes and a short stick inserted, this kind of cracking practice may have an impact on the stability and safety of the floor structure. Because the insertion of the short stick may destroy the integrity and strength of the floor surface, resulting in the floor becoming unstable, prone to cracks, subsidence and other safety problems.

  12. Anonymous users2024-02-01

    Summary. Hello, happy to answer your <>

    30 holes in the floor slab are generally serious kisses!! If the hole is small, it will generally not have any effect on the floor slab; If the hole is larger, it will not only reduce the overall stiffness and load-bearing performance of the floor, but also weaken its seismic performance.

    Is it serious to have 30 holes in the floor slab.

    Hello, happy to answer your <>

    There are 30 plum-type holes on the floor slab, which are generally serious kisses!! If the hole is small, it will generally not have any impact on the floor slab; If the hole is larger, it will not only reduce the overall stiffness and load-bearing performance of the floor, but also weaken its seismic performance.

    Floor slab drilling, if not properly operated, is easy to cause damage to the steel bar and floor structure, which will reduce the bearing capacity of the floor slab. Theoretically speaking, the floor slab can not be punched at will, if the decoration needs, you need to use special tools to punch holes, otherwise you can use an electric hammer to drill holes, so as not to cause cracks in the floor slab due to too strong vibration. Theoretically speaking, the load-bearing wall can be punched, but it has strict requirements for the size and number of holes in the place of punching, and it can not be punched next to the steel bar when punching, and the original structure can not be destroyed, so as not to damage the safety performance of the house.

Related questions
6 answers2024-07-13

1. The employer that signed the "Labor Contract" with you shall apply for work-related injury recognition and enjoy work-related injury benefits, and if the employer fails to pay the work-related injury insurance premium for you, the employer shall be liable for compensation. >>>More

36 answers2024-07-13

Lin Ruiyang's ex-wife had a bad time, heard that she had depression, and committed suicide. Later, he took his children and did not remarry, and it seems that he was seriously injured by Lin Ruiyang.

9 answers2024-07-13

Cotton clothes are washed with light salt water before washing. >>>More

7 answers2024-07-13

2. Enter the required information. It includes the last 6 digits of the ID number and the last 7 digits of the ICCID. >>>More

16 answers2024-07-13

The bracelet that I just bought a few days ago was scratched and leaked white may be due to one of the following reasons: >>>More