What are the most likely hidden projects in decoration? How should I pay attention to it?

Updated on home 2024-07-03
5 answers
  1. Anonymous users2024-02-12

    What are the most important decoration concealment projects in interior decoration? How should we pay attention to it?

    1. Nowadays, the most effective moisture-proof method is ground waterproofing. It must be noted that the waterproof material must be brushed with 2 or 3 layers, and each layer must be guaranteed to dry before brushing the next layer. And don't do waterproofing in even rainy temperatures, waterproofing materials dry slowly, which will delay the construction period.

    2. At the interface of the wall foot, wall joint, pipeline and wall, this kind of location is a waterproof heavy pollution area, and the wells need to be brushed with waterproof materials in an orderly manner. The wall of the shower area also needs to be waterproof, and the relative height of moisture-proof should not be less than meters.

    3. After the ground waterproof is completely dry, it is necessary to do a 24-hour irrigation test, so that the actual effect of moisture-proof can be checked.

    Renovation of water and electricity renovation:

    1. The waterway line must be horizontal and vertical.

    2. The toilet generally runs the top of the water pipeline without moving, which is more convenient to maintain.

    3. The middle of the cold and heating pipes and their drains should be at a good level, generally speaking, the left is hot and the right is cool.

    4. After successful installation, the water test must be carried out with a pressure test pump. The water can be left out, which proves that the inside of the water pipe is smooth, prefabricated components.

    Hardware sanitary ware, spare parts:

    1. Hardware materials are worth a penny, and they are too economical here, and they will spend a lot after rework in the future.

    2. The deodorant floor drain should be selected to deodorize and prevent moth, although the odor-proof floor drain is a gadget and the cost is not high, but the assembly is very inconvenient, so it is better to choose the best to prevent rework.

    3. The structural adhesive should be selected, and the fake and shoddy structural adhesive will be blackened, mildew, and look sticky after a long time.

    4. Remember to consider the specifications and models of the toilet, especially the holes, you don't have to buy it back and find that it can't be installed, but there is a hidden danger of blockage.

    5. The pavement in the shower area should be sloped, and the lowest value is biased towards the floor drain, so that the drainage is fast.

    6. The large double slots in the dining room kitchen are better to use, and the small and medium-sized slots in the double slots are dispensable, occupying the indoor space in vain.

    Power Circuit Routing:

    1. In areas where the electric pipe and the water pipe are crossed, the water pipe is under the electric pipe and the upper pipe is on the top.

    2. It is advisable to wear 3 4 wires in a wire pipe, and the cross-section of the cable accounts for one-third of the cross-section of the wire pipe, so that the pipe is not easy to be over-congested, and the cable is stronger to drive, which is also conducive to heat dissipation.

    3. Before the socket switch is accurately positioned, it is necessary to think about the reasonable layout of furniture and household appliances, and it is not necessary to install the power switch on the door, and it is also necessary to prevent the power socket from being blocked by furniture.

    4. The power socket in the restaurant kitchen should be equipped with a power switch, and the socket row in the bathroom should be equipped with a socket waterproof box cover, so that it is convenient and safe.

    5. Remember to install a check valve for kitchen smoke exhaust, otherwise the next-door neighbor's cooking kitchen fumes will drift to your home.

    6. The position of the air conditioner should be well designed, do not blow at the head, and the air conditioning hole should be obliquely outward to avoid the backflow of condensate.

  2. Anonymous users2024-02-11

    **。Hydropower renovation is the largest hidden project, and it is also the most expensive of the additional items. So be sure to ask the renovation company to indicate the content of the consumables.

    Hydropower in the same tank or under water and electricity. Hydropower in the same tank is to bury water pipes, wires or cold and hot water pipes in the same pipe tank, which will affect future use and even have serious safety hazards, such as leakage. Dosage.

    Hydropower renovation accidentally exceeds the budget, and sometimes it may be that the amount of materials used exceeds the standard. Therefore, before the hydropower transformation, the decoration company should be asked to measure the number of meters required for the hydropower renovation on site and observe how the line is going when they measure. Waterproof check.

    Soon after moving in, you will find that there are water stains on the walls, and some even have paint peeling, which is mostly caused by leaking water pipes buried in the walls.

  3. Anonymous users2024-02-10

    Hydropower renovation, floor laying, cabinet installation, furniture installation, ceiling installation, these are relatively expensive projects. When decorating, it must be inspected next to it, and it must be supervised, so that you can pay better attention to being pitted.

  4. Anonymous users2024-02-09

    Wall treatment, painting, water and electricity renovation, floor heating, floor laying, these are relatively hidden projects. It should be noted that supervision must be carried out on site during the renovation, so as to prevent problems.

  5. Anonymous users2024-02-08

    It should be some unnecessary storage cabinets. There is also a mosaic of the TV background wall. It's all unnecessary and very costly.

Related questions
13 answers2024-07-03

Decoration and renovation of hydropower, we must pay attention to the quality and economy of the selection of materials, blindly pursue the highest is the highest quality, and workers must be practical when transforming, some places do not need circuits, transformation workers in order to make more money but invisibly increase a lot of places, so that it will be pitted and spend more money.

13 answers2024-07-03

Buying something and being cheated by acquaintances is definitely not a good experience. The reason why I chose to buy something from him is that I think I am an acquaintance, believe him, at least I will not be cheated, and I can get it without having to bargain too much. Whoever buys is not buying, and will naturally support acquaintances.

21 answers2024-07-03

1. Don't move the non-load-bearing wall easily.

Danger Index: 9 Hit Index: 8 Although the non-load-bearing wall is a secondary load-bearing component of the house, it is also an extremely important support for the load-bearing wall. Whether the non-load-bearing wall can be removed depends on the situation, if the whole building is demolished and modified at will, the seismic resistance of the building will be greatly reduced. >>>More

24 answers2024-07-03

floors, chandeliers, etc. Generally, the floor is spread on the ground to look good, so pick some discounts. Generally, chandeliers are illuminated and do not need to be too expensive.

2 answers2024-07-03

This question cannot be directly said to be reliable or unreliable, each training institution has its own advantages, but also has its own shortcomings. >>>More