How to do water and electricity lines for new house decoration

Updated on home 2024-07-05
11 answers
  1. Anonymous users2024-02-12

    Do the math how much it will cost you to renovate your home

    1. Layout.

    Hydropower lines should be decorated according to the spatial layout, different regional functions are different, and the laying requirements for the lines are also different, which should be subject to the actual indoor situation, especially the kitchen and bathroom, and the lines should be more reasonable to facilitate future use.

    2. Living habits and preferences.

    The layout of water and electricity should be decided according to the living habits and needs of the owner, such as some users like to install the water heater in the kitchen, and some like to install it in the bathroom. In addition, different types and quantities of electrical appliances should pay attention to practicality when wiring.

    3. Go to the top and walk to the ground.

    When designing the line for hydropower, try to go to the top or the ground, but try not to design too many lines on the ground, because the ground needs to lay tiles or wooden floors in the later stage, once the line has problems, it is troublesome to repair and rectify, and the cost is high.

    4. Horizontal and vertical.

    When laying the circuit waterway, it is necessary to pay attention to horizontal and vertical, choose short-distance wiring, and do not go around the east and west, otherwise the waste of materials is not to mention, the water pipe is bent too much, and it will cause damage and leakage.

    When hydropower transformation, pay attention to the same room, switch and socket should be set on the same horizontal line, the switch is about a meter from the ground, and the socket is about 30 cm from the ground. In addition, the load-bearing wall can not be grooved, and if you really want to route the line, you need to use a yellow wax tube, which is light and thin, and only needs to be buried in the cement layer of the load-bearing wall. Moreover, the wall slotting should be thrown vertically, and try not to throw it horizontally, otherwise it will damage the strength of the wall.

    Enter the area and get the decoration for free**].

  2. Anonymous users2024-02-11

    It is better to decorate the house with water and electricity according to the horizontal and vertical lines.

    1. Horizontal and vertical. For hydropower wiring, basically the horizontal and vertical wiring method will be adopted, which can not only make the line aesthetically pleasing, but also have little impact on other construction work.

    2. Dotted line. For the staff who are more knowledgeable about electricity, this kind of wiring can save some costs, but it is characterized by more messy and has a greater impact on future maintenance.

    3. Hydropower walks the wall. In addition to the ground and two points, there is also a way to walk the wall, this way of wiring is less difficult, although the later maintenance is easier, but the difficulty of the early slotting work is not easy.

    Hydropower wiring is a problem that needs special attention to decoration, once you do not choose a good wiring method, then it will not only consume financial resources, but also be more troublesome to maintain in the future.

    The villa master provides you with local building policies, building drawings, and villa design drawings;

    Villa appearance renderings service, thousands of popular drawings for you to choose.

    Villa Master.

  3. Anonymous users2024-02-10

    The renovation of water and electricity in the new house is not only the first basic renovation project, but also the top priority of the whole project. Hydropower renovation as a hidden project in the renovation.

    Some issues are also often "hidden". First of all, do a good job of hydropower positioning. Secondly, discuss the specific direction of the water circuit and the location of switches, sockets, and interfaces.

    Finally, check the quality. Hydropower renovation is a concealed project, once the hydropower acceptance is over, after the wall is painted and tiled, it is inconvenient to repair the engineering problems. Therefore, in the transformation of hydropower, we should not only pay attention to the quality of construction, but also carefully select materials.

    Waterway Renovation Tips:

  4. Anonymous users2024-02-09

    Hello, Xiao Tian'er will answer!

    Hydropower materials

    The water circuit is a hidden project in the decoration, so we must consider the details when accepting, and at the same time put forward the requirements for the construction unit to indicate the material brand, model, specifications and other details.

    If you measure the quality of water pipe materials from the pressure resistance level, you should choose pipe materials with water pressure resistance of not less than 5 kg of pressure, and the antibacterial pipes on the market have excellent performance, which can bear pressure while effectively inhibiting the growth of bacteria in the pipe and ensuring the safety of water quality.

    The circuit is divided into two parts: internal wire and external electric tube, the cross-cutting area of the wire is different, the current carrying capacity is different, and the power range of the electrical appliance that can be carried is also different. At present, PVC conduit is mostly used to protect the internal wires, and we can judge the flexibility of the conduit by bending the conduit to see if there is any cracking.

    Slotted laying standard

    Before slotting construction, we must first confirm the high-power electrical appliances, wire diameter and electrical box configuration at home, common wires range from 1 square line to 10 square lines (1 square line refers to the wire with a cross-sectional area of 1 square millimeter), generally speaking, the entrance line needs to be more than 6 square lines, indoor sockets, lamps and lanterns are above the square line, and the kitchen and bathroom space is more than 4 square lines.

    After the inspection was completed and the ground at the top of the wall was removed, the construction team began to locate the construction datum elastic line and mark the position of the water pipe wires. When the circuit is transformed, follow the principle of horizontal and vertical, and lay along the surrounding transformation, which can facilitate later maintenance, avoid the chaos of the circuit pipeline, and cause damage to the items installed on the ground or wall in the later stage.

    When laying the waterway, make sure that the waterway is under the circuit and cannot be in the same tank. In addition, the wall can not open the horizontal groove to lay the pipe, which will destroy the cement load-bearing and produce the phenomenon of cement falling and falling off.

    If you still have questions about decoration, environmental protection, home decoration pollution, home design and layout, etc., you can consult Litian, and all decoration problems can be answered for you!

  5. Anonymous users2024-02-08

    1. The water pipe of the kitchen and bathroom should go from the top of the head, once the water leakage can be found in time, and it is easy to repair.

    2. The junction of strong and weak current should be wrapped with tin foil to avoid interference with weak current.

    3. The wire groove on the wall must be more than 3 cm, whether it is from the wall or from the ground, each pipe must be fixed with a pipe clamp.

    4. The pipeline should be fixed, on the one hand, because the pipeline will become soft when hot water is applied, and on the other hand, it is also for shock protection. Toilet water pipes are usually routed to the wall, which can save costs.

    5. Check whether the position of the switch is consistent with the drawing, the height of the switch from the ground should be 1 3 meters, and the kitchen and bathroom must use waterproof sockets.

    6 Each keel should be leveled, you can use a spirit level to put on the keel to measure, if the wooden strip and each keel are in close contact, it means that the situation is better.

    7. For the safety of later construction, the wire end in the cassette must be sealed with adhesive tape, and a length of 10 to 15 cm of wire must be reserved, which is for the need for wiring.

  6. Anonymous users2024-02-07

    1.Plan ahead.

    Before laying the water circuit, be sure to ask the hydropower engineer to design and draw a water circuit diagram, mark where to put more large appliances, where to install sockets, basins, toilets, showers and other things. If you don't plan in advance, it will be troublesome to install and change at the same time, which will not only waste money but also waste time, so be sure to plan well in advance and confirm with the engineer that there is no problem before starting to lay hydropower. And the water pipe circuit is a hidden project must be done well, can think of all the problems as much as possible, when the decoration is completed to think of the modification is very troublesome, will re-dig a hole to change, very waste of money.

    2.Water pipe slotting.

    Whether it is water or electricity, it needs to be slotted, and the slotting must be vertical or horizontal, because the pipes used for laying are straight. The pipes that need to be laid in parallel need to be uniformly controlled at a height of 60cm-90cm, and the pipes with faucets must be vertical, and there need to be two kinds of pipes, hot and cold, and the interval between the two needs to be 15cm to prevent mutual influence. The depth should be controlled at 4cm.

    It should be noted that if the wire pipe is more than 15 meters, or there are multiple curves, it is necessary to add a wire box. After the trunking is completed, it is also necessary to ask the construction personnel to mark the size of the slotted pipes before starting to decorate the others. The construction crew should mark the size and direction of the slotted pipe.

    3.Hydropower acceptance.

    After the water and electricity decoration must be accepted and checked, to see if the socket panel of the house is energized, you need to carry out the power off test, the way is to see whether the door is completely powered off after the gate, it is best to install the main electric switch in the house, although sometimes not beautiful, but it can also save a lot of trouble.

    The above is the decoration design, what are the skills of water and electricity construction of the house. Only after mastering these skills, can the construction work be done in place, and it is still very comprehensive.

  7. Anonymous users2024-02-06

    First, how to go about the water and electricity for the decoration of the new house.

    Hydropower can go to the top or to the ground. It is more convenient to maintain the water and electricity roof, for example, if there is a leak in the water pipe, we can not only find it in time, but also the maintenance cost will be lower; However, hydropower requires more materials to go to the top, and its construction is more difficult, and the installation cost will be relatively higher. The installation cost of hydropower is relatively low, and its construction period is relatively shorter; However, its later maintenance cost is high and the maintenance difficulty is relatively large.

    Second, what should be paid attention to in hydropower transformation.

    1. When the water and electricity at home are disturbed, we must inspect the materials of the hydropower. Hydropower renovation is a concealed project, if the quality of the materials used is not good, it is prone to aging and damage and other failures, and it is relatively troublesome to repair in the future. Therefore, we must check the quality of the water pipes and wires before installation, whether their brand specifications meet the design and construction requirements, and so on.

    2. When hydropower transformation, we should pay attention to whether the construction personnel are in accordance with the standard, for example, the construction personnel can not make grooves on the load-bearing wall, especially the horizontal grooves. When we install water and electricity, we need to keep a certain distance between strong and weak electricity or hot and cold water pipes. Whether the position of the faucet and switch socket is installed correctly, whether the installation height meets the standard, etc.

    3. After the completion of the hydropower transformation, we must carry out the acceptance of the hydropower to slow down the disadvantages. For example, check whether the fire zero ground wire of the switch socket is installed correctly, whether the number of sockets will be too small, whether the wire has a sleeve, and whether the wire circuit is set reasonably. After the waterway is installed, we have to carry out a pressure test to check whether there will be water leakage faults and so on.

    After the acceptance of the hydropower transformation, we must also keep the hydropower transformation drawings.

  8. Anonymous users2024-02-05

    The happiest thing after buying a house is to decorate it, and to groove it in time so as not to affect the later construction effect. The thickness must be done well, otherwise it will be very prominent on the wall, and the water pipe should be put in to test it first to see if the electricity is working. When repairing electricity, the main switch should be unplugged, otherwise it will easily lead to electric shock.

    There are many electrical appliances used in the home, and there must be independent wiring in the area. If there is a possibility of combustion, it is necessary to separate the circuits in the home for the sake of safety. Although decoration is a headache, if water and electricity are not done well, this important link will be related to the safety and quality of life in the future.

    No one wants to repair the house after living for a period of time, which is also very troublesome, so when getting it, it is necessary to strictly control the main line and strong electricity to these areas, so that the construction workers know what to do. Don't get a house easily, otherwise it will be very troublesome in the later stage. All the walls should be made straight and vertical, so that it is easy to put tiles and wires.

    If the line is not done well, it will be very difficult to repair it in the later stage. <>

    Some of the places where the wires are handed over should be treated with interference, otherwise it is easy to appear the phenomenon of string circuits. The amount of electricity used in each place is different, and the switch must be protected, and there can be several more switches at home. The spacing in the middle must reach more than 30 cm, and there should be no other interference, otherwise it is easy to catch fire if it is used improperly.

    Wires should not only interfere, but also not be greedy for cheap when buying things, but also buy some good ones. Some people will directly contract all the work to the contractor, but if this treatment is not done, it is easy to cause the wires to break down. The functionality of the socket must be good, only in this way that it does not hinder movement.

    It is very convenient to use with interference, and there will be no leakage no matter how you use it. <>

  9. Anonymous users2024-02-04

    First, determine the location of furniture and appliances. First of all, it is necessary to confirm the detailed specifications and dimensions of indoor furniture and household appliances and the installation location. Second, determine the location of sockets and waterways to determine the number of sockets you need at home and the daily use needs of water and electricity

    The number of switching lighting equipment, sockets, electrical appliances. Third, the modeling of the circuit. For the chandelier lamp position, think about the lamp layout (the circuit position of the small spotlight) and the control mode (single control or double control) hot water heating mode.

    Fourth, to determine the hot water heating method of the family, here is a reminder: large households should take into account the hot water circulation system. Fifth, to determine whether to install waterway equipment and waterway treatment equipment such as water purification and soft water, and whether to add heat recovery equipment to the place where the pipeline is long.

  10. Anonymous users2024-02-03

    When decorating, we must carry out water and electricity renovation, clarify some of our plans and the placement of electrical appliances, leave sufficient sockets in the corresponding position to use household appliances, and make all the lines neat and clear, do not go to the disorganized wiring, change the water, and do a good job of waterproof and moisture-proof measures.

  11. Anonymous users2024-02-02

    According to the use habits and decoration style of the home, the necessary water outlets and sockets should be set aside, and a professional team should be found to carry out the construction, which can make the home safer.

Related questions
10 answers2024-07-05

If you simply use electricity, you can use this tube. The usage is as follows: pull the wire, and then let a person look at the other side, if the wire moves, it means that this one is through, you can tie the wire and the wire and then pull the wire at the other end to lead the wire out. >>>More

7 answers2024-07-05

Generally speaking, it is done in a horizontal and vertical or two-point and one-line manner, and a lock needs to be added between the wire pipe and the wire box. In addition, the distance between strong and weak electricity must be controlled at more than 50 centimeters to avoid interference. For water pipes, cold water pipes and hot water pipes should not be located in the same trench, and the distance between them should be controlled to 10 to 15 cm. >>>More

10 answers2024-07-05

Steps to clean a new house:

1. Clean the bathroom first, because this place may be the first thing you need when cleaning the room; Then clean the kitchen, because it is a "big water user", so it is better to clean it first, and this is related to health, so it must be thoroughly cleaned, 360 degrees without dead ends. >>>More

22 answers2024-07-05

Everyone is full of expectations when decorating their new home, hoping to decorate it beautifully and warmly, because it will be a small family to live in for a long time in the future, so they will also pay extra attention to the decoration process. However, in the past, there may be a problem, that is, when renovating water and electricity, various pipes will be installed directly on the wall or floor. >>>More

3 answers2024-07-05

CCC certification mark.

There must be CCC certification mark on the wire, wire and cable products are national compulsory safety certification products, all manufacturers must obtain the "CCC" certification certified by the China Electrical Products Certification Committee, obtain the "CCC" certification mark, and have the "CCC" certification mark on the certificate or product. The wire is related to the safety of electricity, and the bad wire will affect the safety of our life and property, so we must choose the wire product with the CCC certification mark. >>>More