-
It can be used, and it is more space-saving.
After measuring the length of the pipe, it can be cut with a hacksaw, manual saw, or grinding wheel cutter. After sawing, the section should be kept flat, and the burrs should be removed and chamfered with a steel file.
Fine grinding of cement clinker is usually carried out using a coil-flow grinding process (i.e. closed-circuit operating system). In order to prevent dust from flying in production, cement plants are equipped with dust collection equipment. Electrostatic precipitators, bag collectors and cyclone dust collectors are commonly used dust collection equipment in cement plants.
-
Generally, there is no problem, and the heat expansion rate of the pipe cannot rise to the point that the cement cannot withstand it.
Wrap the sewer pipe directly with cement and then paste tiles on it to save space.
Advantages: This is equivalent to wrapping the pipe with sand mixture, the pipe will be well protected, and at the same time, it will also help to save space.
Disadvantages: It is almost impossible to peel the pipe out of the sand when the pipe wrapped in the sand mix is leaking or the inspection opening on the pipe needs to be opened. Thermal expansion and contraction, the pipe bursts, and cannot be repaired. Therefore, this problem is still for the owners to consider themselves.
The thermal expansion rate refers to the relative percentage of the change in the volume of the sample before and after heat treatment, and is suitable for solid samples with small expansion properties. Its essence is the same as the expansion multiple, but the way it is expressed is different.
Thermal expansion rate = (volume after heating - volume before heating) volume before heating * 100%.
-
Summary. Kiss, <>
We're glad to answer your questions! The straight pipe of the bathroom can be directly wrapped with cement: under normal circumstances, the straight pipe of the bathroom can be directly wrapped with cement.
Because pipes like this belong to the drainage riser of the bathroom. But be careful when constructing. Don't plug the mouth or leak inside.
Also, don't deform or crush the tube. You just need to seal his mouth with concrete to prevent water leakage, and other users will not be affected. The extension package will be more beautiful, and the straight pipe of the bathroom can be directly wrapped in cement.
Because pipes like this belong to the drainage riser of the bathroom. You just need to seal his mouth with concrete to prevent water leakage, and other users will not be affected. Glue your favorite tiles on the outside of the cement, which is both beautiful and hygienic.
Hope mine can help you! <>
Can the bathroom straight pipe be wrapped directly with cement?
Can the bathroom straight pipe be wrapped directly with cement?
Kiss, <>
We're glad to answer your questions! The straight pipe of the toilet can be directly wrapped with cement: under normal circumstances, the straight pipe of the toilet can be directly wrapped with mud.
Because pipes like this belong to the drainage riser of the bathroom. But Lao Qiao is to be careful when constructing. Don't plug the mouth or leak inside.
Also, don't deform or crush the tube. You only need to seal his mouth with concrete to prevent the water from leaking, and it will not be affected by other users. The extension package will be more beautiful, and the straight pipe of the bathroom can be directly wrapped in cement.
Because pipes like this belong to the drainage riser of the bathroom. You just need to seal his mouth with concrete to prevent water leakage, and other users will not be affected. Glue your favorite tiles on the outside of the cement, which is both beautiful and hygienic.
Hope mine can help you! <>
Can the straight pipe of the room be wrapped directly with cement?
To decorate the water pipes in the house, can you directly wrap them with cement?
Kiss Yes.
Won't the pipes be damaged?
Kiss won't.
-
Summary. Hello dear, here is to inquire about the water pipe can not be poured with cement, because the material of the drainage pipe is normal PVC material, it can not be wrapped in cement, cement thermal expansion and contraction will make the water pipe rupture, the owner can use the brick method, light steel keel with cement pressure plate method, buckle plate method and so on to wrap the water pipe.
Hello dear, here for you to inquire about the water pipe can not be poured with cement, because the material of the drainage pipe is normal PVC material, it can not be beamed with hail to wrap the rubber sail with cement, cement thermal expansion and contraction will make the water pipe rupture, the owner can use the brick method, light steel keel hole and with the cement pressure plate method, buckle plate method and so on to wrap the water pipe.
We can often see galvanized steel pipes in our daily life, which is widely used in various fields, but the use of the rock is long and the jujube will rust, which will lead to high metal content in the water, and it will also affect the health of the Lushen people, so many countries and places have banned the use of it.
Copper pipe has been used for a long time, **expensive, but due to good durability, convenient construction has also been welcomed by people, most of the imported and products in the copper pipe is the first choice, but the use of the wild is not much, it is still limited by the nature of the first and corrosion resistance.
The stainless steel drainage pipe is very durable, and the slag material that needs to be used to manufacture is more expensive, such as the price of the loose notice is not cheap, and the stainless steel drainage pipe has strict requirements for the construction process, because its material is very hard, and it is very troublesome to process it on the spot, so most of the decoration process will not choose him.
-
Everyone should know what is cement board? Cement board is a building material used in the construction field, so do you know what is cement board guarantee? The cement board is packed with some pipes on the surface of the cement board, mainly to protect the cement board house, and the cement board is damp in the process of use.
Cement board guarantee is also a more common home decoration method, mainly to package the sewer pipe with some three-dimensional packaging, which is generally used in the bathroom and kitchen These are more humid places. Let's take a look at the construction method of cement slab guarantee.
First, the construction method of the package riser.
1. Brickwork. It is constructed by masons, and before the bricks are pasted, the riser is built with red bricks and wrapped. Features are:
Good sound insulation, strong firmness, not easy to deform, and not easy to blow up after pasting the magnetic sheet. Disadvantages: Relatively thick, takes up space.
Nowadays, the most commonly used process in decoration companies.
2. Wooden keel plus cement pressure plate.
The most previous construction method, the construction is the simplest and trouble-free. Disadvantages: The wooden keel is easy to absorb water, mold, and cause deformation in the humid environment of the bathroom, which makes the magnetic sheet blow up.
Remedy: After installation, make waterproof on the root of the riser before pasting the magnetic sheet to prevent the water from the ground from flowing into the riser and soaking into the wooden keel.
3. Light steel keel and cement pressure plate to tremble.
Informal method: only three roller bridge light rigid keels and two cement pressure plates are used. The light rigid keel is not made into a frame, but plays a connecting role. It's not strong enough. But save labor and materials.
Formal method: use a light rigid keel to make a pure fail-ready frame, after the acceptance of Party A's supervision, then seal the cement pressure plate, hang the steel wire mesh, and finally paste the magnetic sheet.
Features: Not easy to deform.
Made of plastic gusset and plastic aluminum plate.
These two methods are suitable for home decoration and want to wrap the riser. Because there is no need to fill the magnetic sheet, it is very convenient.
Plastic gusset: wooden keel plus yang angle line, directly install the gusset from the bottom to the top. Cons: Not aesthetically pleasing.
Aluminum-plastic panel: nail the nine-centimeter board on the wooden keel, and then glue the aluminum-plastic panel with universal glue, with a variety of colors, close to the effect of magnetic sheets. Disadvantages: The corners of the aluminum-plastic panel are easy to crack, so thicker plates should be used.
2. Cement board.
As the name suggests, cement board is a kind of building slab processed and produced with cement as the main raw material, which is a kind of building product between gypsum board and stone, which can be freely cut, drilled and carved, and has become a widely used building material in the construction industry with its superior to gypsum board and wood board fire prevention, waterproof, anti-corrosion, insect proof, sound insulation performance and far lower than that of stone. Cement slabs are available in prefabricated and cast-in-place.
The engine can be said to be a highly sophisticated mechanical part, and there are gaskets, sealing rings, etc. between each assembly, and even the oil cannot flow out of the instrument, is it possible for water to penetrate into it? >>>More
Rock slabs. Can you stick it directly to the cement wall? >>>More
Orchids are easy to raise, when maintaining cherry lead orchids, do not change its growth environment at will, natural maintenance is very easy, even like weeds with tenacious vitality, generally provide sufficient light, appropriate amount of watering and fertilization, it can grow robustly, raise orchids at home is good, this flower flowers are elegant, fragrant, very ornamental, can play a role in decorating the room. >>>More
Remember, you can't just use water! This can make it harder to remove makeup completely. Let me tell you about how to remove makeup to be clean! >>>More
Roof leaks and it's as simple as plugging them with just cement. Even a very skilled professional waterproof plugging master can't completely plug the leakage point on the roof with only cement. >>>More