Build a three-story office building, as for which company has a shorter construction period, in fact, everyone's construction cycle is similar, are almost the same time, mainly the material and the speed of the construction progress, generally speaking, in the three-story office building such a construction content, basically all the decoration companies.
The cycle of their construction is the same, because the foundation and building construction must follow certain rules to complete, otherwise it will be a tofu slag project, which is dangerous.
-
The construction period of building a three-story office building will not be too long, and under normal circumstances, the construction period of 6-7 months can definitely be completed, and you can find a qualified company whose reputation and quality can be guaranteed.
-
If you want to build a three-story office building, then you'd better find those bureaus of China Construction, and the Eighth Bureau of China Construction is also very good, and the cycle will not be very long.
-
If you want to build an office building, it is three floors, you find a reliable construction unit, if the funds are in place, their construction period is very short, you just need to sign a contract with him.
-
The construction of a three-storey office building is usually completed in about 6 months, and we can find a local private enterprise to build it.
-
Delivery time The construction period is basically determined by the contractor according to the design difficulty, construction cost, etc.
-
You can observe more in your local construction company, be sure to choose a strong construction company, you also need to pay more attention when signing the contract, you need to review the contract before signing, generally speaking, it can be completed according to the promised construction period.
-
You need to build a three-story office, you want to know the length of the company's construction period, that can be determined with the construction unit, generally a three-story building will take less than three months.
-
In fact, the management of construction projects should be considered from the quality, investment and progress, and I think the more reasonable construction period should be: the foundation and foundation engineering take three months, the main project is about 10 days per floor, which is more reasonable, about 6 months, and the decoration project also takes about 6 months, that is, it takes 15 months of effective construction period. The actual construction period is longer than that, and it is necessary to consider the winter shutdown, because the winter construction will increase the cost.
-
I think that if you want to build a three-story office building, you must find a reliable state-owned construction team or construction company, such as our national construction company.
-
As long as the money is in place, even a private contracting team will finish it for you quickly, and the construction of those companies is relatively ink, and if the money is not in place, the project will be dragged for you infinitely.
-
It depends on your own square, generally under normal circumstances, the construction period of the small square is small, and the corresponding time of the large construction period will slowly become improved.
-
This needs to be decided whether you build it temporarily, or in some other way, if you use it for a long time and years, it is not particularly long, and now you can use the simple version to build directly The cycle is very short, and it only takes about two weeks to build.
-
First consider what the building is. Commercial houses, administrative buildings, business hotels, etc., the different structures directly lead to the length of the construction period. Count the easiest way to do it:
How many man-days from the start of foundation lofting to the pouring of the cushion. How many man-days are completed on the foundation, how many man-days are on each floor, and how many man-days are on the top. The interior walls can be done at intervals of floors.
-
You can choose those large construction companies, sooner or later will give you time to panic, in the morning in the time you need, to give you the most satisfactory answer, the completed office building is also very satisfactory to you.
-
If you want to know the length of the construction period, you can only give you an accurate answer after the construction team comes in to see it, so let's find a good decoration team first!
-
The construction period of a new office building is not to say that the construction period of any company is short, but the stability of the foundation of the building and other related matters are to have a long-term time, and there is no company that can shorten the construction period at the fastest speed.
-
The first thing to consider when building a building is the quality of the construction rather than the progress of the project. On the premise of ensuring quality, you can find a large domestic or local builder for bidding, and whoever can meet the requirements will choose which.
-
As long as you can open the bidding, you can find a suitable company to carry out the construction, listen to others say that the disease is unreliable, and it is okay to find it yourself.
-
The building on the upper floor of your house is a very small project, and there are many, many such construction teams, and you asked me to do the construction, and it will be completed for you in less than a month.
-
Hello, if your funds are already in place, you can choose a qualified builder to compound your requirements through the form of bidding.
-
According to my experience, it is reasonable to complete the work (that is, from the start of construction to the completion of acceptance) in half a year. Regardless of the duration of the contract. In fact, the most important thing is money, with money, everything is fast, employing people and materials, and working overtime every day.
If it is brick and concrete, it may be a little difficult to have a single floor in one day, and if it is a frame, it can also be a floor in 4 days. It depends on the situation of the basics. You can do it yourself.
-
Depending on the complexity of the project, as well as the design, structural materials, labor, capital and other factors, everything is going well, and it is very fast to start building in about 3 to 5 months.
-
If the project money can keep up, 150 days is enough.
-
With money, everything is fast, employing people and materials, and working overtime every day.
-
Generally, one layer can be done in a week, excluding the foundation.
-
It depends on how big your construction team is! If there are more people, the planning will be faster, and if there are fewer people, it will be slower.
-
Generally, it takes about three years, mainly depending on the scale of the building and the efficiency of the construction.
The houses built in accordance with the plan to form a small community should not only be regarded as having completed the task as long as the houses are built to solve the people's housing problems, but should also be combined with the development of the economy, the improvement of the people's material and cultural living standards, and the integration of public security and environmental protection.
There must be strict requirements for environmental protection, regional greening, beautification, purification, and transportation, and there must be complete community management and complete comprehensive services and other supporting facilities.
According to Article 16 of the Regulations on the Quality Management of Construction Projects, the following conditions shall be met for the completion and acceptance of construction projects:
1) Complete the construction project design and the contents agreed in the contract;
2) Have complete technical files and construction management materials;
3) There is an approach test report of the main building materials, building accessories and equipment used in the project;
4) There are survey, design, construction, engineering supervision and other units signed by the quality of the documents;
5) There is a project warranty signed by the construction unit.
-
The house must have a certificate of quality quality issued by the quality inspection station. According to the relevant regulations, before the house is delivered for use, it must be accepted by the district-level housing quality inspection station, so that the residents can be allowed to live in the house, and the residents themselves must also conduct quality inspections on the houses and solve the problems in a timely manner.
Tianyuan decoration believes that the time error required for Chinese decoration from design to completion is relatively large, first of all, it is necessary to determine your area and design complexity, and whether the materials are mostly customized
The order is as follows: First of all, the owner needs to discuss with the designer to determine the final design plan, which will take about two weeks, because there will definitely be changes in the middle. Finally, it was carried out by the construction team, which took a month.
If you can find an integrated company that can both design and construct, then the time may be even shorter.
-
Look at the size of the community and work efficiency.
The construction community falls on the central axis of the east and west junction of the city center (between Dongfeng Road and Huanshi Road) with a fashionable appearance, the community has a clubhouse is a good place for your leisure and fitness, the Garden Hotel Station of Metro Line 5 is only a 5-minute walk from here, and there are 24-hour convenience stores downstairs, Western restaurants, Korean food, Li Meijian, etc.
District refers to a large area of residential buildings with a relatively independent living environment in a certain area of the city, and at the same time is equipped with a complete set of living service facilities, such as commercial outlets, schools (kindergartens), etc. Municipal residential quarters (neighbourhoods) and residential quarters are generally referred to as residential quarters, which refer to residential areas, garden residences, and residential groups that are mainly residential and equipped with corresponding public facilities and non-residential houses.
Characteristics of the community: diversity of residential forms; uniformity of planning; diversity of community functions; the plurality of property rights; The modern sociality of the community.
-
If you build a community, the most important thing is to see if the developer's money is enough, without considering the money, generally a 25-story house from the beginning of piling to the full delivery, the construction period is about 3 years. Considering that there are sufficient funds, three buildings can be opened at the same time.
If the commercial housing market has been hot and the house is easy to sell, a community can be completed in about 10 years.
The speed of construction depends on money, and without money, it is difficult to do.
-
What you asked is not accurate, how many construction units are used, what kind of construction is used (the 25-storey floor you are talking about, that is the cast-in-place floor), is it the construction work at the same time, or is it the completion of one project and the other project is working on the construction day and night, two shifts or what? These are the main factors that are critical, and the rest is not considered.
It is impossible for a construction unit for such a large project as you said It is estimated that there are at least three or more If it is three construction units Construction at the same time Two shifts at night Structural cast-in-place (commercial concrete) Management resources and human resources Everything is sufficient It will take at least 2 to 3 years The fastest 3 construction units use the most advanced construction, and the wall panels are prefabricated (not brick) It will also take more than 1 year The construction is finally the installation of equipment Not the wall painting.
-
At most, it will take 20 years for a community, in this case, it will take about 30 years.
-
1 I'll tell you all:
1.Implement the construction funds, ** and quantity;
2.Determine the construction scale, construction area, number of floors, and main functions as needed;
3.Submit it to the leaders and relevant departments for discussion to determine the investment, construction plan, main project quantity, construction period and construction management procedures and methods;
4.Select a specific address and location, and decide whether to carry out geological exploration according to the specific situation;
5..apply to the local planning, land and construction departments to perform the approval procedures;
6.The commissioned design and schematic design shall be reviewed and approved by the leader, and the preliminary design and budget estimate shall be reviewed by the relevant departments;
6.Entrust the construction supervision unit and sign the supervision contract;
7.Select or select the construction unit through bidding and sign the construction contract;
8.Handle the relevant commencement procedures;
9..Construction, mainly pay attention to the management and control of project quality, progress, cost and safety;
10.Project acceptance. Completion of final accounts, carry-over of fixed assets.
-
If it is a start-up company, you can consider apartments first, with low total price, short cycle and high returns. These features of the apartment satisfy the favor of businesses with "small money" on hand. Chongqing China Resources Center can buy an apartment in the MixC commercial center with a down payment.
The rent is offset by the monthly payment, and the down payment can wait for the increase in the value of the apartment to increase in value, which is the income method for most self-use and investors.
-
The time required to complete the design documents according to the basic requirements specified in the relevant design depth and design quality standards is called the design cycle. The design cycle is part of the overall construction cycle of an engineering project. According to the relevant construction engineering design regulations, capital construction procedures and relevant regulations and the depth of construction engineering design documents, the design cycle quota is formulated.
The design cycle quota takes into account the forces that are typically required for each design task. For important projects that are technically complex and lack design experience, with the approval of the competent authority, the technical design stage can be added after the preliminary design approval (note, can you open a breakthrough from here to buy time). The design cycle in the technical design phase is specifically agreed upon according to the characteristics of the project.
The design cycle quota is generally divided into three stages: schematic design, preliminary design and construction drawing design, and the cycle of each stage can be adjusted within the control range of the total design cycle.
The short design cycle can easily lead to low quality of construction drawings, which is not beneficial to all parties. If Party A doesn't want to find an excuse to deliberately make things difficult, you should be able to buy more time.
However, in my opinion, 20 days for a high-level of 60,000 square meters, plus the time for reviewing the drawings mentioned by Brother Ren above, it should not be a big problem if there are enough people.
-
Party A's requirement for 20 days to produce drawings is a bit tighter, but since the plan is fully decided, if the 20-day time is really not finished, there are still a few days for you to continue to do it. . . 20 days is not including the time for reviewing drawings, hehe.
-
The design cycle is not specified. Depth requirements and design cycles vary widely from place to place. Depending on the difficulty of the project, it will be better to ask Party A for one to two months.
If you don't take care of the time in the contract, you will be very passive if you can't finish it. Unless your designer has done a lot of the same kind of engineering and is very familiar with it. Otherwise, you have to think about making a lot of changes and filling up a lot of change orders, which is a headache.
Let the outermost layer have x people on each side and the innermost layer has x 2-(y-1) 2=72, (x+y-1)*(x-y+1)=72, considering x and y are positive integers and parity, there are three sets of equations that can be solved, 72=36*2=18*4=12*6, respectively. >>>More
The same school is three rooms and three floors, covering an area of more than 120 square meters, and the main body is about 230,000 together, that is, one square meter of labor and materials is about 640 square meters; And my uncle's house is also three and a half rooms (we are basically like this), and the main body spent about 200,000 yuan together, that is, about 555 yuan per square meter. In the same place, there is only a month difference (July 13 for the same scholar and August 18 for the uncle's house), and the difference is more than 80 square meters per square meter.
Rural construction requires approval before construction, the original approved construction of the first floor, now want to build the second floor, can be approved by the relevant departments of the township, not the Land Bureau, not the village committee. Township ** has a planning and construction department, so it is necessary to apply to the township ** with the procedures and materials when the original first floor was built. >>>More
It is recommended to choose an energy-efficient and stable hot water system, and here we recommend York VRF Hot Water ** Air Conditioner. >>>More
After the house is completed, please start preparing for decoration at the rough stage, remember to [do not paint the wall], so what should you do next? As follows: >>>More