The same school is three rooms and three floors, covering an area of more than 120 square meters, and the main body is about 230,000 together, that is, one square meter of labor and materials is about 640 square meters; And my uncle's house is also three and a half rooms (we are basically like this), and the main body spent about 200,000 yuan together, that is, about 555 yuan per square meter. In the same place, there is only a month difference (July 13 for the same scholar and August 18 for the uncle's house), and the difference is more than 80 square meters per square meter.
-
It takes more than 1 million to build a three-story 140-square-meter self-built house. This is the most basic one**. Because steel or building materials are constantly rising.
-
Ranging from hundreds of thousands to millions. The reason for the large gap mainly depends on the interior decoration, and the price difference between simple and luxury decoration is very large.
-
I think it should cost about 300,000 yuan for ordinary decoration, because after all, your house is big and has three floors, so this is the most basic decoration.
-
It will cost about 200,000 yuan. Because the decoration area is relatively large, the decoration cost will also be very high.
-
The ordinary decoration should be about 100,000, and if you want to decorate, it may be about 150,000
-
Hello dear, the amount of money required to invest in a three-storey self-built house mainly depends on the following factors: 1. The larger the construction area of the three-storey house, the higher the cost is generally required. Generally, a three-storey house of about 150 square meters requires an investment of between 701 million yuan.
Second, there are differences in the use of different building materials in building materials, which affects the total investment. For example, concrete buildings are more economical, while POP glitter cement is more expensive. Third, whether the decoration situation needs to be renovated also affects the funds that need to be invested.
The basic decoration needs about 5,000 10,000 yuan for square meters, and the high-end decoration costs about 10,000 yuan for square meters. Fourth, the area where the housing is located in the residential area also affects the housing price, and the first-tier cities are higher. In summary, the amount of money required to invest in a three-storey self-built house depends on:
1.Housing area: about 150 square meters of three-story houses are generally more than 70 1 million.
2.Building hand or building material: Concrete is relatively economical, POP cement is more expensive.
3.Whether you need to decorate: basic decoration 5k 10k flat, high-end decoration 10k yuan flat.
4.The area where the house is located: the housing price in the first-tier cities is higher by a certain amount.
Because of this, if a concrete building of about 150 square meters is used for basic decoration, in the third and fourth tier cities, the investment is about 700,000 yuan.
-
Summary. How much does it cost to build a 100-square-meter foundation for a rural self-built house, and how much does it cost to build a 3-story main body: A: The foundation is what we often call the foundation, which is calculated, mainly including the cost of slotting, foundation tamping, cushion, brick foundation and ground beam.
And these overall market ** will generally not be less than 220 yuan per square meter. Let me briefly give you an example, as far as slotting is concerned, an excavator is generally used, which generally takes 1200 yuan a day. And other cement, steel bars, bricks, these **are also in**.
In short, the basis alone, 100 * 220 = 22,000 yuan, the total price of 100,000 yuan accounts for 20%.
How much does it cost to build a 100-square-meter foundation of a self-built house in a rural area, and how much does it cost to build a three-story main body?
How much does it cost to build a 100-square-meter foundation for a rural self-built house, and how much does it cost to build a 3-story main body: A: The foundation is what we often call the foundation, which is calculated, mainly including the cost of slotting, foundation tamping, cushion, brick foundation and ground beam. And these overall market ** will generally not be less than 220 yuan per square meter.
I will give you an example, in terms of slotting, the excavator is generally used, and it generally takes 1200 yuan a day. And other cement, steel bars, bricks, these **are also in**. In short, the basis alone, 100 * 220 = 22,000 yuan, the total price of 100,000 yuan accounts for 20%.
Without decoration, you can prepare 200,000 yuan for the three-story main body, and the foundation is still your own.
-
It takes about 1 million to build a three-storey, 3,000-square-meter house. Because: the cost of building a three-story building, because the floor is relatively high, you need to lay a foundation, and the foundation is equivalent to building a one-story building, that is, it is equivalent to the cost of building a four-story building.
The cost of building a floor depends on whether you are contracting to someone else or buying materials yourself and asking someone to build it. If it is the former, it will float at 50,000 yuan, and if it is the latter, the labor cost and material cost will fluctuate between 3-40,000 yuan, which depends on the labor cost of each missing place. Both of these are more susceptible to the influence of the material**.
Building a one-story building is 3-50,000 yuan, so a three-story building plus laying the foundation is 12-200,000 yuan. This is a fee for the embryo room. If the landlord still wants to decorate, the cost of decoration is to paint the interior, and the cost of the exterior wall is at least half of the cost of building the building, and the cost of fine decoration is higher.
-
Summary. **:1. Ordinary rural self-built houses:
Contractor labor and materials** between 200 yuan and 500 yuan square meters. 2. Rural self-built houses with brick and concrete structures: contracted labor and materials** between 1500 yuan and 1800 yuan square meters.
3. Rural self-built houses with frame structure: contracted labor and materials** between 2000 yuan and 2500 yuan square meters. 400 sqm house**:
1. The budget for self-built houses in rural areas is mainly calculated according to local conditions. 2. First of all, the cost of self-built houses to be approved by the township government and the cost of the real estate certificate will be about 3,000 yuan. 3. (It should be noted that the charging standards of each place are different, the situation of the land is different, and whether there are indicators for building houses, etc.).
4. Due to the different conditions in various places and the situation of the land used for building houses, it is difficult to estimate how much money it needs, so you can inquire in the local area according to your actual situation. 5. The cost of the foundation and the foot beam is about 5,000 yuan. 6. Of course, whether the foundation is easy to dig, the local labor cost is different, you can make specific consultations in the local area, if they are all rural, the specifications are almost the same, the difference should not be too big.
**: 1. Ordinary rural self-built houses: contracted labor and materials** between 200 yuan and 500 yuan square meters.
2. Brick-concrete structure rural self-built houses: contracted labor and materials** between 1500 yuan and 1800 yuan per square meter. 3. Frame structure rural self-built houses:
Contractor and material ** between 2000 yuan and 2500 yuan square meters. 400 square meters of house**: 1. The budget for self-built houses in rural areas is mainly calculated according to local conditions.
2. First of all, the cost of self-built houses to be approved by the township government and the cost of the real estate certificate will be about 3,000 yuan. 3. (It should be noted that the charging standards of each place are different, the situation of the land is different, and whether there are indicators for building houses, etc.). 4. Due to the different conditions in various places and the land used for building houses, it is difficult to estimate how much money it needs, so you can rent it locally according to your actual situation.
5. The cost of the foundation and the foot beam is about 5,000 yuan. 6. Of course, whether the foundation is easy to dig, the labor cost of the local first disturbance is different, you can make specific consultations in the local area, if they are all rural, the specifications are almost the same, the difference should not be too big.
How much does it cost to build a 400-square-meter villa in the countryside? The wages of construction workers are different across the country, and the building materials** are also different, so the funds required to build houses must be different in each place. There is also the lack of certainty about the funds needed for renovations.
Like us, the salary of a mason is 250 yuan to 300 yuan a day, and the salary of a tile paving worker is 300 yuan to 400 yuan a day. Building a villa is generally 300 yuan to 400 yuan per square meter. Scattered with a front to build a 400-square-meter villa, we don't have five or six hundred thousand here.
-
Summary. No. The wages for building a house include not only the cost of materials, but also the cost of labor, and the calculation of labor costs needs to take into account various factors such as the working hours and workload of the laborers.
Therefore, the construction cost of a construction site needs to take into account many factors, and cannot be calculated simply by multiplying the area by the unit price. At the same time, the unit price also needs to be considered according to factors such as region, worker skills, and project difficulty.
According to the information you provided, the cost of a rural self-built house is 4 yuan square meters, and the cost of a 150-square-meter house is 150 square meters, 4 yuan square meters, square meters = 600 yuan, therefore, the cost of building a 150-square-meter rural Huai-type self-built house is 600 yuan. Please note that this is only a rough estimate, and the actual cost needs to be calculated in detail on a case-by-case basis.
Is the salary of the first floor of the building floor 150 square meters x4x2?
No. The wages for building a house not only include the cost of materials, but also include the cost of labor, and the calculation of labor cost needs to take into account various factors such as the working hours and workload of laborers. Therefore, the construction cost of a construction site needs to take into account many factors, and cannot be calculated simply by multiplying the area by the unit price.
At the same time, the unit price also needs to be considered according to factors such as region, worker skills, and project difficulty.
C's three-tier structure is the most. The most common development method for the .NET platform. >>>More
Three-storey self-built houses in rural areas do not add structural columns according to the current building materials, cement, sand. >>>More
When decorating their rooms, many people like to lay floors on the floor, and wooden floors are especially popular. Laying wooden floors on the floor of the room can not only make the room look more beautiful and generous, but also have a special atmosphere, which can make the people staying in the room feel very comfortable and natural. Solid wood triple floor is one of the wood floors, as the name suggests, it is a floor made of three layers of solid wood as raw materials, so what are the advantages and disadvantages of solid wood triple flooring? >>>More
The three-layer architecture is as follows: the three-layer architecture is to conform to the idea of "high cohesion, low coupling", and the presentation layer (UI); Business Logic Layer (BLL); Data Access Layer (DAL) is a three-tier architecture. >>>More
After the house is completed, please start preparing for decoration at the rough stage, remember to [do not paint the wall], so what should you do next? As follows: >>>More