What are the procedures for building a house in rural areas? How long does it take to get approved?

Updated on Three rural 2024-07-14
16 answers
  1. Anonymous users2024-02-12

    First of all, to declare rural self-built houses, to meet these conditions, the applicant must be over 18 years old, to build a house to meet the land use planning, to follow the "one household, one house, after meeting the conditions, you can apply to build a house." To build a house in rural areas, you need to apply for a real estate certificate.

    To go through the corresponding formalities to declare, the steps are as follows:

    1. The house builder clearly submits an application for building a house to the village committee;

    2. The village committee shall review and approve, sign and seal, and submit the application to the Township Construction Office;

    3. The staff of the Township Construction Office can apply for housing infrastructure construction if they are allowed to build a house on site;

    4. At the end of the filling in the township construction office, the township responsible leader signs and seals, verifies and permits, and submits it to the county overall planning and construction bureau for review (county administrative service center.

    5. After the audit is completed, the house builder applies for the property right certificate.

    The examination and approval procedures for rural housing construction take about 30 working days. Under normal circumstances, it is only necessary to build a house to meet the overall planning and the materials are prepared in advance (building application.

    Building a house application**, building a house verification form, ID card.

    and household registration book, guarantee letter is mainly to guarantee one household and one house).

    After submitting the declaration, in the absence of specific factors, the relevant departments will handle the land and overall planning review procedures for you as soon as possible, and immediately arrange on-site measurement and approval of rural homesteads.

    If the conditions for declaring a rural homestead are fully met, the rural homestead will be allowed to build a house, and it usually takes about 30 working days to complete the whole process.

    The area of rural houses is standardized, and there are certain differences in the area required in different places, such as Hebei's requirements: in plain areas or mountainous areas where the average cultivated land per person is less than per mu, the area of houses built cannot exceed 200 square meters; The area of houses built on an average of more than one mu of cultivated land per person shall not exceed 233 square meters; On the dam.

    Each part of the area must not exceed 467 square meters.

    1. Beijing requirements: in suburban and suburban villages, the maximum of each rural homestead cannot exceed one mu; The rest of the places cannot exceed acres; Where the rural homestead land divided several decades ago exceeds the later standard norms, each household shall not exceed the mu norm.

    2. Shanxi requirements: in plain areas within the average cultivated land per person, each rural homestead shall not exceed 133 square meters; Pingcheon with an average of more than acres of cultivated land per person.

    Each household in the place shall not exceed 200 square meters; The maximum size of a house built in a mountainous area is 266 square meters.

  2. Anonymous users2024-02-11

    Rural construction permits are required, and it takes two weeks for the approval to be approved, and farmers need to apply to the local collective economic organization.

  3. Anonymous users2024-02-10

    It is necessary to go through the approval of the formalities for building a house, which generally takes a month, which is relatively long, after all, there are many people who will do it.

  4. Anonymous users2024-02-09

    You need to make an application first, and then write a specification. After that, it will be handed over to the township construction**. Wait for them to review it again. It's about a month.

  5. Anonymous users2024-02-08

    To build your own house, with the consent of the competent department, why do you have to sign it from all over the neighbors? Can't a house be built without the neighbors signing? It's so unreasonable......

  6. Anonymous users2024-02-07

    The post-80s farmers don't even have land, and there is no planned homestead for the post-80s farmers, where can the post-80s farmers go to review the homestead?

  7. Anonymous users2024-02-06

    Is it reasonable to restrict rights, which was originally a two-story building, and to restrict you from building two floors if you rebuild it?

  8. Anonymous users2024-02-05

    1. How long does it take to approve rural homesteads?

    The approval time for rural homesteads in China is generally 20 days. As long as the friends who apply for the homestead prepare the relevant information in advance and apply in accordance with the legal procedures, they can generally apply successfully within 20 days, but they must go through the legal procedures.

    2. Information to be provided for homestead approval.

    1. The application of the builder for the use of homestead or land for production and operation;

    2. "Report on the Examination and Approval of Individual Housing Land" or "Report on the Examination and Approval of Rural Villagers' Housing Land";

    3. The village or group has fulfilled the proof materials published by the list;

    4. If it is within the scope of the town planning area, the review opinion or land use planning permit of the urban construction planning department shall be provided;

    5. If it is illegal land use to go through the formalities, the materials for the closure of the illegal land use and the implementation of the case must be attached.

    6. Those who occupy cultivated land must provide proof of payment of cultivated land occupation tax.

    3. Rural homestead application process.

    1. Submit a written application for land use to the villagers' committee; The reason for the application must be truthful.

    2. If the villagers' committee submits the land application to the villagers' committee meeting or the villagers' representative meeting for discussion and approval, the villagers' committee shall sign the opinion and report it to the town for review.

    3. The town will complete the review and on-site survey of the reported materials within 10 working days, fill in the audit opinions according to the facts, and report the relevant materials to the mayor's office for approval.

    4. The District Planning and Land Management Bureau shall complete the review of the application materials within 5 working days; Permits for building land will be issued to those who meet the requirements. If the application conditions are met, an application may be submitted to the village committee, and the village committee shall submit a written application to the department at the next higher level in accordance with the conditions and procedures and the actual situation of the village. 2. Examination and approval department.

    Legal basis: In accordance with the provisions of Article 62 of the Land Management Law of the People's Republic of China, the residential land of rural villagers shall be reviewed by the people of the township (town) and approved by the people at the county level. In accordance with Article 8 of the "Beijing Municipal People's Provisions on Strengthening the Management of Rural Villagers' Housing Land", if a villager builds a house and occupies the original homestead, vacant land or other non-cultivated land in the village, it shall be reviewed by the people of the township (town) and approved by the people of the district or county.

    If it involves the occupation of municipal agricultural land, it shall be approved by the city or *** for the conversion of agricultural land in accordance with national laws.

  9. Anonymous users2024-02-04

    30 working days, 30 working days for the approval procedures for rural housing construction. Under normal circumstances, as long as the site selection of the house conforms to the planning and the materials are prepared (the application for building a house, the application form for building a house, the approval form for building a house, the ID card and household registration booklet, and the letter of commitment are mainly a commitment to one household and one house), after submitting the application, in the absence of special reasons, the relevant departments will be the first to go through the land use and planning approval procedures for Fu Nai for you, and organize the on-site measurement and approval of the homestead in a timely manner, so that the application for the house is fully qualified.

  10. Anonymous users2024-02-03

    The approval procedures for rural housing construction take 30 working days. How rural residents apply for homestead land and house building procedures.

    1. Conditions for Rural Residents to Apply for HomesteadRural residents must meet the following conditions when applying for homestead: 1. Rural residents must be at least 18 years old and meet the conditions for separation; 2. Rural residents must repent, build houses, and conform to the land use plan, the annual land use plan, and the village and town construction plan.

  11. Anonymous users2024-02-02

    Legal analysis: The time limit for approval of rural homesteads is 20 days. Rural villagers building houses shall conform to the overall land use plan of the township (town), and use the original homestead land and vacant land in the village as much as possible.

    The residential land of rural villagers shall be reviewed by the people of the township (town) and approved by the people at the county level;

    Among them, if it involves the occupation of agricultural land, the examination and approval procedures shall be handled in accordance with the provisions of Article 44 of the Land Management Law. Rural villagers who sell or rent their houses and then apply for homestead land are not to be approved.

    Legal basis: Article 62 of the Land Management Law of the People's Republic of China stipulates that a rural villager household can only own one homestead, and the area of the homestead shall not exceed the standards set by provinces, autonomous regions and municipalities directly under the Central Government.

  12. Anonymous users2024-02-01

    Legal analysis: The approval procedures for rural housing construction take 30 working days. How rural residents apply for homestead land and house building procedures.

    1. Conditions for rural residents to apply for homestead land.

    Rural residents applying for homestead land must meet the following conditions:

    1. Rural residents must be at least 18 years old and meet the conditions for family separation;

    2. The construction of houses by rural residents must conform to the overall land use plan, the annual land use plan and the village and town construction plan;

    3. The third is the standard for the construction quota of rural residents, and the area standard for homestead land is: if cultivated land is used, the maximum shall not exceed 120 square meters; For the use of other land, the maximum shall not exceed 140 square meters, and the maximum shall not exceed 160 square meters for the conditional use of wasteland and barren slopes in mountainous areas;

    4. Rural residents must build houses with "one household and one foundation";

    5. If the rural villagers are renting out and selling the original homestead and then applying for the homestead will not be approved;

    6. It is strictly forbidden for non-farmers and other personnel to purchase homesteads in the village.

    Legal basis: Article 262 of the Civil Code Collectively owned land, forests, mountains, grasslands, wastelands, tidal flats, etc., the exercise of ownership rights shall be in accordance with the following provisions:

    1) Where it is owned by a village peasant collective, the village collective economic organization or villagers' committee shall exercise ownership on behalf of the collective in accordance with law;

    2) Where they are owned by two or more peasant collectives in the village, the ownership rights shall be exercised by each collective economic organization or villager group in the village on behalf of the collective in accordance with law;

    3) Where it is owned by a township peasant collective, the township collective economic organization shall exercise ownership on behalf of the collective.

  13. Anonymous users2024-01-31

    We all know that the construction of houses in rural areas now requires the approval procedures for the application of homesteads, and at the same time, the houses must be built in accordance with the scope and area specified in the approval procedures. However, some villagers did not follow the process to build houses for some reasons, so the houses built in this way will also face the consequences of being demolished in the inventory work.

    In the past, building houses in rural areas was much simpler than now, and the application for homesteads was not as complicated and cumbersome as restrictions, and it all depended on the wishes of the villagers themselves, and at most they could say hello to the cadres in the villages, but now it is not possible, the approval process for homesteads is becoming more and more formal, and there are more and more procedures required for building houses, and the management of housing construction problems for residents in rural areas has been strengthened.

    The materials to be submitted to apply for building a house are the "Application Form for Villagers' Residential Construction and Land Use". Photocopy of household register and identity card of adult family member. If the proposed house is adjacent to the adjacent building or involves the rights and interests of others, the consent of the claimant shall be obtained and there shall be a written agreement.

    The above is the general process of applying for housing construction in rural areas and the materials required. Note: The above is only a general process and materials, and you need to refine it in combination with local regulations.

    At the same time, it is also necessary to steadily promote the implementation of the "one household, one house" system, orderly promote the examination and approval of rural homesteads, the registration and issuance of certificates for the confirmation of rural homestead ownership of "housing and land integration", and publicize and guide villagers to build in accordance with the law. Strengthen source control, and implement the principle that all houses built by farmers must be approved, and no construction will be approved if they are not approved.

    The approval and management of rural homestead land for building houses is related to the residential rights and interests of villagers and has a direct impact on rural social stability. The implementation of one-stop service and the strengthening of departmental linkage are of great significance to further rational use of land resources, safeguard the legitimate rights and interests of villagers, and promote the efficient development of housing construction for villagers in the whole region.

  14. Anonymous users2024-01-30

    All the conditions are available, and it will be approved soon, it is estimated that it will take a month, and if it is fast, it will take half a month.

  15. Anonymous users2024-01-29

    Legal analysis: The examination and approval of rural housing construction is as follows: 1. The housing builder submits an application and fills in the application form for building a house; 2. The villagers' committee signs the opinion and affixes the official seal; 3. The town ** conducts a preliminary examination; 4. Zhang Bang publishes the preliminary review opinions and submits them to the county-level authorities for joint approval; 5. The county land and resources bureau collects the building guarantee fee and issues the construction project permit; 6. On-site inspection of the town and the implementation of the whole process of construction; 7. The building household shall apply for completion acceptance and issue the completion acceptance certificate of the building.

    Rural housing construction procedures: 1. The housing construction household shall submit an application and fill in the application and review form for rural individual housing construction; 2. The villagers' committee signs the opinion and affixes the official seal; 3. The town ** conducts the preliminary examination and is responsible for the land transfer work; 4. The town ** village regularly publishes the preliminary review opinions; 5. Report to the county-level authorities for joint examination and approval; 6. The county land and resources bureau collects the housing guarantee fee and issues the rural individual housing construction project permit.

    Legal basis: "Land Management Law" Article 62 Rural villagers shall build houses in accordance with the overall land use plan of the township and the village plan, shall not occupy permanent basic farmland, and shall use the original homestead land and idle land in the village as much as possible. The preparation of township land use plans and village plans shall make overall plans and rational arrangements for homestead land to improve the living environment and conditions of rural villagers.

    The residential land of rural villagers shall be reviewed and approved by the township people; Among them, where the occupation of agricultural land is involved, the examination and approval formalities shall be handled in accordance with the provisions of Article 44 of this Law.

  16. Anonymous users2024-01-28

    The approval procedures for rural housing construction take 30 working days. How rural residents apply for homestead land and house building procedures.

    1. Conditions for rural residents to apply for homestead land.

    Rural residents applying for homestead land must meet the following conditions:

    1. Rural residents must be at least 18 years old and meet the conditions for family separation;

    2. The construction of houses by rural residents must conform to the overall land use plan, the annual land use plan and the village and town construction plan;

    3. The third is the standard for the construction quota of rural residents, and the area standard for homestead land is: if cultivated land is used, the maximum shall not exceed 120 square meters; For the use of other land, the maximum shall not exceed 140 square meters, and the maximum shall not exceed 160 square meters for the conditional use of wasteland and barren slopes in mountainous areas;

    4. Rural residents must build houses with "one household and one foundation";

    5. If the rural villagers are renting out and selling the original homestead and then applying for the homestead will not be approved;

    6. It is strictly forbidden for non-farmers and other personnel to purchase homesteads in the village.

Related questions
8 answers2024-07-14

Procedures are required to build a house: >>>More

6 answers2024-07-14

The procedures for building a house in the countryside are as follows: >>>More

9 answers2024-07-14

Self-built houses need to apply for a building permit before construction can be carried out, as follows: >>>More