1. The construction site should be arranged according to the construction plan, so as to achieve overall planning and reasonable layout, so as to facilitate the smooth entry and exit of construction personnel and construction machinery and equipment, as well as the evacuation of personnel in case of danger.
2. Materials, machinery and tools are placed reasonably and clearly marked.
3. All employees entering the construction site must consciously abide by the rules and regulations, dress neatly, correctly use all kinds of labor protection supplies, and work together to help each other.
4. The operation site should be tidy and tidy, the feet should be clear, and the chisel should be cleaned up at any time after the chisel and heat preservation, and the waste should be poured in the designated place.
5. The on-site construction operation shall be carried out within the scope specified by the owner. If it is necessary to carry out construction operations beyond the defined scope or passages, the owner shall be notified of the requirements as soon as possible, and the construction operation can only be entered after approval.
6. When different professional construction teams are working in the same part, they should coordinate with each other, understand each other and give in to each other, and jointly ensure the timely completion of environmental protection projects.
7. Safe and civilized construction should be carried out in the construction work area. Take care of the facilities and trees and flowers in the construction area, and put an end to on-site pollution and uncivilized construction.
8. Organize on-site environmental inspections regularly to ensure that the on-site environment meets Party A's requirements.
9. Non-construction personnel are prohibited from entering the construction site, and obvious signs and warning signs are set up in dangerous areas. On-site construction personnel, to hold a certificate to work, labor insurance wear complete, critical parts of the construction to have corresponding protective measures, construction pay attention to anti-skid, anti-poison, anti-static, anti-falling and other matters, to prevent the occurrence of all accidents.
10. The project department regularly organizes professionals to conduct a comprehensive inspection of the on-site civilized construction, and gives stoppage and economic penalties to the construction team that has problems, does not listen to commands, violates regulations, uncivilized construction, and has a large impact.
-
The problem is too big. It has risen to the level of a theory.
This is a question you should ask specifically.
First of all, there are several types of management. Worker. Progress. Material. Machine. Wait a minute.
There are also several kinds of controls. Generally, the construction worker controls the technology.
I'd love to answer this question. But I don't know how to answer.
-
Posting, tracking, feedback, improvement;
Pre-shift disclosure, process control, and result detection;
-
1.In the construction process, it is necessary to make careful calculations, reduce the consumption of energy and raw materials, and use materials and labor reasonably.
2.Accurate application for the use of land cavity building materials use time, model specifications and quantity, to ensure that the supply of materials is timely, and no waste of materials.
3.Do a good job in the protection of the construction environment, so that the construction does not disturb the early people, and strictly control the dust construction waste and cause pollution to the environment.
-
Safety first. Regardless of the type of work, safety education must be carried out for workers before construction, and safety must always be put ,.. first place2.
Conscientiously do a good job in the civilized construction of the site. Civilized construction reflects whether a company's construction site management is standardized ,..3.
Reduce material waste. Reducing the waste of materials helps to reduce the cost of the project and improve the profit ,.. of the unit project4.
Do a good job of technical disclosure before the construction of each single project. Doing a good job in the technical disclosure of each individual project will help workers clarify the items.
What is Fixed Assets?
Fixed assets refer to buildings, buildings, machines, machinery, means of transportation and other equipment, appliances and tools related to production and operation that have been used for more than one year. Items that do not belong to the main equipment of production and operation, with a unit value of more than 2,000 yuan and a service life of more than 2 years, shall also be regarded as fixed assets. Fixed assets are the means of labor of an enterprise, and they are also the main assets on which an enterprise relies for production and operation. >>>More
Learn to be a constructor?? Dizzy, this is useless, generally after graduating from school, you will be directly given a construction worker certificate, you don't need to take the test at all, only engineers and above are somewhat useful. As long as there is a unit willing to ask you, you don't have to take the test at all, the company will handle it directly for you, in the process of applying, the unit will not ask you if you have any construction personnel and other documents, because this thing is useless at all. >>>More
The purpose of the management review is to stipulate the specific requirements of the management system review and ensure the suitability, adequacy and effectiveness of the management system, so as to continuously improve the management system and meet the requirements of relevant parties. >>>More
Inspection and acceptance of steel bars: pay attention to the following points: 1. Check the number of steel bars and the diameter of steel bars against the drawings. >>>More
Establish a sound financial internal control system.
1) Financial delegation system: set up a financial branch under the head office, all financial personnel are appointed by the financial branch, not subject to the management of the branch manager, and the branch manager reports to the head office separately, mutual constraints. >>>More