    Decoration masonry projects include paving tiles, waterproof layer treatment, ground leveling treatment, smoothing hydropower construction ditch, in the construction need to pay attention to the indoor running protection measures to be strengthened, in the cement plastering to treat the wall with water wet, for the wall to carry out anti-cracking treatment, after using up the tile, to wipe off the excess cement in the gap with a rag in time, waterproof coating to do a good job.

  2. Anonymous users2024-02-11

    All include waterproofing, waterway, circuit, balcony insulation, floor tile laying; Precautions include to protect the construction site, to place the materials neatly, to soak the floor tiles with water before laying the floor tiles, to clean up the excess cement on the floor in time, and to pay attention to the way of tiling when keeping the balcony warm.

  3. Anonymous users2024-02-10

    Smooth the floor, tile the floor, take the stairs, take care of the walls, etc. First, you should invite a master with better skills, second, you must provide sufficient materials, third, you must put forward your own requirements, fourth, you must supervise, and fifth, consult with the other party.

  4. Anonymous users2024-02-09

    Wall leveling, leveling water and electricity, ground waterproofing and ground leveling, tiling; Be sure to choose a master with good skills, put forward your own requirements, supervise the completion of the other party, negotiate the price with the other party, and provide sufficient materials.

  5. Anonymous users2024-02-08

    <><What are the precautions for mason decoration?

    A must-have for masonry decoration.

    1. Construction site protection of masonry construction.

    Masonry construction can be said to be very important to grasp each link, are careful, only indoor protection measures, we must pay special attention to ,-- carelessness to start anew.

    Second, the construction of masonry tile paving.

    Cleaning: Maintain the hygiene of walls and floors, and clean up contaminants from surfaces frequently. When laying the floor, it is best to have a dust blanket in front of the area to remove grit from the soles of your shoes.

    Hollow drums. In order to prevent the problem of hollowing out of the tiles and affecting the future use, when laying floor tiles, the dry cement mortar layer should be thick enough, generally about 3cm. Purchase:

    Tile purchase is recommended to buy first, counting the loss of tiles - generally need to buy more than 10%, the general business has the principle of "more refund and less compensation", tiles can not be returned after soaking in water, it is best to remind workers how much to use to soak in the posture.

    Third, the construction of mud tile waterproof project.

    The bathroom is waterproof to the top, or at least meters, and the kitchen is waterproof to be one meter high. Do twice when the ground and walls are less than 30 cm from the ground, and once when they are more than 30 cm. The waterproof place of the door sleeve needs to cover the edge of the door, and the yin and yang corners should be made into arc corners.

    To prevent waterproof problems in the future, it is still necessary to conduct a 48-hour closed water experiment.

    Fourth, the acceptance of masonry construction is very important.

    Masons are visible, construction acceptance should be immediate, and rework can be requested immediately if there is a problem. It is recommended that you should strengthen the constraints of the contract, the constraints of material quality, and the construction project should also be monitored.

  6. Anonymous users2024-02-07

    In the process of decoration construction, mason construction is a very important part, there is a lot of work that needs to be done, so what are the precautions for masons in construction? Let's take a look at it.

    Precautions. 1. Construction site protection.

    In the process of masonry decoration construction, we must strictly grasp every link in the project, and the quality of the construction can be seen from the careful protection measures on the construction site.

    Precautions. Second, the placement of materials.

    In the process of masonry decoration construction, due to the variety of materials and frequent use, there are certain requirements for its placement, which is easy to take and not easy to damage.

    Precautions. 3. Accumulation of experience.

    For example, before the cement plastering, the brick wall should be watered thoroughly, which is conducive to the adhesion of cement plastering on the surface of the brick body and prevents the moisture in the cement from being adsorbed by the brick.

    Precautions. Fourth, anti-crack treatment.

    Because the shrinkage ratio of the cloth is relatively small, it is not easy to change when it encounters wet or dry conditions, and it can be better combined with the wall and will not affect the painting effect of the wall.

    Precautions. Fifth, the waterproof layer.

    Another important job of the masons is to construct the waterproof layer of the kitchen and bathroom. In the selection of materials for the waterproof layer, most of them choose cement mortar, and when the masons carry out the construction, the cement slurry is flattened when the base layer is treated, and the waterproof layer is constructed after the closed water test is remembered.

  7. Anonymous users2024-02-06

    Home decoration has reached the stage of masonry and tile, and it has begun to enter the "face-saving project", so to speakMusonry decorationThe quality of the effect affects the overall home decoration effect, so the owner needs to learn more about the mason decoration before construction, so what does the masonry decoration include? Below we will bring you a detailed explanation of the mason decoration project, hoping to provide you with help.

    What does masonry decoration include?

    Musonry decoration project 1, structural transformation: when the owner is not satisfied with the house layout, they will choose structural transformation, through this stupid cluster method to make the house layout to meet their own needs and preferences. For example, some owners feel that the kitchen space is too small, and it will be very inconvenient to cook in the future, so they will use the method of opening up the kitchen partition wall to transform the closed kitchen into an open kitchen, so as to increase the space of the kitchen.

    Structural modifications like this are masonry works.

    Masonry decoration project 2, smoothing hydropower construction ditch: masonry project is the first decoration project after the end of the concealed project, and the trench opened on the ground and wall during the construction of the concealed project should be smoothed at this stage. It is the trench left by the hydropower project in the ground and wall wiring, and the masonry will fill these trenches after the end of the hydropower project, so that the wall and the ground become flat, and the hydropower and other hidden engineering projects are perfectly hidden, providing convenience for the subsequent construction.

    Mushing tile decoration project 3, waterproof layer treatment: now the new house for sale has been built to do a good job of waterproofing the bathroom, but in the process of decoration and construction, the waterproof layer may be damaged, or the owner can not fully trust the developer to do the waterproofing, so the kitchen, toilet, bathroom and other spaces will be redone, which is also the key project of the mason. Because the waterproofing is not done well, it will not only affect the owner's own home, but also affect the owner downstairs, causing neighborhood disputes after moving in.

    At present, many owners omit waterproofing or do not pay attention to the masonry project, resulting in a lot of compensation losses caused by flooding of the lower residents after moving in, so netizens should pay attention to this filial piety.

    Mud tile decoration project 4, ground leveling treatment: ground leveling is a treatment that must be done for laying floors, but there are generally 3 kinds of ground leveling methods, machine grinding and gypsum leveling, cement mortar leveling, and self-leveling leveling. Ground leveling may cause the ground to increase and the renovation budget to increase, so the owner should consider which method to choose from these two aspects.

    Mulay decoration project 5, paving tiles: tile paving is another important project of masonry, the process and precautions of paving will not be repeated, the kitchen and bathroom space is good all paved tiles.

    The above is for you to bring you the mud tile decoration involves, what is included? The full content of the detailed explanation of the masonry decoration project.

  8. Anonymous users2024-02-05

    In the process of home decoration, the masonry project is equivalent to a concept of laying the bottom. If the masonry is done well, the superstructure can be preserved and maintained well. In particular, the owners who do not know about the masonry project need to learn it to help us better present the decoration effect in the later stage.

    Today, I will talk to you about what matters to pay attention to in masonry construction and what are the requirements for masonry construction technology.

    1. What matters should be paid attention to in masonry construction.

    1. Pay attention to the cement material.

    The water digging boy has no mud and cannot be used for more than three months before the factory date. Different varieties and grades of cement cannot be mixed. Yellow sand should be made of river sand, medium coarse sand.

    1:1 cement mortar should be used for pipe sealing, and the cement mortar should be lower than the wall 8-10, so that the subsequent putty can be smoothed. Build walls with 1:

    2. Cement mortar, bricks should be staggered, walls should be vertical, and the surface should be flat. Plastering with 1:1 cement mortar, the base should be fully wet, the thickness of 8-10, the surface should be flat but do not light.

    2. Pay attention to the fact that the tiles should be soaked.

    Whether it is tiling on the wall or floor, it is necessary to soak the tiles in water for a period of time before they are laid. When we buy ceramic tiles, we will pay special attention to its water absorption. Generally speaking, the water absorption rate of wall tiles is higher than that of floor tiles.

    Soaking tiles in advance can make the tiles absorb enough water, and when using cement as an adhesive in the later stage, you don't have to worry about the tiles absorbing the moisture in the cement, which can also avoid hollowing and falling off after the tiles are paved.

    Second, what are the requirements for the construction process of masonry.

    1. Brick watering requirements.

    Clay bricks must be watered and moistened the day before masonry, generally water is soaked into the four sides of the brick, the moisture content is 10%-15%, and the wall shall not be built with dry bricks at room temperature; In the rainy season, brick walls with a saturated moisture content should not be used; Watering in winter is difficult, and the consistency of the mortar must be increased appropriately.

    2. Smearing requirements.

    Be sure to coat it three times, after the wall and ground are dry and clean, coat with a roller and scraper, and complete it layer by layer in accordance with the order of laying the bottom layer - middle layer - surface layer, and the interval between the layers is dry with the previous layer of coating film, and it is not sticky. The coating thickness should be ensured above and uniformly, without local deposition, and the bond between the coating and the base layer should be tight, and there should be no bubbles. After the coating hardens, it should be cured immediately to keep it moist and prevent chalking.

    Care needs to be taken to ensure that the coating is not damaged, and the curing takes 2-3 days.

    The above is the relevant information shared for you about what to pay attention to in masonry construction and what are the requirements for masonry construction technology, I hope it will help you.

  9. Anonymous users2024-02-04

    1. Placement of materials: In the decoration and construction of the house, there should be special requirements for the placement of materials.

    2. Accumulation of experience: Before the cement slips, the brick wall should be moistened with water, which can not only promote the adhesion between the cement glaze and the surface of the brick frame, but also prevent the moisture of the cement from being sucked into the brick frame.

    3. Anti-crack treatment: After the wall is anti-cracking, we can stick cool cloth strips on the gaps.

    4. Clean up the excess cement in time: when tiling, the mason should use a linen cloth to wipe off the excess cement in the gaps of the tiles, and clean the tiles at the same time.

    5. Masonry engineering process monitoring: tiles must be placed horizontally and vertically.

    In the decoration design of the house, the mason must pay attention to the above details in the construction process, and only after paying attention to the above details, can the construction quality be ensured.

  10. Anonymous users2024-02-03

    Tile construction standards: the wall should be smooth, the brick joints should not be the same, and the mortar should be full. Home Improvement Masonry Construction Standards:

    Floor tiles should consider the problem of floor drain in the balcony and bathroom, and should be sloped first, and there should be no water for no special reason in general. Masonry is the first renovation project after concealment works, and the trenches opened in the floor and walls during the construction of concealment works need to be smoothed at this stage. In particular, the trenches left by the ground and wall wiring in the hydropower project need to be filled by masons.

    <> clay tile is the fired clay tile used to build a house in the past, this tile is durable after being fired by fire, and does not deform, does not worry about rust, and has good thermal insulation performance, and can effectively use the gap ventilation, the disadvantage is that it can not withstand the impact of heavy objects and rain and wind is easy to seep, if it is renovated, under the premise that the roof beam is strong, you can use color steel tile, save money and trouble, but the service life is about ten years, and you are afraid that the coal smoke will rot quickly.

    Mud tiles and color steel tiles have their own advantages. In the past, the roofs of the houses in our village were all made of mud tiles, and the roofs made of mud tiles were warm in winter and cool in summer. Later, after many families rebuilt their houses, bungalows were built upstairs, and there was less place to use mud tiles.

    Another advantage of mud tiles is that they are more durable.

    Not easy to deform: the main raw materials of cement tile are cement and quartz powder. The shape of the formed substance is stable and the deformation coefficient is small. Sound and heat insulation, we can see the history of taste for 1,800 years.

    Good with mud tiles! Regardless of the life of the clay tile, the material, and the architectural beauty, it is higher than the color steel tile. And look at the color steel tile iron sheet exposed to the acid mist salt rain, it has been rusty and falling off in a few years, and the rusty yellow dust has gone with the wind!

    Cement tile is relatively troublesome, the insulation layer should be fireproof, if you want to use it for a long time, you must buy a thicker iron sheet, there is also an insulation layer in the middle, and it is more convenient to install a single-layer color steel tile. Thermal insulation layer, the top of the new buildings and bungalows is used as an insulation layer, which is warm in winter and cool in summer.

  11. Anonymous users2024-02-02

    Before construction, it must be inspected, the required materials need to be prepared, and some tools also need to be prepared, and these materials must be prepared in advance to start operation, and the waterway circuit also needs to be communicated, otherwise it is easy to rework.

  12. Anonymous users2024-02-01

    The trenches on the ground and walls need to be smoothed, the waterproofing of general kitchens, bathrooms and other spaces needs to be redone, the ground needs to be leveled, and finally tiles need to be paved.

Related questions
8 answers2024-07-08

1. Civil engineering transformation: according to the plan, the trunking, the bottom box and the wall are demolished. >>>More

21 answers2024-07-08

The classification of automobile specialties is mainly divided into the following categories: 1. Automotive EFI 2, electrician 3, machine repair 4, sheet metal 5, beauty 6, electronics, etc. >>>More

7 answers2024-07-08

We all know that decoration is a very deep knowledge, the development of the decoration industry has risen a lot of decoration methods, now the decoration has the concept of half-package repair or full-package repair, half-package repair is a way between the clear package and the half-package, the construction party is responsible for the construction and the procurement of accessories, the main materials are purchased by the owner. So what are the items included in the home renovation half package budget? Responsible for indoor structure renovation (such as wall demolition or new wall), then Responsible for hydropower renovation construction (water supply and drainage design and installation, circuit design and installation, sanitary ware installation, etc.), Responsible for mud construction (backfilling, ground leveling, waterproof treatment, wall tiles and floor tiles, etc.) Responsible for wood construction (ceiling, modeling production and some on-site production of furniture, etc.) Responsible for paint construction (wall, wallpaper or latex paint, furniture paint, etc.) Some of the above parts may be installed by the seller, such as sanitary ware. >>>More

7 answers2024-07-08

1. Half package is a way between clear package and half package, the construction party is responsible for the construction and the procurement of auxiliary materials, and the main materials are purchased by the owner. Advantages of semi-packaged repair: choose the main part to grasp the initiative, the main building materials to buy by themselves, both in safety and economy are more assured. >>>More

10 answers2024-07-08

1. Hydropower modification: The finely decorated house should carry out comprehensive hydropower modification work, including the installation of floor heating, fresh air system, water purifier, water heater, dishwasher, gas stove, cold and hot water pipes in the bathroom, etc. >>>More