-
You have to understand it very correctly, because the load-bearing wall is the theme structure of the whole building, which is generally made of reinforced concrete as a whole, so it bears the weight of the whole building, and if the load-bearing wall is demolished more and more, then the whole building will crumble until it collapses. But it's not as exaggerated as a second. Give me one.
-
Basically, it can be understood in this way, but in addition to the load-bearing wall, the building also has beams, if it really destroys all the load-bearing walls or the main part, it is okay to hold on for a few seconds or a few minutes in the worst case, even if it is a big **, it can hold on for a few seconds, and it is not easy to collapse in one second.
-
For buildings, load-bearing walls cannot be removed. Of course, the more load-bearing walls are demolished, the faster the house will definitely collapse.
-
That's a great question, the load-bearing wall is the pillar that supports the whole building, and the more you tear it down, the faster it will collapse.
-
That's for sure, the load-bearing wall, as the name suggests, is its main role to bear the building load. The more you lose, the faster it will collapse.
For example, an elephant has four legs, which one falls faster or loses three?!
-
The load-bearing wall is not allowed to be demolished in general, and the demolition has a potential safety hazard to the structure, and the load-bearing wall is demolished more, and the collapse is only a matter of time or time.
-
In principle, the load-bearing walls of a building cannot be removed. After demolition, it will affect the seismic performance and simple frame structure of the building. If demolished, the load-bearing wall is likely to cause the house to collapse.
-
Theoretically, even if only one load-bearing wall of a building is removed, the building is a dangerous building.
-
The load-bearing wall, as the name suggests, is used for load-bearing, and the house is specified to be unstable when you demolish it, so you can use BIM to simulate it.
-
The more load-bearing walls are removed, the faster the building arrives, and in many cases this is the case.
-
The load-bearing wall has been demolished for 9 years or there is a certain danger, the role of the load-bearing wall is to support the weight of the upper floor, although there is no danger between 9 years, it can only represent the owner is lucky, once it encounters ** or other dangerous matters, it will cause irreparable consequences, after the load-bearing wall is dismantled and eliminated casually, it will not only destroy the structure of the entire building, but also the cracks will become larger and larger with time, and the serious situation will lead to the collapse of the floor slab. Causing large-scale security incidents.
In the process of distinguishing between load-bearing and non-load-bearing walls, you can use the following tips:
1. Look at the grade of the house.
Like most of the buildings built before the 90s are brick and concrete structures, this kind of house should not be demolished as much as possible, the support capacity of the wall itself is insufficient, and the risk will increase if it is demolished at will.
2. Look at the material of the wall tiles.
The walls of standard bricks are load-bearing walls, and the brick-laying walls are non-load-bearing walls.
3. Look at the thickness of the wall.
The thickness of the load-bearing wall is generally 24 cm, and the non-load-bearing wall will be thinner than the load-bearing wall, generally about 10 cm, so after measurement, the partition wall below 15 cm is a non-load-bearing wall.
4. Listen to sounds.
-
OK. The load-bearing wall is the stressed structure of the building, and it cannot open the door and renovate it without authorization, otherwise it will affect the overall structural stress, resulting in the imbalance of the entire structural system, and the stability of the whole building will be affected, and the safety factor will be greatly reduced.
Don't try to make changes in private, if discovered, the consequences will be very serious and may affect the safety of you, your family, and your neighbors.
If a solution is desired, unless the design unit of the building is found, the load-bearing factor of the load-bearing wall under a prosthesis is calculated, and whether changes can be made, then the parties can negotiate and make a legal decision. However, the feasibility of this solution is really not very high.
-
Hello, the first ** column and the whole wall as a whole, is a load-bearing column.
The second ** middle column is a small structural column that divides the Hu Shen space, and the small structural column is not integrated with the wall and can be removed as needed.
<>This is my personal opinion, and I hope it can help you.
-
If there are house drawings, the thick black lines are load-bearing walls, and if there are no drawings, the beams are load-bearing walls.
-
Summary. Hello dear <>
Your load-bearing walls have been demolished for 20 years without problems, either because your building is structurally designed or because your load-bearing walls are not fully load-bearing, but only serve as some support. However, we still recommend that you consult with a professional architectural designer and construction team when carrying out any structural renovation to ensure that the remodeled building structure is safe and reliable.
The load-bearing wall has been demolished for 20 years, and it is fine.
Hello dear <>
Your load-bearing wall has been demolished for 20 years without problems, either because your rock-bearing structure is properly designed, or because your load-bearing wall is not fully load-bearing, but only serves as some support. However, we still recommend that you consult with a professional architectural designer and construction team when carrying out any structural renovation to ensure that the reconstructed building structure is safe and reliable.
In addition, the demolition of load-bearing walls also needs to comply with relevant laws, regulations and normative standards, such as "Building Design Code", "Building Structure Design Code", etc. Before the load-bearing wall is dismantled, it is necessary to carry out detailed structural analysis and calculation, determine the structural safety after demolition, and formulate a detailed demolition plan and construction plan. During the demolition process, appropriate support and reinforcement measures need to be taken to ensure that the surrounding walls and structures are not affected.
After the demolition of the Hu Hanhan, it is necessary to carry out the necessary testing and acceptance to ensure the safety and reliability of the demolished building structure. In conclusion, the demolition of load-bearing walls is a very complex and dangerous task that requires a professional design and construction team to operate. If you need to dismantle a load-bearing wall, be sure to choose a formal architectural design and construction unit, and follow the relevant laws, regulations and norms to ensure that the demolished building structure is safe and reliable.
-
Hello probly, it is not recommended that you dismantle. In general, load-bearing walls are an important part of the building structure, and the removal of load-bearing walls may affect the structural stability of the building, resulting in an increased risk of building collapse. Therefore, before the load-bearing wall is removed, a professional structural assessment and reinforcement design are required to ensure the structural stability and reliability of the building after the removal of the chain.
Without professional evaluation and design, the removal of load-bearing walls without permission is a very foolish and dangerous act that can lead to serious consequences.
-
Take you to see the structure of the building under construction, and don't make a mistake when you are careful to complete the decoration, otherwise the consequences will be very serious.
-
Because this demolition behavior has caused the building to become a dangerous building, it is necessary to repair the building as a whole, which will cause damage to other owners. In this case, the other owners can claim financial compensation from the owners who removed the load-bearing walls. The demolition of the load-bearing wall caused the entire building to be unsafe and was an act of endangering public safety.
Through the coordination of the town, the owner of the business concerned paid the transition fee of 4,000 yuan per household for the remaining 35 households in the building. On October 8, after re-coordination, the owner paid a transition fee of 2,000 yuan per household again. The person in charge said that after the incident, he summoned the business owner and then detained him criminally.
Because the business owner also has to deal with the payment of transition fees for other households, he is currently released on bail pending trial.
According to the above-mentioned person in charge, after the matter is handled, in addition to the procuratorate prosecuting the business owner, other owners will also file a civil lawsuit against them to claim compensation, "we will help other owners apply for legal aid."
As far as the owner of the load-bearing wall is concerned, he has the obligation to restore the original state and compensate for the damage. In layman's terms, he wants to rebuild the load-bearing wall according to the requirements and bear the accommodation costs of other owners before the wall is repaired. Criminally, the demolition of the load-bearing wall and the turning of the entire building into a dangerous building are indeed suspected of endangering public safety, and the perpetrator of the crime of endangering public safety in a dangerous way can be controlled negligently.
In summary, the owner is civilly liable for compensation, and criminally suspected of endangering public safety in a dangerous manner. How will it be judged in the end, you can refer to the 18-year Zhang Mouqing case. As a result of the first-instance judgment, the defendant Zhang Mouqing committed the crime of endangering public safety by dangerous means, and was sentenced to one year and six months in prison.
The legal insight is sometimes pale, and the responsibility must be that the perpetrator accounts for the majority, and the renovation company and the property will also have corresponding responsibility, but the question is what if the perpetrator and the renovation company are not able to bear the corresponding responsibility? That may have to be resolved through local negotiation, after all, it is related to the resettlement of many families.
-
The removal of load-bearing walls may affect the safety of the house, which cannot be allowed. If the load-bearing wall is demolished without authorization during the decoration, the property management department and the demolition owner shall bear civil liability. If the demolition causes losses to others, the demolition owner shall bear the tort liability and compensate the loser.
Because the demolition party violated some of the legal provisions of the adjacency; Property management companies must also be held accountable for mismanagement.
In addition, when the owner buys a house, the developer must also give the building a corresponding instruction manual, which must also have clear text and graphic instructions on how to use the house and the definition of load-bearing walls. The owner should strictly abide by the decoration and use, do not cross the thunder pool, otherwise it will cause consequences, not only to compensate for certain losses, but also to restore the original state, but also to destroy the neighborhood relationship, causing tension in the neighborhood, unable to live in harmony with the neighborhood.
What to pay attention to when demolishing and modifying the wall.
1. The beam on the top surface cannot be removed.
Some owners feel that the beams on the roof are unsightly and plan to remove them when they are renovating. As everyone knows, the beam of the roof cannot be dismantled, it is the floor slab that supports the upper floor, once removed, it will cause the floor slab to fall. If you feel that the beam is too ugly to be exposed, you can accompany the mausoleum to hide it from the ceiling.
2. The wall connecting the balcony cannot be dismantled.
Secondly, in order to improve the indoor lighting, some owners will tear down the wall connecting the balcony, but the wall under the window can not be removed, it can mainly provoke the balcony, if it is removed, it will cause the balcony bearing force to be removed, resulting in a fall.
3. The load-bearing wall cannot be dismantled.
Some owners don't know much about load-bearing walls, but in order to change the interior pattern, they will blindly dismantle the load-bearing walls in the interior. In fact, as long as the exterior wall is a load-bearing wall, or the wall shared with the neighbors is a load-bearing wall.
4. The steel bars in the wall reed stove cannot be moved.
The steel bar is equivalent to the bone in the wall, if the steel bar is accidentally damaged when burying the pipeline, it will affect the bearing capacity of the wall, thus leaving hidden dangers.
5. The repair work after the wall is demolished cannot be saved.
The wall was demolished, and the later repair work should not be neglected. When rebuilding the wall, it is necessary to re-stretch the reinforcement, that is, use steel bars to pull the new and old walls to make the wall more stable.
If your house is a floor, brick house, then you look at the walls are quite thick, estimated to be 240 cm or larger than 240 cm, then it is a load-bearing wall. >>>More
Load-bearing walls cannot be removed. The destruction of the load-bearing walls would affect the solid safety of the building. Load-bearing walls are constructed in a position that is specified in the position of support. Whether it can be dismantled should consult the corresponding department.
According to the stress characteristics, the wall can be divided into load-bearing wall and shear wallThe former is mainly used to bear vertical loads, such as masonry walls; The latter is dominated by horizontal loads. In the seismic fortification area, the horizontal load is mainly generated by the horizontal ** action, so the shear wall is sometimes called the seismic wall. >>>More
Not necessarily. It is related to the length and width of the interior and the structural form of the balcony. >>>More
load-bearing walls. It plays a crucial role as it is the main support for supporting the floor slab and building the floor structure. Everyone knows the importance of load-bearing walls, and it is absolutely impossible to remove them in renovation. >>>More