1. When carrying out the above operations, it mainly involves grooving, which is generally the work of stonemasons. But if there is a cutting machine, the plumber can also do it conveniently. When smoothing the trunking, masonry is involved.
Therefore, from the operation process is the cross operation of three types of work, if you are your own decoration rather than the decoration company, then pay attention to coordinate their cross work and cooperate with each other.
2. The wire should be a regular product, and the wire pipe and cassette must be flame retardant. Because it is a concealed project, it must not be sloppy.
3. On the waterway, the water pipe should also be a regular and reliable product. Regardless of the method of takeover, it must be reliable. The pressure test should be carried out in strict accordance with the standard.
-
Step 1: Hydropower acceptance steps and tools.
Acceptance tools are generally prepared by the supervision or construction party, including pressure test pumps, flow wrenches, raw material belts, plugs, jacks, pressure gauges, water tanks, connecting hoses, ammeters, etc., the owner can bring their own tape measure, small notebook, small flashlight, etc., to facilitate the on-site measurement and recording of various data. Material acceptance includes pipeline inspection of waterways and circuits, whether the materials and the list belong to the same brand and model; whether the line pipe is damaged; length of use, etc. Wiring inspection must see whether the wiring of the clear water circuit meets the specification, including the distance, position, direction of the water pipe, and the distribution of wires.
Suppression and electrical test inspection, the waterway inspection must be carried out to suppress the water test, and the circuit inspection needs to use the ammeter to test whether there is a problem in each channel. Finally, there is the inspection of other details, such as the condition of the drainage pipe, the slope of the drainage, the location of the wire box, etc.
Step 2: The inspection of hydropower materials must be meticulous.
The first step in the acceptance of water and electricity is to check the material quality of the wires and water pipes, and secondly, to look at the length of use, so as to facilitate future settlement. First of all, check whether the brand of the water pipe is consistent with the list of decoration materials. At the construction site of this interview, all water pipes and pipes use Lesso PPR pipes.
Hot and cold water pipes must have clear instructions, and hot and cold water pipes cannot be used as hot water pipes. Wire materials should be seen whether the brand of the wire is consistent with the list. In this case, Qingfeng brand wires are used for paved wires.
Secondly, the conduit that wraps the wire uses Lesso PVC pipe.
Step 3: Plumbing layout check.
The layout of the pipeline is a major issue, and the following points should be seen clearly when carrying out water and electricity acceptance, which can ensure the safety of household water and electricity in the future. The wiring of the water pipe first requires "horizontal and vertical", the direction of the pipe should be reasonable, and the water pipe and the wall edge are balanced in the left and right directions and up and down, and the water pipe is at an angle of 90 degrees. The wire should be a loose wire, and the exposed wire should be able to be twitched back and forth during inspection, and it should be able to twitch flexibly.
Step 4: Waterway pressure test and circuit test.
The key steps in the acceptance of hydropower are to suppress the water test and detect the use of the circuit. These two steps are the key to checking the quality of construction. At the beginning of the acceptance of the waterway, it is necessary to fully enclose the upper water pipe, and carry out a pressure test, and the pressure of the pressure is generally megapascals, and it is closed for 24 hours.
Check whether there is leakage in all parts of the pipeline, the owner can bring his own newspaper, lay it at the water pipe joint, and observe whether the newspaper has any water traces caused by leakage after a period of time. The circuit test first checks whether the wiring of the electrical box is reasonable, whether the main switch of the home circuit is clearly classified, and the same leakage switch should not be used for the whole house circuit. In addition, it is necessary to check that the leakage switch is flexible.
-
Hydropower renovation refers to the decoration process of replacing all or part of the waterway and circuit used by the original developer according to the decoration configuration, family population, living habits and aesthetic concepts. Hydropower renovation is a vital part of home decoration, because it is a concealed project, the difficulty of later maintenance increases, and its quality is closely related to the safety of the owner. The following home improvement network will introduce you to the financial management of water and electricity renovation and decoration, and take a look at the details of the hidden project.
First, the process of hydropower transformation
1. Design the direction of water and electricity according to the design drawing of the room and the specific needs of customers.
2. Workers carry out slotting on the wall or the floor according to the direction.
3. Buried pipelines (including wiring and connecting pipes) and cassette.
4. Detect the circuit and test the pressure of the waterway.
Second, the details of the decoration of the concealed project of water and electricity
1. The design of the waterway should first think about all the equipment related to water, such as: water purifiers, water heaters, kitchen treasures, toilets and wash basins, etc., their location, installation methods and whether hot water is needed; It is necessary to think about the use of gas or electric water heaters in advance, and avoid temporary replacement of water heater types, resulting in repeated transformation of waterways; In addition to leaving the water outlet for the wash basin, toilet, washing machine, etc., it is best to take one out, and it is very convenient to receive water and mop the floor in the future;
2. When the cabinet manufacturer comes to the door for the first time, it is best to make an appointment with the construction master of the water improvement and communicate face-to-face. Before construction, the upstairs should be waterproofed to ensure that no water seeps downstairs, and then the construction is dispatched.
3. After the completion of the waterway transformation, the suppression test should be done, and the suppression test should be preferably present with the property to play a supervisory role; Because some renovation companies will deceive the owner in this link.
4. After laying the kitchen and bathroom floor tiles, water should be put to check to see if the floor drain drainage is smooth (subject to the drainage speed after removing the upper cover of the floor drain, because most deep-water sealed floor drains have the problem of slow drainage); If you want to close the excess floor drain, you must block the gap between the drainage pipe and the floor drain to prevent the water from overflowing;
-
Hydraulic deformation in home renovation is the most important part of concealment engineering. We are all in the dark box operation is a very difficult problem, when we are late to know the peace of mind to stay more, so pay special attention to the design of home improvement water and electricity. So let's talk about how to transformHome improvement water and electricity designwithHome improvement water and electricity designPrecautions.
1.Design hydraulic trends according to the room design and the specific needs of the customer.
2.The operator drills a hole in the wall or floor depending on the direction.
3.Buried pipes (including wiring and connecting pipes) and cassette tapes.
4.Detect circuits and test channels.
5.Smooth the trunking with cement sand.
6.Paste the wall or wallpaper and install the circuit board.
1.First of all, the waterway to design a good all water-related equipment, such as: such as basins, the location of water purifiers, installation and hot water, water heaters, kitchen treasures, toilets and face washers, easy whether in advance in the bathroom sink acres of sunsun thinking gas, toilets as well as leaving the washing machine water estuary, and also avoid, such as mopping, and then conveniently accept the best out of the ground water, or electric water heaters, water heaters repeated water reform, resulting in temporary replacement;
2.The best time to replace two door cabinets is to first grasp the fabrication surface of the water structure and face the communication. Before construction began, the upstairs had to be waterproofed to prevent water from seeping into the downstairs.
3.Converting the machine for 30 minutes, instead of reminding the worker to use fire to suppress the leakage current hit 6-8 atmospheres, the pressure test can be completed. Since some spectator groups will deceive their masters at this stage, it is best to be able to supervise the presence of the attribute during suppression testing.
4.After laying kitchen tiles to determine whether the drain drain is unobstructed (remove the problem of slow drainage in most deep water leaks, floor drain drainage speed cover topic) must be set up to test the water quality to prevent overflow, and the gap between the drain pipe and the floor drain must be blocked.
5.It is better not to drain the water for general features, because by the washing machine drain leak manor camouflage, camouflage the main use of a small amount of water, can leak the location of the deep shower etiquette and other draining of the drain to meet the basic needs, the slower; But the water flow of the washing machine is very fast, and the direct result of the credit, which cannot meet the speed of the deep water of the simple leakage estate, overflows below.
The above is how to transformHome improvement water and electricity designwithHome improvement water and electricity design
You can get it for free
-
VillaWhen doing the hydropower part, the wire pipe should not be in the gypsum line, which is easy to cause dead bends and dead lines; Can not open the long transverse groove pipe: the load-bearing inspection wall is easy to damage the structure, the light wall due to the force on the left and right sides, after the broken rib will still cause trouble; In addition to the kitchen and bathroom, the circuit line should be routed to the ground as much as possible (except for the top hall with a suspended ceiling), and the pipe should be bonded with PVC glue without the reed mouth; The pipe bender for the bending of PVC electric pipes with a pipe diameter of less than 25 cannot be bent with an elbow; The circuit is not a show, and the turning should try to avoid a right-angle dead corner.
The space area of the villa is relatively large, so the whole hydropower design process involves a lot of hydropower line transformation, if the location of the hydropower line is not renovated, it will directly affect the normal life of the owners. What are the precautions for hydropower transformation? Let's explain it to you! >>>More
Decoration and renovation of hydropower, we must pay attention to the quality and economy of the selection of materials, blindly pursue the highest is the highest quality, and workers must be practical when transforming, some places do not need circuits, transformation workers in order to make more money but invisibly increase a lot of places, so that it will be pitted and spend more money.
1. What are the feng shui taboos at the entrance gate of the villa. >>>More
The urinal is something that every family can't live without. After buying a house, what you need to consider is decoration, and there is a professional term in decoration, that is, water and electricity transformation. Today, let's talk about how to install a urinal in a hydropower retrofit for the best results. >>>More
Hydropower totals about 7000, including the cost of slotting and the cost of water pipes and wires. >>>More