Just like most women's makeup levels are high and low, the current level of house decoration is also different. Are you also worried about how to decorate your newly bought house, and you don't know much about the steps of building interior decoration now, right? I'll give you a detailed explanation here!
1. House inspection 1. Waterway: Is the water inlet pipe open? The waterproof condition of the sewer pipe and waterproof layer, is the waterproof effect good?
2. Circuit: There is no strong wire (220V) into the home, is the home line more than 6 square millimeters? Is there a weak wire (TV, **, network, etc.) in the home?
3. Civil engineering: Is the wall smooth? Are there cracks?
Is the cement grade of civil engineering powder water (the surface of the heaven and earth wall) high enough 4. Doors and windows: whether it is installed according to the requirements of the purchase contract, and how firm is the installation? 5. Indoor area measurement:
A detailed measurement of the usable area (required for renovation design) and whether the area is consistent with the purchase contract. 2. Design 1. The layout of the house: design according to your own understanding of the functional area of the house and your favorite style.
In particular, it is necessary to start from the practical (convenient) safety (such as the use of some handles, the treatment of the sunny corners of the wall, etc.) environmental protection (materials) beautiful (reasonable use of space) style 2, the drawing of construction drawings (workers are according to the construction drawings, to achieve the initial design effect. Hehe.
People don't do every job by themselves, they have to hire decoration workers. Draw construction details with dimensions, such as decorative walls, furniture, etc. 3. Budget According to the materials you know and the construction details to make a more realistic budget, remember not to forget the loss problem in the construction Fourth, the construction of interior decoration projects are usually divided into masonry, plumbers, masons, carpenters, painters, cleaners, porters, professional product installers and so on.
When decorating, it is recommended that you choose a regular decoration company to serve you, such as choosing an informal decoration company, the decoration quality and after-sales service may not be guaranteed, and may also bring property damage, please be cautious to identify. Don't look for a renovation team, because the same quality cannot be guaranteed.
-
1. Make a plan first, judge what kind of living facilities you need through the structure of the house and the general spatial layout, and have a number in your heart, and then go to a more professional designer with such a plan and planning.
2. Hydropower transformation, the most important point in the process of decoration is the hydropower project, because this is not only related to the convenience and practicality of future life, but more importantly, hydropower is directly related to the safe living environment of the family, so when decorating, we must do a good job of hydropower adaptation according to the location of the electrical appliances in the decoration plan and the place where water is needed, so that life is more convenient and comfortable.
3. Paving floor tiles or brushing walls, the second thing to pay attention to is the cleanliness of the ground and wall when paving floor tiles and brushing walls.
4. The installation of doors and curtains, bathrooms and kitchen supplies, in addition, the firmness of the installation of doors and windows, the style of the ceiling and the safety of the decoration are more important in the decoration.
-
The process of decorating a house.
1. Preliminary design.
The first step in decorating the house is to design, in fact, it can be carried out before the delivery of the house, of course, it should also be carried out according to the actual needs and living habits of the individual, provided that there is detailed data, then you need to measure the area of the house yourself, to put it bluntly, it is clear that the decoration area. For example: tiling, wall paint, wallpaper, furniture placement and other sizes.
2. Demolition and modification of the main body.
This is the first project of the new house, which is mainly carried out according to the design plan, including: knocking on the wall, shoveling the wall, removing the heating, replacing the plastic steel windows, etc.
3. Hydropower transformation.
After the above work is completed, the next step is the hydropower retrofit. But before the hydropower renovation, we still have a very important thing to do, and that is the first measurement of the cabinet. Although it is not possible to give a specific design size, it is only possible to make relevant suggestions on the location of the reserved water outlet and range hood socket.
After the measurement, you can start the hydropower transformation, and it is best to make the waterproofing as well.
4. Tiling. From the whole decoration process, tiling is a very important construction step, including the paving of wall and floor tiles, and at the same time to complete the installation of door stones and marble window sills.
5. Carpentry. In terms of the whole renovation process, there are relatively many things to do at this stage, but it also depends on the situation of each family. Carpentry includes wardrobes, cabinets, lockers, shoe cabinets, and more.
6. Paint. Painting is also a very important construction step in the whole decoration process. Before painting, the dust on the wall must be cleaned, and the painting process must be uniform, and after it is dry, the next step can be carried out. Generally, the interval between each session is more than 2-4 hours; During the period, we must pay attention to waterproof and sunscreen, so as to prevent problems with the paint film.
7. Installation part.
The decoration is here, and the basic decoration has been basically completed. The next step is to get into the installation. It mainly includes: kitchen cabinets, wooden doors, flooring, hardware and sanitary ware installation.
8. Furniture and household appliances enter the market.
Now the renovation is in the final stages, and all kinds of items have been purchased. This is followed by cleaning, and after it is completed, it is the installation of furniture and appliances that should be installed. Remember: be sure to leave it for a few months before moving in.
-
Hello, it is about the same size as my house, about 50,000 yuan, I just finished the renovation and went to the local decoration materials market and building materials market to buy materials.
Bricklayers need to buy cement, sand, floor tiles, wall tiles, (the floor decoration is completed and the last buy) carpentry work needs to buy joinery (large core board), panels, white latex, various types of nails, sandpaper, gypsum board (living room ceiling), aluminum-plastic board (kitchen bathroom ceiling) If you make your own door, you also need to buy slide hinge door handles.
Painters need to buy paint (primer, topcoat), sandpaper (sanding paint surface flatness), masking paper (sticky newspaper), putty paste, putty (nail eye).
Putty workers need to buy putty powder, gypsum powder (leveling), paint, latex (with paint), specific materials, you are working with the construction workers.
Construction process of decoration:
1) Enter, tear down the wall, build the wall.
2) Bathroom, kitchen floor for 24-hour closed water test (the developer needs to complete this task).
3) Drill the trunking, hydropower transformation and acceptance.
4) Concealed hydropower renovation project of sealing and burying trunking, and waterproofing project began without leakage in the closed water experiment.
5) Bathroom, kitchen with wall magnets.
6) Carpentry entry, hanging ceiling, gypsum corners.
7) Cover door covers, window covers. Make a wooden cabinet frame.
8) Synchronous production of all kinds of wooden doors, modeling doors and flat pressing.
9) Wooden panels are brushed with dustproof paint (clear oil).
10) Window sill marble countertop leveling.
11) Wood veneer pasting, line making and fine installation.
12) Wall base treatment, grinding, leveling.
13) Household goods, stickers (protective edges) are pasted at the seams of the door.
14) Wall oil ici at least three times.
15) Furniture paint entry, nail holes, paint.
16) Treat corners, lay floor tiles, solid wood or laminate flooring, waterproof marble strips, baseboards.
17) Installation and debugging of lamps, sanitary ware, handles, and door locks.
18) Clean up and sanitize, repair the floor tiles, and withdraw from the site.
19) Preliminary acceptance within the decoration company.
20) The three parties make an appointment for formal acceptance and delivery to the owner.
-
What are the tips for home decoration? Do you think it's best to start with ** when decorating your house?
After we got the house, we first had to give ourselves a design plan, what we thought in our hearts, how to design the house, and what style we wanted. The first step is to position the plumber workers and lay the wall where it needs to be laid. After the completion of hydropower construction, some materials such as cement, sand, and tiles can be entered, and the earthmoving master can paste tiles.
Paste the bricks in the living room, dining room, room, bathroom, and kitchen, and you can enter the carpentry. Now many friends ask, if he hasn't taken care of this piece of land, you will start making cabinets, what's wrong?
First of all, if these floors are not treated, the owner will usually apply laminate or solid wood flooring. So the earthmado master just needs to level it. After the earthmainer has done this, he can move on to the woodworking materials.
A lot of owners opt for tile walls, which are like walls on the tiles. He didn't know what order he would hang this roof first, or put the tiles first.
Let's take an example. When we buy a house, the height of that floor is basically about meters, and it is best to stick it to the meter height first, and the carpenter hangs on the roof, and then sticks it on the top. The tile will be better when it hits this top, and it won't break so easily.
carpentry after finishing the cabinet ceiling. The last step is to start scraping putty. The basic order is this.
Some of your friends are like we haven't started to deal with this wall, and you start making cabinets. If you make the wall first, and then make the cabinet, this wall will be dirty if you hold it. Like some places where the wall is insufficient, if we make cabinets, there is a large gap between the walls and the cabinets, which is not good-looking.
So we usually have the normal order. The first is to make a good cabinet. The final step is to repaint.
This will basically not clutter the wall. The details are also handled quite well, if the greasy part is scratched, the latex paint can be finished to install the lamp, install the switch socket. Basically, the approximate order is like this.
I hope you can understand when decorating.
Are you still satisfied? If you like it, you can like and follow! After we test the method with a high pass rate, I hope mine can help you, and I also hope you can help me**, like, support me more, and follow me more.
If you have any questions and requests, you can leave a message in the comment area, and I will reply one by one. Disclaimer: Part of this article is **** on the Internet, and the data marked with ** and the relevant information are all cited.
-
When the house is decorated, it should do a good job of the ceiling, and it is also necessary to do a good job of the filial piety beam reed wall with the TV background, to pave the tiles, and also to achieve the separation of dry and wet, and also to do a good job in hydropower transformation.
-
One of the tricks of house decoration is that you need to decorate some water and electricity first, and then decorate the floor and walls. When decorating a house, you probably need to start decorating from the floor, and of course, you also need to install a boring door before decorating the floor, so as to resist imitation bending to prevent the floor from being stolen by others.
-
Be sure to find a particularly good decoration team, decoration company, when decorating to confirm the budget in advance, to determine the decoration steps in advance, when decorating the house pure regret must first set up the front accompaniment, and then to carry out the main body of demolition and renovation, to replace doors and windows, water and electricity transformation.
-
1.After the designer is satisfied, the detailed construction drawings and renderings are issued, the contract is signed, and the designer is handed over to the foreman.
2.Change the waterway, and then do the closed water test;
3.Change the power, through the pipe line line;
4.When the bricklayer enters the site, the kitchen and bathroom walls should be brushed with 107 glue and then tiled;
5.When the carpenter enters the site, the board used must be brushed with anticorrosive paint;
6.Oilers enter the noisy field;
7.Cleaning. 8.The owner accepts and signs the warranty contract;
9.Delivered to the owner.
1) Decoration steps.
1. Understand and compare the selection of decoration companies. >>>More
1. Check the verification photo. Any legally registered enterprise has a business license issued by the industrial and commercial department. The main proof of the business license is: whether the business is legally registered; the registered capital of the enterprise; The business scope of the enterprise. >>>More
No matter what clinic you want to open, I have a list of precautions for clinic decoration here, you can learn about Oh 1The clinic decoration follows the standard: function is the foundation, and the image is the beautification and sublimation on the basis of function Precautions for clinic decoration 2 >>>More
Now the elevator must be considered in the process of building construction in the community. >>>More
It is better to simply decorate, after all, the role of the basement is not strong, and it is only a storage role, so you don't need to spend too much money to decorate.