-
It is necessary to lay floor heating, and it is necessary to lay floor heating in every corner of the home, so that your home will not be cold in winter, and this will make your home very warm in winter.
-
Of course, it is necessary to put the furniture in the place, although the place to put the home may not be used, but it will be particularly convenient to lay the floor heating, and the floor heating will be spread throughout the room, so that the warmth is also very good.
-
It is necessary because the position of this furniture cannot be fixed in one place all the time, and it is very likely that it will be moved, so the entire area needs to be heated.
-
Of course it's necessary. This will increase the area of underfloor heating, and it will also allow the home to be evenly heated, so that it will feel warmer in winter.
-
It is not necessary, because it is easy to cause a waste of resources, and it will also cause a certain degree of damage to the furniture.
-
It is not necessary, this also reduces the cost of the economy, and also allows the underfloor heating to be laid where it is needed.
-
1. Floor heating and decoration synchronization Floor heating is best synchronized with decoration, I believe everyone should have no opinion on this point, because floor heating is a hidden project, laid under the floor. Floor heating has the early stage and the later stage, the early stage is at the beginning of the decoration, after the water and electricity began to install the water collector and lay the pipe, the later stage is after the decoration, the installation of the hanging fireplace, all aspects of the problem, you can use as usual.
2. Pay attention to the details of laying It is said that the details determine success or failure, the details of the floor heating also determine whether the floor heating is good or not, the pipe layout of the floor heating is more complicated, so we must ask an experienced master to help design and install, for example, you need to calculate the spacing of the pipeline, decide the shape of the laying, if the pipeline is unbalanced, there will be a local situation of no heat, of course, the material also needs to be well selected, the material is not good will dissipate heat downstairs, which will have an impact on human comfort, There is even the release of harmful substances.
3. Concrete filling This point is mainly to protect the floor heating pipes and make the ground temperature uniform, so it is also necessary to pay attention to it, especially when supervising the work, to see if the masters use fine stone concrete, the diameter of the stone particles should not be greater than 1cm, the volume ratio of cement mortar is not less than 1:3, and the concrete pouring height is 4cm.
4. The ground can not be punched In addition, it is necessary to pay attention to whether there is a hole in the ground, and there can be no punching and nailing, so as not to leak the floor heating coil, resulting in water leakage.
5. Do not place furniture with a large contact area directly on the floor One thing to pay special attention to, do not place furniture with a large contact area directly on the floor, we also know that floor heating is a bottom-up heating method, if these large areas of furniture are on the floor, it will definitely affect the indoor temperature, resulting in the room is not warm, so try not to put fixed decorations or placed legless furniture.
-
1. Floor heating installation and decoration are synchronized.
The installation of floor heating is generally synchronized with the decoration of your home, when to start the decoration, when to install floor heating. There are two phases of floor heating, the early stage is at the beginning of the decoration, after the completion of water and electricity, the installation of water collectors and laying pipes; In the later stage, after all the decoration of the home is completed, the wall-hung boiler is installed and debugged, and the debugging is correct, and it can be put into use in winter.
2. The details of floor heating pavement are very important.
The layout of the floor heating pipes is more complicated, and it is necessary to calculate the spacing, the shape of the laying, and if the pipes are not balanced, there will be a local situation of no heat. It is also necessary to pay attention to the choice of insulation materials, if the insulation materials are not good, it will dissipate heat downstairs, affect the comfort experience, and may also cause the release of harmful substances.
3. Concrete filling.
A structural layer used to protect underfloor heating pipes and to uniformly raise ground temperatures. Generally, it is fine stone concrete, the diameter of stone particles should not be greater than 1cm, and the volume ratio of cement mortar should not be less than 1:3. The concrete pouring height is 4cm, which needs to be manually paved, and oscillators cannot be used.
4. After the floor heating is completed, it needs to be debugged.
This must be remembered that after the installation of the wall-hung boiler is completed, the floor heating must be debugged, and the undebugged floor heating system is strictly forbidden to be operated and used. In the case that all water sources, power supply, and hot water return are in place normally, the commissioning of the whole system is carried out, and you must also be present to supervise during the commissioning, and you can sign only after the commissioning is completed.
5. The ground cannot be punched.
When decorating, pay attention not to punch holes and nails on the ground, so as not to leak the floor heating coil and cause water leakage; After the decoration is completed, it is strictly forbidden to punch holes and nails after laying the floor, if you accidentally penetrate the floor heating pipe, it will be very troublesome to solve.
-
Precautions for underfloor heating maintenance
1. Floor heating warranty time
For users who have installed underfloor heating, underfloor heating should be repaired at the end of winter to ensure that the underfloor heating is in a good standby state for a long time after it is not in use. This requires you to understand the warranty date, warranty precautions, etc. of the floor heating in advance before the installation of floor heating.
Generally speaking, the warranty time of floor heating is one year, but the warranty time of different brands and different types of floor heating is not the same, and the warranty time of each component is not the same, for example, for coils, it can generally be more than 50 years without external force without quality problems, and the warranty time of boilers is 1-2 years.
2. Floor heating installation company
The maintenance of floor heating needs professional construction personnel to carry out, so once there is a problem with floor heating, we need to contact the floor heating maintenance company, it is recommended to contact the floor heating installation company, and there will generally be floor heating maintenance personnel to come to the door for maintenance services.
Floor heating maintenance company for the user's floor heating maintenance is not the same, professional floor heating maintenance company will be within 24 hours of door-to-door service, for the damage to the floor heating to make timely treatment, can not be repaired on the spot, will also be solved in the case of ensuring the user's daily use.
3. Floor heating maintenance quality
For floor heating maintenance, it is not only necessary to make a correct treatment of the floor heating on the spot, but also to ensure the use of floor heating in the future. Therefore, when choosing a floor heating maintenance company, residents need to compare more, confirm the qualifications of the floor heating maintenance company, and choose a strong and experienced regular floor heating maintenance company, so as not to cause maintenance problems in the future.
Underfloor heating maintenance costs
For floor heating maintenance, if the maintenance is carried out within the warranty period of floor heating maintenance, then there is no need to consume the household cost of the household, and for the floor heating maintenance beyond the maintenance warranty period, the cost is generally composed of maintenance personnel maintenance costs, floor heating parts and replacement costs, and the specific cost needs to be determined according to the floor heating brand used by the user and the replacement requirements.
-
As a necessary equipment for keeping out the cold in winter, floor heating is favored by many families. However, have you noticed all these problems when installing underfloor heating? One:
installation of supervisors; The main floor heating pipeline is an important equipment for transporting water from the floor heating system, and if there is a problem with the main pipeline, it will affect the operation of the entire heating system. The following points should be paid attention to when installing the supervisor: 1. The installation of the supervisor must be constructed in the position indicated in the design drawings, and there shall be no error; (If it needs to be changed during the actual installation, please note the position of the supervisor to change on the drawing, provided that the designer's consent is obtained) 2. The supervisor must do thermal insulation; 3. The installation of the supervisor should be horizontal and vertical; 4. The supervisor should be fixed firmly with a pipe clamp; 5. After the installation of the supervisor, the suppression test should be done.
Second: the installation of the water collector is the heart of the floor heating system, relying on it to evenly distribute and ** the water of each floor heating branch, in order to achieve a good system circulation, the water collector should be installed in the following points: 1. The installation of the water divider should be kept horizontal; 2. After the installation of the water separator, it should be wiped clean; 3. Pay attention to the connection of water supply and return; 4. After the installation of the water separator, the heating area of each circuit needs to be marked.
Three: pipe laying in the floor heating construction of the laying of floor heating pipes is the top priority, the quality of the floor heating pipe laying directly affects the heating effect of the floor heating system, if the installation is improper, the floor heating will appear local not hot or local overheating, so in the floor heating pipe paving should pay attention to the construction according to the drawing: 1, consistent with the design loop 2, pipe laying spacing and design consistent 3, if the actual laying length gap between the pipeline circuit is greater than 30 meters, it is necessary to readjust and notify the installation company in time 4, The distance between the road and the cold wall is 100-150mm 5, resolutely put an end to the phenomenon of pipeline crossing 6, and the ground part of the pipeline connected with the water separator must be insulated casing 4:
The laying of the backfill layer floor heating backfill layer can also be called the heat storage layer, the improper construction of the floor heating backfill layer will not only affect the installation of ground decoration materials will also damage the floor heating system, and pay attention to the correct construction when the floor heating backfill: 1. The fine stone concrete protective layer is laid, and the pressure gauge is checked before laying, if the pressure gauge pressure is lower than 4MPa, it is forbidden to construct 2. Concrete mixing: It is strictly forbidden to carry out concrete mixing directly on the floor heating pipe.
Wood or plastic panels can be used to lay wood or plastic panels on the underfloor heating pipes. During construction, the floor heating coil shall not be exposed, such as the wall insulation strip falls off, the boundary insulation strip needs to be reset 3, and the ground height is almost greater than 5mm after concrete leveling. 4. When laying concrete, it must be marked at the door, aisle, floor drain and other locations to prevent improper behavior in the later construction from damaging the floor heating pipeline.
-
The tightness of the underfloor heating system must be checked before paving.
1. The ground must be dry (which can be judged by experimental phenomena), and the moisture content of the cement floor should be lower than that; The indoor humidity should not be too large, regardless of whether there is geothermal heating, the ambient humidity is about 60 degrees before and after installation.
2. It is strictly forbidden to nail the ground during construction. After the construction is completed, nailing is also prohibited on the ground to prevent damage to the heating coil. Before laying laminate flooring, EPE composite film should be laid to isolate moisture and release moisture from the surrounding skirting boards.
The keel should not be laid. The low thermal conductivity of the air will affect the heat dissipation effect and may damage the pipe.
3. When the floor is laid, it must be used with special glue for floor heating to increase the use time and effect, and this glue basically does not have to worry about the emission of harmful gases. Leave a sufficient expansion joint between the floor and the wall, and use a skirting board that is thicker than the current floor.
4. Paving the ground and installing the baseboard should be divided into two constructions. 48 hours after laying the floor, wait for the glue to dry completely, remove the fastener and then make the baseboard. It takes 24 hours after installation for the floor to be heated.
-
1) Measure the height between the ground and the threshold and roof to ensure that the net height will not be affected after the installation of floor heating. 2) This project is not easy to carry out at the same time with other types of decoration work, and it is necessary to coordinate the entry sequence and do a good job in the design of the construction plan in the early stage.
3) Before construction, the ground needs to be leveled and selected materials, such as (geothermal pipes, water separators, water mixing devices, and insulation materials. etc.) and determine the location of the water separator in advance.
4) The first step of floor heating installation needs to go to the main pipeline and do the suppression, and then fix the manifold and make the corresponding connection between the main pipeline, and then lay the insulation board and reflective film.
5) In the process of floor heating coil, workers are required to construct according to the drawings, there shall be no crossover and connection between the pipelines, multiple loops should be balanced, exhaust valves and filters should be set between each circuit, and the connection between the water separator shall be horizontal and vertical.
-
Nowadays, many people like to use floor heating when decorating, but the installation of floor heating is very convenient. From material selection to construction, we must pay attention. If the water and floor heating are not in place, there may be floor leaks and insufficient heat in the future.
PE pipes are mainly used for water supply and floor heating. This kind of pipe has good heat resistance, is easy to process, and has a certain anti-corrosion and anti-aging effect. Compared to other pipes, its surface is smooth and does not affect the flow of water.
Although these two pipes have slightly different names, they both belong to polyethylene pipes. PE-X pipes have better heat resistance and higher hardness, and the water separator is the equipment we need to lay floor heating. The room can be heated by dividing it into multiple waterways.
The best material for water separators is pure copper, which is strong and durable, and has a certain antibacterial effect.
Some heat insulation films, seam edges, steel wire mesh and buckles are all auxiliary materials for underfloor heating. Although it may not seem to be very useful, it can also affect the installation of underfloor heating if not chosen correctly. Nowadays, the quality of these excipients on the market also varies, so we should try to choose some materials from large manufacturers.
After the temperature control line is buried and the sub-collector is installed at the specified location, the ground insulation layer and heating pipes can be laid. While these parts may not seem difficult, in fact, some small details are very important. For example, after the ground pipe is laid, acceptance tests should also be carried out to ensure proper use.
The insulating board is cut according to the actual size and then laid. Make room for the pipes during the laying process. Lay the heat shield first, and then lay the reflective film.
When laying, the insulating panels must be tightly connected, and the edges of the two reflective films must also be glued with adhesive tape. There are now more and more dry underfloor heating laying modules. Underfloor heating is laid to retrofit the water circuit in advance, walk along the foot of the wall or bury it in the dark.
The reflective film is laid first, and then the module is dried. After the module is laid, attention should be paid to the coil and coil floor heating pipe when turning. In this way, the structure is simple and warm.
First of all, it shows that there is a more cautious attitude and a responsible approach. Of course, everything develops in the process of groping. In order to sum up the experience, it will definitely not be rolled out on a large scale.
Officially provided configuration requirements.
Basic configuration] operating system: win98 2000 me xp >>>More
Today's China's economy is developing very fast, and our transportation is becoming more and more convenient. However, for some remote mountainous areas, whether it is high-speed rail, airplanes, or trains, it is impossible to reach them easily. As a result, long-distance buses have become the first choice for many people, whether it is for tourism or returning to their hometowns, long-distance buses are still one of the essential means of transportation at present. >>>More
Well, this is called a broken position, that is, when the drift is about to end, press shift+reverse, there will be a strong anti-pull force, so that the body becomes positive, and can spew fire normally, high-speed straights are more suitable for this.
What plate are you carving? Data disk or ***?
Please read the documentation of the burning software carefully! >>>More