The details of the decoration budget list are not complicated, and mainly include three aspects:
1. Decoration project. In general, decoration projects include civil engineering projects, ground engineering projects and hydropower decoration projects. In civil engineering projects, common ones include wall smashing, bricklaying, room isolation, waterproofing, cast-in-place stairs, etc.
Ground projects include ground leveling, floor tiling, etc. Hydropower projects include the laying of hydropower lines, ceiling wiring, etc.
2. Space decoration project. It is mainly to decorate different functional rooms, such as kitchens, bathrooms, living rooms and bedrooms, etc., including more decoration details, such as doors and windows, wallpaper paints, furniture coffee tables, etc.
3. Service items. Common ones include the transportation cost of decoration materials, the removal and freight of construction waste, and the cleaning and maintenance fee after decoration. At present, most of the decoration companies can come up with a reasonable decoration budget, before the public chooses the decoration company, mainly refer to the reasonableness of the budget, and compare different decoration companies**, from which to choose a suitable decoration company.
-
First, look at the construction project.
How to read the renovation budget list? First of all, look at whether the construction projects mentioned in the list are consistent with the design plan.
The decoration of each house will involve many decoration projects, depending on the design plan, or the size of the house, the construction project and the amount of work will be different. The construction of the decoration company is carried out according to the design plan, and it is naturally carried out according to the project involved in the design plan. Therefore, when the owner looks at the budget list, he must first check whether the construction project is correct, if it is inconsistent with the design plan, then it is necessary to verify the construction project with the decoration company.
Second, look at the list of materials.
How to read the renovation budget list? It is indispensable to look at the list of materials!
Home decoration requires a large number of decoration materials, and material costs are also a major expenditure item for decoration costs. At the same time, because of the large and complex materials involved, the first part of the material is also the most prone to problems. On the one hand, there are many types of decoration materials, and there are many products that can be replaced by similar products, which also has the hidden danger of shoddy materials.
The list of materials should have a description of the category, brand, name, use, quality grade and other relevant aspects of the corresponding material, if not, you can ask the decoration company to provide. Understand the material details, and when the materials enter the construction stage, it is good to check whether the materials are consistent with the materials on the budget list.
Third, look at the details.
How to read the renovation budget list? Looking at the details is also a point that cannot be ignored. **The details are mainly to pay attention to whether the unit price of the material is clear.
Different materials, different shapes, different units of measurement, such as plates, is cut into the same size of the rectangle, generally according to how much is a square meter**, the unit of measurement is accurate, the unit price is clear and unambiguous, there will be no differences in settlement. However, if some decoration companies opportunistically use "one piece or one" to carry out**, then it may invisibly increase the cost of materials. Therefore, when the owner looks at the decoration budget list, he must pay attention to the problem of unit price, and if he finds ambiguity, he must confirm it with the decoration company in time to avoid adding some unnecessary costs.
Fourth, look at the attachment or description.
How to read the renovation budget list? Another thing that is often overlooked by owners is the attachments or additional instructions. A complete renovation budget list will generally have some attachments or additional instructions, and many owners tend to think that it is some "form content" and do not care, but these contents are also some supplementary instructions to the budget list.
For example, if there is a discrepancy between the actual construction area and the area in the budget list, the settlement shall be based on the actual measured area. If you don't have this additional note in the budget list, and you don't notice this problem when you look at the budget list, then you will end up losing.
-
Before decorating a house, you need to make a list budget, what are the decoration list budgets? Today, I will answer them one by one for you.
1. Construction projects and installation construction projects.
1. Civil engineering projects: smashing walls, building walls, wall insulation, attic staircase hole casting, waterproof engineering, etc.
2. Ground engineering: flooring, tiling, and ground leveling.
3. Hydropower engineering: waterway transformation, circuit transformation, heating modification, air switch addition and modification, floor heating pavement, lamp installation, hanging and slipping top wiring, sanitary ware installation, switch and socket panel, etc.
Second, the space decoration project.
1. Room aisle: wall treatment, wall coating, ceiling, etc.
2. Entrance door: door, door cover, ceiling, wall treatment, wall coating, shoe cabinet, etc.
3. Living room: wall treatment, wall coating, ceiling, window covering, curtain box, window sill, background wall, TV cabinet, corner protection, balcony sliding door, etc.
4. Restaurant: ceiling, wall treatment, wall coating, dining table background, etc.
5. Kitchen: overall kitchen facilities, wall tiles and floor tiles, aluminum gusset ceilings, waterway transformation, including sewer pipes, door covers, sliding doors, etc.
6. Toilet: sanitary ware, wall tiles and floor tiles, aluminum gusset to prepare the ceiling, waterway transformation, including sewer pipes, door covers, sliding doors, etc.
7. Bedroom: door, door cover, window cover, curtain box, wall treatment, wall coating, wardrobe, ceiling, etc.
3. Service items.
The services in the house decoration budget list include garbage removal freight, material handling fees, completion cleaning fees, main material ** fees, etc.
-
The renovation budget list includes four categories: management fees, labor costs, material costs, and other expenses.
1.Design management fee.
Nowadays, many decoration companies include the design fee in the decoration fee and do not charge the fee separately. The management fee is determined by the local renovation market and does not differ much within the same area. For specific fees, the owner can also ask the renovation company to reduce the fee.
2.Labor costs.
The labor cost is determined by the cost of working hours and renovation hours of various types of work in the local area. The house decoration cycle is generally not short, especially the villa decoration period basically starts in half a year. The longer the renovation period, the higher the labor cost.
3.Material costs.
The difference in material cost is determined by the quantity, grade, brand, specification, etc. of the decoration materials. Owners must pay attention to the choice of materials before decoration, and the material cost is also the most likely to be exploited by the decoration company.
4.Other Fees.
The cost of late closure includes cleaning fees, construction slag removal freight, material transportation costs, etc. Although other expenses do not account for much, the owner can save a few hot pot money if he saves a little bit.
What should I pay attention to when making a home renovation budget table?
1. The standardized decoration budget table should include the main materials, auxiliary materials, labor cost items, etc. In addition, the budget table should also contain the budget description, process description, material description and acceptance criteria.
2. The main materials purchased by the decoration company in the home decoration budget table should be indicated separately from the brand, model, specification and grade of the main materials, so as to compare the advantages and disadvantages of the materials and the level of the materials. Some accessories will be used in many places, and together they are also a lot of money, so you should pay attention to the home decoration stool destroyers.
3. For the part made by woodworking, you should pay attention to which materials are used in the production and how much each is used. The paint part is converted to buckets or liters, because the paint is purchased in buckets or liters. In addition, many materials will be written "according to the actual settlement", and the extra materials will be refunded when the code is settled.
4. The waterway reconstruction project is done by PPR water pipe manufacturers, among which the circuit transformation project should list the material information used in detail, and the more detailed the more problems can be found. Also, don't forget to ask the renovation company to provide a VCD or a drawing of the water and electricity installation for later maintenance or replacement.
5. Some projects were originally installed by the manufacturer for free, but they would be calculated into the labor cost, so each one should be asked in detail.
6. Regarding payment, there are generally four payment periods, namely, the advance payment for the start of construction, the mid-term progress payment, the later progress payment and the final payment of the project, and the proportion is generally %.
7. Add an article to the home decoration budget table: the total price of the final account shall not exceed 5% of the total budget price, and the excess part shall be borne by the decoration company. And it should be noted that overcalculation, miscalculation, and omission are the responsibility of the decoration company.
-
Everyone wants to spend the least amount of money to achieve the desired results. Today Tuba Rabbit is to make the renovation people spend less money, here are the main points of the renovation budget list.
Under normal circumstances, the renovation budget consists of four parts, and the decibels are the materials, labor, design, and management expenses.
1) Material costs.
Normally, the materials used for decoration are:
Living room, bedroom.
1) Building Materials: Floor Tiles, Paint, Baseboards, Flooring, Paint and Plaster Lines.
2) Lamps: main lights, spotlights and floor lamps.
3) Fabric category: curtains.
4) Hardware: curtain tracks, door locks, door stops, hinges, switch panels, power sockets and TV sockets and air conditioning sockets.
1) Building Materials: Floor Tiles, Wall Tiles and Suspended Ceilings and Cabinets.
2) Lamps: main lights, spotlights and cabinet lights.
3 Electrical appliances: cookware and range hood.
4) Hardware: sink, sink faucet, floor drain, door lock, door stop, hinge board hold, switch panel, power socket, angle valve.
Bathroom. 1 Building Materials: Floor Tiles, Wall Tiles and Suspended Ceilings.
2) Lamps: main lights and spotlights.
3) Electrical appliances: ventilation fans and bath bombs.
4) Sanitary ware category: toilet, bathtub and shower screen.
5) Hardware: hand towel towel der, shelf, towel rack, towel rack, soap holder, coat hook, bathtub faucet, door lock, door stop, hinge, switch panel, power socket, angle valve, sprinkler, basin, etc.
Consumers choose materials to use according to the design drawings provided by the decoration company. The materials chosen should be in line with their own economic level. After determining the cost of large leaseback, go to the building materials market and inquire**.
Take a look at several building materials markets and learn about the materials so they don't get fooled.
Labor cost = worker's wages Number of days. The exact cost is negotiable.
Some people think that the design is not necessary and can save the design cost. However, during renovation and construction, such problems are often prone to occur, resulting in frequent rework, but at a higher cost. As a result, design fees cannot be saved.
4) Management fees.
The management fee refers to the cost of the renovation company for the owner, assisting in the purchase of materials, entering the supervision, and coordinating the expenses of all parties. This fee can be communicated to the company.
You can get it for free
-
When decorating the house, if it is said that we are afraid of exceeding the budget, then we make a list before decorating, the home improvement budget list is a good way to save moneyHome improvement budget1. What is included in the home improvement budget list.
1. When carrying out the actual decoration, there are direct costs that we are involved in, and the direct costs actually include materials, equipment and accessories, freight and labor costs, etc., for these costs, when the actual consumption is made, they are estimated according to the market transparency. So it's very easy to know the exact price in this area.
2. When carrying out the actual decoration, if the user provides the actual materials and equipment by himself, then the funds for each project should be budgeted, and then the total price is added, so that the final total cost is the end. For example, when the actual decoration is carried out, if the material cost and labor cost of latex paint is 15 yuan per square meter, and the area that needs to be decorated is 150 square meters, then the unit price of the final project is 2250 yuan.
3. Before home decoration, we must understand how much the cost of specific decoration materials is in the actual decoration, and then compare many according to the price of the actual materials, and then get the price after that, which is the price of the actual decoration.
Second, what are the home improvement skills.
1. Ground decoration materials, from the perspective of taking up less space and reducing the load of the floor slab, should be as thin as possible, such as marble slabs, as long as the quality of the construction is high, it does not appear; "Hollow"phenomenon, then choose 6-8 mm thick on the line. Curtains, thin curtains are very fashionable. The reason is that high-rise buildings do not need to worry too much about the sight of outsiders, and the aluminum alloy windows are particularly well sealed, and the curtains are mainly decorative, supplemented by wind protection.
Ceiling; It is better to be thin, which can increase the safety factor and occupy less space.
2. In"Soft furnishings"Medium, thicker materials are very textured, such as bedspreads, sofa cushions, cushions, etc.; Others lowered the height of the bed board and superimposed two Simmons mattresses, new and old, to highlight the comfort and warmth of the bed. The taller the space, the thicker one can be built"Flooring"to express the layering of space and the sensitivity of the area, giving people a kind of aura"Enter the house"Enjoy.
The above article is to introduce to you about, home improvement budget list recommendation, and what are the skills of home improvement, I hope that friends who read the above article will master the skills of home improvement budget.
To do, do when you decorate will be more clear about your money to spend, now decoration to buy kitchen appliances is the most expensive, especially good kitchen appliances, I am afraid of fumes at home to buy an integrated stove is also very expensive, good and easy to use, or the heart is stuffed, bought a Martian, this brand of integrated stove smoke is really good.
The renovation budget list refers to the detailed list of various expenses required in the renovation process, which can help the owner to reasonably plan the decoration budget and avoid the financial pressure caused by cost overrun. Here are some introductions to the 120 square meter rough house renovation budget list. >>>More
1. Design account: Entrust others to design to pick the hand, and the design fee accounts for 5-20% of the entire decoration cost. 2. Data account: >>>More
The specific decoration of the house can be calculated here,just enter the area city,calculate the decoration in seconds,know the real in advance,and
We all know that decoration is a very deep knowledge, the development of the decoration industry has risen a lot of decoration methods, now the decoration has the concept of half-package repair or full-package repair, half-package repair is a way between the clear package and the half-package, the construction party is responsible for the construction and the procurement of accessories, the main materials are purchased by the owner. So what are the items included in the home renovation half package budget? Responsible for indoor structure renovation (such as wall demolition or new wall), then Responsible for hydropower renovation construction (water supply and drainage design and installation, circuit design and installation, sanitary ware installation, etc.), Responsible for mud construction (backfilling, ground leveling, waterproof treatment, wall tiles and floor tiles, etc.) Responsible for wood construction (ceiling, modeling production and some on-site production of furniture, etc.) Responsible for paint construction (wall, wallpaper or latex paint, furniture paint, etc.) Some of the above parts may be installed by the seller, such as sanitary ware. >>>More