The majority shareholder mentioned on the Internet is actually a shareholder who holds shares, not a major shareholder. Moreover, the investigation of the 400 billion "photovoltaic brother" LONGi Green Energy is not suspected of insider trading, but the shareholders of LONGi Green Energy are suspected of internal trading, so it will be investigated, not that this shareholder is suspected of internal trading LONGi Green Energy, this must be clear, this matter has nothing to do with LONGi Green Energy, that is, its shareholders have been investigated.
1. Li Chunan is a shareholder, but he does not hold many shares.
According to the official announcement released by LONGi Green Energy. Li Chunan holds the company's largest proportion, and the proportion of shares held does not exceed 5% at all, so he has no actual right to speak on many decisions and major aspects of the company, just a person who is waiting for annual dividends. However, Li Chunan is a person who acts in concert with Li Zhendong and Li Xiyan, the actual controllers.
There is such a provision in the listing formula acquisition, if the proportion of shares exceeds 5%, a report must be submitted, this report needs to explain all your information in detail, and even there is a risk of not passing, so most of these people in the acquisition company will find a bunch of people to invest in the acquisition in order to avoid submitting this report, but before the acquisition, a plan will be written, I propose to buy, you are just dividends, I will talk about everything. Li Chunan is like this, he is only a participant in the acquisition that Li Zhendong asked to help with, not the actual controlling person.
2. Li Chunan was investigated for suspected insider trading of other companies**.
This time, Li Chunan was investigated for suspected insider trading of other companies, and had nothing to do with LONGi Green Energy, and this information was also admitted by Li Chunan. Li Chunan's suspected insider trading company is LONGi EMC, the general manager of LONGi Electromagnetic was investigated for suspected insider trading, Li Chunan holds shares of LONGi EM, so Li Chunan will be subject to relevant investigations, LONGi Electromagnetic and LONGi Green Energy are two different things, don't get confused.
-
The first point is that the story behind this is actually a special case, and the second point is that there are many cases of tax evasion and evasion, so the third point is being further investigated, and there are many hidden secrets that are not known.
-
This person may be an improper fund, and I hope that after the investigation of the public security organs, I can give an explanation to the ordinary people.
-
Does not affect the company's operation At present, Liancheng CNC and LONGi Green Energy have responded that the subject of the suspected insider trading is not their own company**, and it does not involve the company's related matters, and will not affect the company's normal production and operation.
Installing photovoltaic power generation is about 3 pieces per watt. In 2021, the installation cost of photovoltaic modules has dropped significantly, with the installation cost of 1 watt being about 3 yuan, and the installation cost of 10 kilowatts being estimated to be 30,000 yuan. The installation cost has been reduced, but the subsidy has also been reduced, and in the new policy in 2021, ordinary photovoltaic power plants and commercial photovoltaic power generation are likely to no longer be subsidized, and household distributed photovoltaic power generation will not be subsidized. >>>More
20 watt photovoltaic panel peach street lamp integration is a new type of street lamp design, it uses 20 watt photovoltaic panels as the energy source, and at the same time combines the design of peach street lamp, so that the street lamp has higher energy efficiency and more beautiful appearance. >>>More
Declaration Procedure. 1. Local project declaration. The applicant shall submit the project application materials to the competent department of finance and housing and urban-rural construction where the project is located, and apply for ** financial subsidy funds; The local departments in charge of finance and housing and urban-rural construction shall seal and report to the departments in charge of finance, housing and urban-rural construction of the provinces, autonomous regions, municipalities directly under the Central Government and cities specifically designated in the state plan. >>>More
The core components in the cost are solar panels and inverters, which are also the two most expensive devices. The system of string circuit design uses a centralized inverter, and the system factory sells 10 yuan W; The parallel circuit design uses a micro inverter, which is safer for household use but is more expensive, and the factory direct sales are 12 yuan -15 yuan W, depending on what inverter you use. >>>More
Cranes, adjustable wrenches, hexagon wrenches, screwdrivers, cables, wire strippers, insulation, waterproof tape.