ZDY4000S full hydraulic drilling rig belongs to the type of low speed and high torque, which is suitable for the construction of large-diameter drilling with composite disc bits, cone bits and auger drilling tools, mainly used for the construction of underground gas extraction, water exploration and discharge and other engineering holes in coal mines, and can also be used for the construction of surface engineering drilling.
Second, the meaning of the full hydraulic drilling rig model.
Z stands for drilling rig, D stands for power head type, Y stands for hydraulic transmission, number stands for maximum rated torque, S stands for double pump system, and L stands for crawler.
3. Product structure of full hydraulic drilling rig.
ZDY4200S coal mine tunnel drilling rig adopts grouped arrangement, the whole machine is divided into three parts: main engine, pumping station and console, and each part is connected by a hose, which is flexible and disintegrative, easy to relocate and transport, and can be further dismantled in areas with poor transportation conditions.
Fourth, the product characteristics of the full hydraulic drilling rig.
1. The main engine, pumping station and console of the drilling rig can be flexibly arranged according to the site conditions, with good disintegration and convenient relocation and transportation;
2. Mechanical automatic unscrewing and unloading of drilling tools, the gripper slip is easy to take out, and the diameter of the through hole is expanded, which is convenient for lifting and lowering the rough diameter drilling tool, which can reduce the labor intensity of workers and improve work efficiency;
3. The single cylinder directly feeds and pulls the drilling tool, which is simple in structure, safe and reliable, and has a large feeding and pulling capacity, which improves the ability of the drilling rig to deal with accidents;
4. Adopt double pump system, and the rotation parameters and feed process parameters are adjusted independently. The combination of variable oil pump and variable motor carries out stepless speed regulation, and the speed and torque can be adjusted in a wide range, which improves the adaptability of the drilling rig to different drilling processes;
5. The diameter of the through hole of the rotator is large, and the replacement of slip groups of different diameters can clamp the drill pipe of different diameters, and the length of the drill pipe is not limited by the structural size of the drilling rig itself;
6. Adjust the inclination angle of the fuselage with a support cylinder, which is convenient and labor-saving, safe and reliable;
7. Centralized operation through the console, personnel can be far away from the orifice at a certain distance, which is conducive to personal safety;
8. The hydraulic system protection device is complete, which improves the reliability of the drilling rig, and the hydraulic components are made of domestic advanced stereotyped products, with stable and reliable performance and strong versatility.
-
In view of the fact that the pressure relief treatment of roadway and gas pumping treatment projects is difficult and the efficiency of gas pumping treatment is low, Yikuang Technology has newly developed and produced mechanical cavitation equipment for coal mines.
Coal mine mechanical cavitation equipment is our company's invention patent product, patent number: the equipment adopts the principle of hydraulic mechanical ejector rod control, and is widely used in coal mine roadway rock formation reaming and cavitation relief, coal mine soft rock reaming support, rock burst treatment and roof cutting and pressure relief, as well as gas prevention and control hole bottom cavitation engineering of high gas pine coal seam.
The equipment adopts the principle of external hydraulic mechanical control, so that the all-round hydraulic crawler drilling rig can provide hydraulic ejector rod drive function, and arrange the corresponding control valve group, use the control valve group to control the hydraulic oil circuit and cooling water and wind, and match the long-distance high-thrust output of the thrust drive with the mechanical core rod drive drill pipe according to different construction needs, so that the mechanical reamer can be actively opened at the target position of the cavitation (patent number: actively open at the target position of cavitation, and actively close after the cavitation is completed. It greatly improves the level of control outside the hole of cavitation engineering.
The main advantages of this equipment are:
1. Hydraulic mechanical control, hydrostatic pressure water, no high-pressure pumping station can be used to complete cavitation;
2. It can be used for different geological conditions such as rock formations of F 12, with a wide range of uses, which can meet the needs of rock roadway cavitation pressure relief and coal seam cavitation construction;
3. The mechanical control of cavitation outside the hole greatly improves the success rate of cavitation engineering;
4. The construction cost is comprehensively reduced, and the construction efficiency is more than doubled.
-
Summary. 1. Scope of use 1. Scope of application: This operating procedure is applicable to the drillers and drillers of the ZDY4000LR hydraulic drilling rig produced in Jining Mine, and the drillers of gas extraction.
2. The driller shall complete the following work: (1) The driller shall be responsible for the gas extraction and drilling of the mine, and the drilling of coal seam water injection. (2) Coal seam water injection, gas extraction borehole sealing, etc.
3. Job conditions: Drillers must go through professional and technical training on drilling rig operation knowledge, pass the examination, and obtain safety qualification certificates and operation certificates before they can take up their posts.
Hello, I have seen your question and am sorting out the answer, please wait for a while 1. Scope of use 1. Scope of application: This operating procedure is applicable to the drillers of ZDY4000LR hydraulic drilling rigs made in Jining Mine, gas extraction drillers and other types of work. Let the driller complete the following work:
1) The driller is responsible for the gas extraction and drilling of the mine, and the drilling of coal seam water injection. (2) Coal seam water injection, sealing holes of Watankeys pumping boreholes, etc. 3. Induction conditions:
Drillers must go through the professional technical training of drilling rig operation knowledge, pass the examination, and obtain the safety qualification certificate and operation certificate before they can take up their posts.
Scope of application and function: It is suitable for the construction of full-section drilling in coal mines, and can also be used for the construction of multi-layer gas extraction holes, penetrating holes, water exploration holes and other purpose holes in the coal seam, and can also be used for the construction of large-diameter pressure relief holes. The inclination angle is virtual, the azimuth angle and the opening height adjustment range is large, and the degree of automation is high; Cross-belt drilling can be carried out; Embedded automatic anti-power head slip module, improve the safety of Yuhuigao construction; The hydraulic system is controlled by imported hydraulic parts and its cartridge valve, which has high reliability.
The modular design can meet the individual needs of users.
-
Summary. Pro, the operation method of ZDY4200LPS full hydraulic crawler drilling rig is as follows:1
Check whether the working environment of the equipment is safe and ensure that the equipment is free of faults and defects. 2.According to the requirements of the equipment manual, check all parts of the equipment, and carry out necessary repairs and maintenance.
3.Determine the working position of the drill rig and secure it to the ground to ensure that the equipment does not move during operation. 4.
Connect the equipment to the power supply and check the electrical and hydraulic systems. 5.Start booting the device:
First turn on the switch of the hydraulic pump, then press the "start" button on the controller, and the rig will start and enter the working mode. During the start-up process, attention should be paid to the parameters indicated on the dashboard to ensure that the device is working properly. 6.
Perform the drilling operation: The drill pipe is inserted into the borehole and the drill pipe is pressed down into the rock using a hydraulic system. During the drilling process, attention should be paid to observing the flow rate of the pressure gauge and cleaning mud pump to ensure the depth and quality of the borehole.
7.At the end of the drilling, the hydraulic pump is turned off and the drill pipe is pulled out of the borehole. According to the actual needs and equipment conditions, carry out the necessary cleaning and maintenance.
8.Power off the appliance and perform thorough cleaning and maintenance of the appliance to ensure that the appliance will work properly during the next operation. <>
<> operation method of ZDY4200LPS full hydraulic crawler drilling rig.
Pro, the operation method of ZDY4200LPS full hydraulic crawler drilling rig is as follows:1Check whether the working environment of the equipment is safe and ensure that the equipment is free of faults and defects.
2.According to the requirements of the equipment manual, check all parts of the equipment, and carry out necessary repairs and maintenance. 3.
Determine the working position of the drill rig and secure it to the ground to ensure that the equipment does not move during operation. 4.Connect the device to the power supply and check the electrical and hydraulic systems in the dust.
5.Start the device: First turn on the switch of the hydraulic pump, then press the "start" button on the controller, and the rig will start and enter the working mode.
During the start-up process, attention should be paid to the parameters indicated on the dashboard to ensure that the device is working properly. 6.Perform a drilling operation:
The drill pipe is inserted into the borehole and the drill pipe is pressed down into the rock using a hydraulic system. In the key of the brother cong drilling process, attention should be paid to observe the flow rate of the pressure gauge and the cleaning mud pump to ensure the depth and quality of the borehole. 7.
At the end of the drilling, the hydraulic pump is turned off and the drill pipe is pulled out of the borehole. According to the actual needs and equipment conditions, carry out the necessary cleaning and maintenance. 8.
Power off the appliance and perform thorough cleaning and maintenance of the appliance to ensure that the appliance will work properly during the next operation. <>
<> note: When operating the drilling rig, the safety operation procedures should be strictly followed to ensure personal safety. <>
-
Hello, ZDY4200LPS full hydraulic crawler drilling rig is a professional equipment used in coal source detection, mining engineering and other fields, with compact structure, flexible and stable performance. The following is the basic operation method of the drilling rig:1
On-site deployment: Lay a level work site at the designated location, move the rig smoothly to the job site, and firmly fix and adjust it according to the requirements. 2.
Prepare for the collision work: eliminate equipment failures and hidden dangers, ensure the normal operation of the hydraulic system, the fiber lubrication system, and the cooling system, and check the wear and condition of the cutter and drillHow it works:
The operation process is set according to specific requirements, generally including in, back, up and down; or up, up, down, down, etc.4Start drilling: adjust the position and direction of the drill bit, start the motor, control the feed speed and speed, and push the drill pipe into the borehole to ensure the stability and bearing capacity of the drill pipe
During the drilling process: according to the change of hole depth and drilling profile, adjust the speed and feed in time to ensure the quality and stability of the drilling hole6End of drilling:
After reaching the fixed drilling depth or meeting the neatness of the hole wall, turn off the motor, exit the drill pipe in an orderly manner, and clean up the impurities such as gravel and mud in the borehole.
-
Full hydraulic drilling rig model meaning.
Z stands for drilling rig, D stands for power head type, Y stands for hydraulic transmission, and the number represents the maximum rated torque.
-
Upstairs nonsense, the correct solution is: ZDY refers to the coal mine tunnel drilling rig, the maximum torque of the 3200 finger rotator is 3200Nm, and S is a split drilling rig.
This drilling rig is produced by Xi'an Coal Research Institute.
-
Z-Rig, D-Power Head, Y-Hydraulic, 3200 refers to the rig torque, S don't know.
-
Z-Drilling Rig, D-Actor Type, Y-Hydraulic Transmission, 3200-Max Rated Torque, S-Double Pump System.
The difference between the two is that their power is completely different, and in addition, they have been optimized for many functions, and the use effect is relatively better.
May I ask which model of yours is E420?,E420 is generally installed with a pre-installed genuine system,There is a Q disk in the computer above the computer,It is the backup of the system,So you don't need to back it up at all,As long as the Q disk is not destroyed,When you boot up,Press F11,Press the above prompts,You can restore to the previous home version。 Actually,There's no need to upgrade the computer to the flagship version.,You can't use more functions in it at all.,The computer is enough.,There's no need to chase the best system.,I'm using the home version.,I have my own key.,But I haven't upgraded.,You can enter the key in the windows anytime upgrade in the control panel to upgrade,Computer,Just use it.,The flagship version of the home version is the same! Hope it helps!
If it is a Siemens 300PLC directly call the proportional library FC105, it is OK to change the upper and lower limits. >>>More
I just have K420, K450 and S500, so to speak, 420 because it is an open-back headphone, suitable for listening to songs in a quiet environment such as home, and S500 because it is a closed headphone, the sound insulation effect is good when going out on the street, and the chuck problem is solved after changing the set. >>>More