1.Summary of planning indicators (economic and technical indicators);
2.Indicate the aboveground and underground planning setback lines of the building (setback road red line, setback land red line, and use the sunshine analysis diagram to show that the sunshine of the building on other plots has not been affected);
3.Indicate the spacing of each monomer in the total flat, the name of each monomer and the number of layers (can be listed);
4.Vertical design: indicate the elevation of the road outside the total level, the elevation of each control point of the road within the total level, and the elevation of the positive and negative zero points of each monomer;
5.The location of the main supporting and equipment room: property room, elimination control room, substation and distribution room, garbage room, etc.
-
Planning master plan (scale of 1:500, in special cases (such as large plot area), ratio of 1:1000):
1) The design content should meet the relevant mandatory requirements of the plan;
2) The general plan should be designed and laid out within the scope of the corresponding planning control line, and the status quo of land and roads outside the planning control line should not be changed without authorization;
3) The general plan should accurately reflect the number of building floors, the positive and negative zero elevation of the building, the site design elevation, the building spacing (including the half spacing with the land boundary and the full spacing with the building), the relationship between the building and the road, etc. The sloping building should fully express the vertical design and reflect the location of the design fort;
5) The various design lines of buildings, roads and environments on the general plan should be of different thicknesses and clear layers;
6) The buildings to be retained in the plot should be specially indicated;
7) The general plan must be consistent with the flat, vertical and section drawings;
8) The general plan shall express the list of technical and economic indicators of the general indicators and sub-indicators that meet the requirements (the index data must be true and accurate);
9) The qualification of the design unit shall meet the relevant requirements and be stamped and signed;
10) The content of electronic documents is consistent with that of paper documents.
Planning approval generally requires a general plan, architectural design plan (floor plan, elevation), renderings, land use red line map, land coordinates issued by the land surveying and mapping department, planning land use indicators, etc.
-
This is a lot of work to be done, as follows:
1.According to the documents you have obtained for the transfer of the plot, ask the planning or surveying and mapping department for a planning red line map, preferably a stamped blueprint with detailed coordinate points.
2.Ask for the planning and design conditions from the planning functional unit under the jurisdiction of your plot, or the planning index design conditions issued by the land department when transferring the plot. Ask about the depth of planning and design approval.
3.Entrust a qualified architectural design unit to carry out planning and design according to the above information, and need to meet the depth required for planning and design approval.
4.Take the completed planning and design drawings or texts (the depth requirements of each place are different), report to the planning and design department, the general planning department will hold a review meeting, and the review can be passed.
Good luck.
-
Yes, you have to refer to the fire protection code for building design, as well as the general rules for industrial building design.
-
The house structure of the building, the location of doors and windows, the size of the staircase position, the column network structure, etc.
-
Planning master plan (scale of 1:500, in special cases (such as large plot area), the ratio of 1:1000) crack beam clearing:
1) The design content should meet the relevant mandatory requirements of the plan;
2) The general plan should be designed and laid out within the scope of the corresponding planning control line, and the status quo of land and roads outside the planning control line should not be changed without authorization;
3) The general plan should accurately reflect the number of building floors, the plus or minus zero elevation of the building, the site design elevation, the building spacing (including the half spacing with the land boundary and the full spacing with the building), the relationship between the building and the road, etc. The sloping building should fully express the vertical design and reflect the location of the design fort;
5) The various design lines of buildings, roads and environments on the general plan should be of different thicknesses and clear layers;
6) The buildings to be retained in the plot should be specially indicated;
7) The general plan must be consistent with the flat, vertical and section drawings;
8) The general plan shall express the list of technical and economic indicators of the general indicators and sub-indicators that meet the requirements (the index data must be true and accurate);
9) The qualification of the design unit shall meet the relevant requirements and be stamped and signed;
10) The content of electronic documents is consistent with that of paper documents.
Planning approval generally requires a general plan, architectural design plan (floor plan, elevation), renderings, land use red line map, land coordinates before the land surveying and mapping department is issued, planning land use indicators, etc.
-
Planning permits, construction land use certificates, construction land permits, planning indicators and conditions attached drawings, feasibility study reports, and general planning plan indicators.
Article 64 of the Urban and Rural Planning Law stipulates that "if the construction project planning permit is not obtained or the construction is not carried out in accordance with the provisions of the construction project planning permit, the local people's ** urban and rural planning department at or above the county level shall order the construction to be stopped; Corrective measures can still be taken to eliminate the impact on the implementation of the plan.
Correction within a time limit, a fine of between 5% and 10% of the construction project cost shall be imposed; If it is not possible to take corrective measures to eliminate the impact, it shall be demolished within a time limit, and if it cannot be demolished, the physical object or illegal income shall be confiscated, and a fine of less than 10% of the construction project cost may be imposed concurrently".
-
The general plan is the most informative drawing in architecture, planning and design; During the design process, there is a master plan design at each stage. As the name suggests, the master plan is the master plan in the planning stage, which serves the approval of the construction detailed planning scheme.
Planning master plan: The planning department of ** in accordance with the national construction plan, according to the detailed regulations approved by the city or regional development control to a certain plot, issued ** to the plot of various index requirements restrictions.
Reporting refers to the design of the scheme submitted to the Planning Bureau for review and approval. Construction application refers to the construction application of engineering construction projects. Engineering construction project construction refers to the construction of the project by the construction unit or its first organization in the feasibility study report of the project or other project documents are approved, must be submitted to the local construction administrative department or its authorized agency for construction.
-
As the name suggests, the construction of the planning plan drawings is naturally in the planning drawing design stage; There are many things that are needed, first of all, planning permits, construction land use certificates, construction land permits, planning indicators and conditions attached drawings, feasibility study reports, planning plan general map index parameters, etc.
-
What do you mean by applying for construction, applying for planning permits?
One is the general floor plan, and the other is the outdoor comprehensive pipeline plan (which the planning bureau wants to demonstrate).
-
The drawings of the general plan plan are required to be provided when the construction detailed plan is approved, and the land use planning permit can be processed after the planning plan is approved.
-
EIA, after the project is established. For specific information, please go to the local planning bureau for specific information.
-
This is vague and generally related to the operational phase of the project.
1. The conceptual plan in the early planning stage, similar to the urban design, the construction detailed planning with the architectural concept plan, and the land acquisition plan in the land bidding, auction and listing stage. These stages are characterized by the fact that the investor body has not yet been determined, and the function of the building has not yet been clarified. The main problem to be solved by the conceptual scheme is to obtain the affirmation of external conditions and forms.
The client is generally the first management department, which often achieves different depths according to the requirements of different building types, and allows the selection scheme to be the mainstay.
2. Design the architectural scheme design in the bidding stage. This stage is very special, you might as well call it the game or drill stage of program design, and its requirement is to hand over the specified things in the prescribed format within the specified time. Needless to say, if you don't win the bid, whether you can use it if you win the bid also depends on luck.
3. Constructive detailed planning based on architectural scheme design, or planning and approval scheme. At this stage, the main body of investors has been established, the land indicators and planning conditions have been clarified, and the use function has been basically implemented. For details, please refer to the Ministry of Construction's Regulations on the Depth of Preparation of Construction Engineering Design Documents.
-
If you're asking about architectural design, there are three stages: schematic design, preliminary design, and construction drawing design.
If you ask about the schematic design of the building, there are no specific steps, according to the general situation, I will take a relatively large residential area as an example. First of all, our designer will contact Party A, accept the task, get the design task book, road red line map, planning points provided by the Planning Bureau, and then we will make the concept of the general plan as soon as possible, communicate with Party A, after the concept of the general plan is agreed, will be carried out to the house design, the house design is discussed, almost decided, on the modeling, that is, the façade design, after the shape is also determined, it will become a program booklet, reported to the Planning Bureau for program review, after the program review to make certain modifications, it is over,Finish the work.。。。 Hehe, I'm making a plan, so it's clearer.
-
Architectural design is generally divided into: schematic design, preliminary design, technical design, and construction drawing design!
-
Content from user: Education and Teaching Library.
Architectural design" from the characteristics and basic methods of architectural design, a comprehensive and vivid exposition of the key points of architectural design, the formation of the architectural plan, the modeling method of the architectural design, the determination of the architectural plan, the deepening of the architectural plan and the imagery of the building conception and other rich content, the following is the steps of the architectural design of the xx arrangement, let's take a look. 1. Read through the design task book 2. Review the problem and condition analysis 3. Preliminary concept 1. The focus of the task in the initial stage of the program: focus on the relationship between the entrance and exit of the site and the bottom of the map, and not fall into the consideration of the specific problems of the monomer.
2. The key tasks in the program generation stage: focus on the positioning of functional partitions and their interrelationships, the location of the hallway, the location of vertical traffic, and the location of the toilet. Can not fall into row rooms, MiG paper, calculate the room area.
3. Drawing method: freehand sketch (sketch can be drawn on the topographic map with a sketch paper). The lines are unrestrained.
4. Sketch form: symbols, bubble diagrams, block diagrams. 5. Drawing tools:
sketch paper; Rough pencil 4b. 6. Coordination and cooperation of hands and brains: Graphic thinking should be fast, and the speed of pen movement should be fast.
1. The key tasks in the scheme construction stage: determine the structural grid system, first the functional area, then the room space division, and gradually clarify the design problems. Don't get bogged down in detail.
The details can be divided in the final drawing or even in the formal drawing. 2. Drawing method: tool plus freehand sketch.
The lines are unrestrained. 3. Sketch form: grid, block diagram.
4. Drawing tools: sketch paper; Semi-thick pencil 4b. 5. Drawing scale: small scale.
-
According to the detailed planning.
The depth of the bai is required, and the residential area is built du
In the detailed planning, the design of the house is lower than the design of the construction plan. The main contents include, the proportion of the building, the area of the house, the basic design of the house, and the preliminary plan of the building. The preliminary plan needs to have a building plan, a house plan, the main façade of the building, a building shape, a style, and a section.
It is mainly a qualitative and quantitative arrangement, calculation, which is convenient for the later architectural design, as well as the basis for the design of the municipal infrastructure of the community, the arrangement of supporting facilities, and the basic conditions for land transfer.
-
Don't, mainly control the color of the building, the height of the building, and the direction of the opening of the building site.
It's interesting, I'll show you it. But there is only a plan, and you have to find a local foreman to refine it.
The major of architecture cultivates generalist and compound senior engineering and technical talents who have knowledge of architectural design, urban design, interior design, etc., can engage in design work in the design department, and have a variety of career adaptability. >>>More
I feel that even if the prospects of the architectural design industry are not very good, you should work harder to make your works more prominent, let others see your works, and let others admire your works, as long as your works have advantages, they will be used by more people, there is no unprofitable industry, this is the truth, as long as you are excellent, you will be outstanding.
His application in architecture is to include the aesthetic and creative of this move as well as the coordination of structures.