-
Whether the EIA report is a book, form or registration form is generally determined according to the type, scale and sensitivity of each industry to the shrinking environment in the "Catalogue of Classified Management of Environmental Impact of Construction Projects". Due to the large number of industry categories and too many detailed data, please refer to the "Catalogue of Classified Management of Environmental Impact of Construction Projects" on the Ministry of Environmental Protection of the People's Republic of China
**For the above are detailed provisions.
-
The Ministry of Environmental Protection of the People's Republic of China has issued a legally effective "Catalogue of Classified Management of Construction Projects" for the classification of construction projects, which stipulates which type of book and which type of table according to the degree of impact of various construction projects on the environment.
I'll post you a clip.
-
Determination of rank is not something that can be explained in one or two sentences.
The level of environmental impact assessment of each environmental element of a construction project is mainly divided according to the engineering characteristics of the construction project and the environmental characteristics of the area.
The engineering characteristics of the construction project mainly include: the nature of the project, the scale of the project, the amount and type of energy, water and other resources, and the characteristics of pollutant discharge, such as the type, nature, concentration of discharge, discharge, discharge direction, discharge mode, etc. The environmental characteristics of the area where the construction project is located mainly include:
Natural environmental conditions and characteristics, environmental sensitivity, environmental quality status, ecosystem functions and characteristics, natural resources and socio-economic environmental conditions, as well as the scope and degree of changes that may cause changes in existing environmental characteristics after the implementation of construction projects.
If you don't understand, you can communicate again.
-
The main differences are:
1. The EIA registration form can be filled in by the customer directly to the environmental protection department, without entrusting the EIA company, and the general approval is relatively fast, which is stipulated to be approved within 15 days;
2. For most of the small and medium-sized projects that have no pollution to the environment and only have an impact, the project unit entrusts the EIA company to prepare and prepare, and the time limit for general approval is within 30 days.
3. The EIA report for projects that are polluting and have a certain impact on the environment, in accordance with the regulations, the EIA company should be entrusted to prepare the EIA report, the requirements of the report are more complex, and the review needs to be carried out, and the time for approval is about 60 days.
1. According to Article 16 of the Law of the People's Republic of China on Environmental Impact Assessment, the state implements classified management of the environmental impact assessment of construction projects according to the degree of impact of construction projects on the environment. The construction unit shall, in accordance with the following provisions, organize the preparation of environmental impact reports, environmental impact report forms or fill in the environmental impact registration form:
1. If it may cause major environmental impacts, a report on the impact of environmental sensitive pure environment shall be prepared to conduct a comprehensive evaluation of the environmental impact;
2. If it may cause a slight environmental impact, an environmental impact report form shall be prepared to analyze or make a special assessment of the environmental impact;
3. If the environmental impact is very small and there is no need for environmental impact assessment, the environmental impact registration form shall be filled.
4. The classified management directory of environmental impact assessment of construction projects shall be formulated and published by the competent department of ecology and environment.
2. According to Article 17 of the Law of the People's Republic of China on Environmental Impact Assessment, the environmental impact report of a construction project shall include the following contents:
1. Overview of the construction project;
2. The current situation of the surrounding environment of the construction project;
3. Analysis, evaluation and assessment of the possible impact of the construction project on the environment;
4. Environmental protection measures of construction projects and their technical and economic demonstrations;
5. Analysis of economic profit and loss of the environmental impact of the construction project;
6. Suggestions for the implementation of environmental monitoring of construction projects;
7. Conclusions of environmental impact assessment.
8. The content and format of the environmental impact report form and the environmental impact registration form shall be formulated by the competent department of ecology and environment.
-
Let's make a report.
The EIA report, that is, the vertical source price of the environmental impact assessment.
The report is a predictive assessment of the impact of new construction, expansion and renovation projects on the environment. According to the monitoring of the groundwater and soil at the project site, the evaluation of the raw materials used in the project, the possible waste, and the design of the environmental protection equipment of the project are evaluated, so as to evaluate the impact of the project on the environment. "EIA"Yes, each project needs to complete the EIA report and report to the Environmental Protection Bureau.
After the EIA is reviewed by the Environmental Protection Bureau, it will be publicized on the ** (however, except for the love of the year that needs to be kept secret by the state.) Finally, an expert review will be organized, and the project can only start construction after the review is passed. The EIA report is very important to the enterprise, and after the EIA is reviewed and approved by the Environmental Protection Bureau, it will be used in the follow-up daily production and environmental protection management.
Without an environmental impact assessment, there is no way to carry out environmental protection completion acceptance.
The EIA report is aimed at whether the pollution occurrence and treatment measures are feasible in the production process of the project, and whether the production process and products are in line with cleaner production.
requirements, as well as an evaluation of the impact of the final discharged pollutants on the surrounding environment. The other party wants this thing is to understand whether your company's waste gas treatment equipment, product environmental performance and other conditions meet the current domestic or foreign environmental protection requirements, if not, it is generally believed that the production enterprise is problematic from the perspective of environmental protection, and the bidding of large projects will not be considered.
-
According to the "Classified Management Directory" of the State Environmental Protection Administration (see the State Environmental Protection Administration Huan Fa [2001] No. 17 document), the types of environmental impact reports, report forms or registration forms that should be prepared for construction projects are determined.
1. Preparation of environmental impact report project: new construction or expansion projects may have significant adverse effects on the environment, which may be sensitive, irreversible, comprehensive or unprecedented in the past.
2. Prepare the project of the environmental impact report form: the new construction or expansion project may have limited adverse effects on the environment, these impacts are small or the remedial measures to mitigate the impact are easy to find, and the impact on the environment can be mitigated by stipulating control or remedial measures.
3. Prepare the project that is writing the environmental impact registration form: construction projects that do not have an adverse impact on the environment or have little impact.
The procedure is different.
1) An environmental impact report shall be prepared.
1. The construction unit entrusts the EIA (a power of attorney is required);
2. The construction unit provides detailed information;
3. On-site inspection;
4. Sign the contract (determine the EIA funds and other contents);
5. The EIA unit prepares the EIA Outline;
6. The construction unit will submit the "EIA Outline" to the Environmental Protection Bureau for approval;
7. The EIA unit shall carry out field monitoring and investigation according to the approved EIA Outline (if necessary, conduct analogous investigation of existing similar projects);
8. The EIA unit conducts indoor analysis, sorts out data, calculates and prepares EIA reports;
9. The EIA unit completes the work and submits the EIA Report to the construction unit
2) An environmental impact report form shall be prepared.
1. The construction unit entrusts the EIA (a power of attorney is required);
2. The construction unit provides detailed information;
3. On-site inspection;
4. Sign the contract (determine the EIA funds and other contents);
5. The EIA unit formulates the EIA work plan;
6. The EIA unit conducts field monitoring and investigation (if necessary, conducts analogous investigation of existing similar projects);
7. The EIA unit conducts indoor analysis, sorts out data, calculates, and prepares EIA report forms;
8. The EIA unit completes all the work and submits the EIA report form to the construction unit.
3) The environmental impact registration form shall be filled.
1. Entrusted by the construction unit;
2. The construction unit provides detailed information;
3. On-site inspection;
4. Sign the contract (determine the work expenses and other contents);
5. The EIA unit shall collate, analyze and calculate the data, conduct analogy investigation if necessary, and fill in the environmental impact registration form;
6. The EIA unit completes all the work and submits the EIA registration form to the construction unit. 1. What is the difference between the content of the environmental impact assessment report and the report form?
According to the different environmental impacts, there are environmental impact assessment reports, report forms and registration forms, but how are their contents different?
-
I have a project to do an EIA, how do I know if I need to write an EIA report or an EIA report form?
Prepare an environmental impact report based on the degree of impact of your project on the surrounding environment, and the project that may cause significant environmental impact. For projects that may cause minor environmental impacts, prepare an environmental impact report form. The impact on the environment is very small, and Danian fills in the environmental impact registration form.
Specifically, you can check the "Classified Management List of Environmental Impact Assessment of Construction Projects", in which the registration form can be filled in by the enterprise, and the EIA report and report form need to be prepared by a professional EIA agency.
-
Enterprises need the following information to do EIA:
First, the materials for EIA handling.
1. Certificate of filing and registration of the development and reform department.
2. Land use certificate.
3. A copy of the business license.
5. A copy of the legal person's ID card.
6. Floor plan of the factory.
7. Neighborhood diagram.
8. Submit the EIA unit to prepare the EIA report.
9. After the EIA report is completed, it will be submitted to the environmental protection department for approval, and at the same time, it will be publicized online.
10. After the approval of the EIA report is completed, the project will start construction.
Second, the procedures for EIA.
1. After the construction unit submits the project application, the municipal (county) environmental protection bureau shall conduct environmental protection examination and approval in accordance with the capital construction procedures. After review, the relevant environmental protection part of the project proposal shall be determined, and the preliminary opinions on the project shall be determined; Approval of environmental impact statements; Review the environmental protection content of the feasibility study report or design brief; Review the environmental protection chapter in the preliminary design and issue preliminary design review opinions; Review the construction design drawings of the construction project, and issue the "three simultaneous" audit notices for the environmental protection of the construction project, so as to ensure that "the design is carried out at the same time, the construction is carried out at the same time, and the production is put into production at the same time".
2. Time limit for EIA procedures: sign the approval opinion within 3 days of receiving the environmental impact registration form; Sign the approval opinion within 5 days of receiving the environmental impact report form; Approval shall be given within 7 days of receiving the report on environmental impact; The review opinion will be issued within 1 month of receiving the preliminary design environmental protection chapter; Receipt of the "Three Simultaneous" Submission Form for Environmental Protection of Construction Projects and other documents and drawings submitted by the construction unit for review according to the requirements of the regulations shall be issued within 1 month; After receiving the trial production application report and related information, and after on-site inspection, it will be approved within 2 weeks; Approval shall be made within 1 month of receipt of the application materials for completion acceptance (including necessary on-site inspection).
3. Application materials for EIA procedures: schematic diagram of the geographical location of the construction project, the environmental impact of the construction project review and approval report, the schematic diagram of the project layout, the approval document of the project construction document or the filing approval document, the certificate of planning conformity, the certificate of enterprise name, the power of attorney of the first person, the environmental impact registration form of the construction project, and the permit procedure: acceptance - on-site investigation - registration form review - decision.
-
Dear, hello, I am happy to solve the problem for you, the difference between the environmental impact assessment and approval of construction projects and the approval report form of environmental impact assessment of construction projects Answer: The difference between the EIA report form and the EIA report is that the use is different: if the construction project may have a significant impact on the environment, the EIA report should be prepared to conduct a comprehensive and detailed evaluation of the pollution and environmental impact of the construction project.
If the construction project may have a slight impact on the environment, an environmental impact assessment report form shall be prepared to analyze or make a special assessment of the pollution and environmental impact of the construction project. If the environmental impact of the construction project is very small and there is no need for environmental impact assessment, the environmental impact registration form shall be filled.
The nature of engineering construction is divided into two categories. One is civil construction engineering, and the other is industrial engineering. >>>More
Legal analysis: the environmental impact assessment documents of the construction Chunchun project are determined, and the State Environmental Protection Administration is responsible for examining and approving the environmental impact assessment documents; For construction projects that need to prepare environmental impact report forms and environmental impact registration forms according to the regulations on the classified management of environmental protection of construction projects, the State Environmental Protection Administration shall entrust the administrative departments of environmental protection of the provinces, self-liquid control districts and municipalities directly under the Central Government where the project is located to examine and approve the environmental impact report form or environmental impact registration form. >>>More
1. Define from the perspective of investors or owners.
The cost of construction projects refers to the cost of all the investment in fixed assets and current assets of the expected or actual expenditure of a certain project in a planned way. That is, the reproduction and construction of fixed assets of a construction project are carried out in a planned manner to form the sum of the one-time investment costs of the corresponding fixed assets, intangible assets and working capital. >>>More
Obtaining the right to use state-owned land by way of allocation refers to the act of handing over the land to the land user for use after the land user has paid the land compensation, resettlement compensation and other expenses in accordance with the law after the approval of the people at or above the county level in accordance with the law, or the state delivers the land to the land user for use free of charge. >>>More
Single construction is an integral part of a construction project, with independent design documents, and can independently exert the production capacity or benefits specified in the design after completion. A single project refers to a group of complete engineering projects with separate design documents that can independently exert production capacity or benefits after completion. From the perspective of construction, a single project is an independent system, under the guidance of the overall construction deployment and management objectives of the project, it forms its own project management plan and objectives, and is completed and delivered on schedule in accordance with its investment and quality requirements. >>>More