Before the decoration, I would like to ask, what is the decoration process from the decoration of th

Updated on home 2024-08-15
11 answers
  1. Anonymous users2024-02-16

    First of all, the structure of the whole house needs to be planned, and then demolished, after the demolition to install the first air conditioner, on the installation of air conditioning and fresh air system after the start of water and electricity, if you want to install floor heating, but also in advance to get the floor heating, and then build the wall, and then carry out the overall style of building.

  2. Anonymous users2024-02-15

    It is necessary to roughly sort out and clean the blank house, and then measure the corresponding position with a ruler to leave free space, and then scrape the wall, pave the floor, etc., install some electrical sockets, and finally buy a suitable home for yourself, and electrical appliances can be.

  3. Anonymous users2024-02-14

    First of all, it is necessary to change the water and electricity, then lay the tiles, then scrape the wall, then the carpenter enters the site, and the rest is the soft package furniture and household appliances site, and then it is cleaned and ventilated for a period of time before you can move in.

  4. Anonymous users2024-02-13

    <> "What is the decoration process from blank to occupancy?

    The decoration process of the new house, the general process is like this, the main principle is to do the dirty work first, of course, according to the arrangement of the personnel to adjust, part of the process sequence can be adjusted.

    1. Design. 2. Demolition and alteration of the wall.

    3. Change water and electricity 4. Waterproof.

    5. Tile (wall first and then ground).

    6. Carpentry. 7. Scrape white paint.

    8. Kitchen and bathroom ceiling.

    9. Cabinet installation (kitchen and bathroom are best sewn first).

    10. Customized wardrobe is installed in the mountains.

    11. Paste wallpaper.

    12. Bedroom door installation.

    13. The switch is plugged in and installed with the accompaniment of the accompaniment.

    14. Hardware and sanitary ware installation.

    15. Beautiful sewing.

    16. Cleaning.

    17. Installation of lamps and lanterns.

    18. Curtain installation.

    19. Household appliance installation.

    20. Stupid installation next to home decorations.

  5. Anonymous users2024-02-12

    The steps and processes of the decoration of the rough room are as follows:

    Rough room decoration steps and processes:

    1.The tools are in place and ready to go.

    2.Determine the decoration area and wall size.

    3.Reasonable demolition and modification, clever use of space.

    4.Optimize the appearance of the pipe.

    5.Tiling, the first thing with a solid texture.

    6.Carpentry, bricklayer, oiler, carpenter, bricklayer, oiler.

    7.Wallpaper, beautiful walls.

    8.Install the socket panel.

    9.Kitchen and bathroom ceilings, seal the last unsightly part.

    10.Cabinets are installed, and a beautiful overall kitchen is born.

    11.Install the finished door.

    12.Install drying racks, curtain rods, lamps, sanitary ware, and bathroom hardware.

    13.Install the flooring.

    14.Install the radiator.

    15.Clearing and cleaning.

    16.Furniture and home appliances enter the market.

    17.Decorate with accessories, and the home has a taste.

    Q: Rough room decoration steps and processes:

    1. The main body is demolished and reconstructed, and the layout is reasonably planned.

    2. Hydropower transformation, reasonable positioning.

    3. Pave tiles.

    4. Wood, tile, oil.

    5. Install the socket panel.

    6. Kitchen and bathroom ceilings.

    7. Installation engineering.

    8. Furniture and soft decoration enter the site.

  6. Anonymous users2024-02-11

    Step 1: Site Visit.

    After receiving the house, the first thing to do is to confirm the floor plan of the rough house and imagine the general layout and style of the house. [To decorate, find Hujia].

    Step 2: Pick carefully.

    Choose a suitable renovation company and confirm that it can meet your construction plan.

    Step 3: Prepare materials.

    Prepare the tools and building materials needed for decoration, and it is not easy to shop around.

    Step 4: Carry out basic decoration according to the decoration plan, including wall demolition, wall demolition, wall building, shoveling wall skin, dismantling heating, replacing plastic steel windows, etc.

    Step 5: Hydropower transformation.

    Set a reasonable location according to the purpose, such as the location of faucets, switches, sockets, etc., to make life more convenient in the future.

    Step 5: Wood-tile-oiler enters the site.

    The carpenter is responsible for the carpentry work such as wrapping risers, decorating ceilings, and iron-gypsum lines; The bricklayer is responsible for and laying the floor drain; The oiler is responsible for the base treatment of the wall and the painting of the top coat.

    Step 6: Paste the wallpaper.

    After the wall paint is painted, the oiler will apply nitro paint to the place where the wallpaper needs to be pasted, and the paint will dry the next day, and then you can find a professional to apply the wallpaper.

    Step 7: Install switches, socket panels, water heaters, cabinets, other accessories, etc.

    Step 8: Collect the house and inspect the house.

    This step is extremely important, and no one would think that there will be inexplicable problems in the house that has been renovated for a long time.

    Step 9: Clean the house, keep it ventilated, remove formaldehyde indoors, and then you can buy furniture into the house.

    Decoration is looking for Hujia decoration. Hujia adheres to the tenet of customer satisfaction and the brand reputation as the guide; Based on excellent talents, with green.

  7. Anonymous users2024-02-10

    The decoration process of the rough house is generally as follows:

    1. Preparations:

    1. Inspect the rough room to determine the scope of decoration and decoration requirements2. Remove old decorative materials, such as brick walls, stones, wooden boards, etc.;

    3. Carry out the construction of water supply and drainage and electrical engineering;

    4. Make cement slurry layer or waterproof treatment on the wall, ground and top surface;

    5. Paste the reserved holes, prepare power supplies, lighting fixtures, sockets, etc.;

    6. Paint the outdoor wall;

    Second, the completion of the decoration:

    1. Install doors and windows;

    2. Paste wallpaper, latex paint, etc.;

    3. Install floors and ceilings;

    4. Install electrical appliances, such as air conditioners, water heaters, etc

    5. Install bathroom facilities;

    6. Install furniture, lamps, etc.;

    7. Tidy up the interior furnishings and complete the decoration project;

    8. Install a smart home system to improve the safety and comfort of the home.

  8. Anonymous users2024-02-09

    1. Measuring room and design.

    The first step in decoration is to measure the house, the designer will measure all the dimensions of the house, and then determine whether there is anything that needs to be changed in the whole space, and finally draw design drawings according to the house type and other conditions.

    2. Housing demolition and renovation.

    According to the drawings and, the walls of the house are demolished and modified by the construction personnel.

    3. Hydropower engineering.

    The renovation of water and electricity in the decoration is very important, and before construction, it must be confirmed according to the location of some equipment in the kitchen and bathroom, as well as the placement of furniture, so as to avoid the embarrassing situation that the socket is blocked by furniture.

    4. Carpentry. When doing carpentry at home, you must first design the size to ensure that the size data is accurate, and modern woodworking custom furniture is not cheap. More people tend to customize the whole, which is not only practical, but also more in line with the aesthetics of modern people.

    5. Mason. Masonry is a very important technical work in decoration, it looks simple, but inexperienced workers can not do well, masonry includes floor tiles, wall tiles, door stones and so on.

    6. Paint. Painting in the decoration is also very important, the wall should be painted several paints, and the leveling treatment should be done before painting, otherwise it is very unsightly after painting, if you want to paste wallpaper, you should pay attention to the wallpaper glue as much as possible to choose environmentally friendly materials.

    7. Installation of furniture.

    The last step is the installation of some furniture and electrical appliances, but also the installation of ceiling doors and windows, and finally the installation of hardware and sanitary ware, which is completed after installation, but can not be lived in immediately after the decoration, remember to wait for the formaldehyde content of the new house to reach the standard before you can move in.

  9. Anonymous users2024-02-08

    In the real estate renovation industry, both buyers and developers are of great interest to this question: which is more expensive, large flats or villas? This article will ** this issue and provide some real literature to support it.

    1.The background of the real estate market.

    Before getting into the specifics, we first need to understand the context of the current real estate market. According to market research firms, the real estate market has always been a dynamic one. Especially in the context of accelerated urbanization and continuous development of the national economy, the real estate market has maintained relatively stable growth.

    2.Definition of large bungalows with villas.

    Before discussing the differences between large flats and villas, we need to clarify their definitions.

    Large flats: Large flats refer to single-storey units located in multi-storey residential buildings, which often have a large usable area and are usually equipped with facilities such as public gardens and parking lots.

    Villa: A villa refers to a detached dwelling, usually a multi-storey or single-storey building, with private spaces such as private gardens, garages, etc.

    3.Factors influencing **.

    The difference between the large bungalow and the villa can be attributed to the following factors:

    Geographical location. The geographical location of the house is an important factor that influences. Villas tend to be more expensive in bustling commercial centers or upscale residential areas, while in remote areas, large flats can be more expensive.

    According to a report from a well-known domestic real estate appraisal agency, villas** located in the core areas of first-tier cities are usually more than 30% higher than large flats under the same conditions.

    Usable area. Another factor that influences ** is the usable area. Since villas usually have a larger usable area, large flats tend to be more affordable in comparison.

    According to a study published in China Real Estate magazine, the average villa** per square meter is about 15% higher than that of a large flat floor under the same geographical location and decoration standards.

    Decoration standards. A report released by the Real Estate Research Center of Tsinghua University pointed out that the decoration standard of villas is higher, compared to the decoration standards of large flats, which are more simplified, so the average ** of villas is higher than that of large flats.

    4.Conclusion.

    To sum up, the difference between the large flat and the villa is caused by a combination of factors. When choosing to buy a home or renovate, we should make a decision based on factors such as our own needs, financial strength, and location.

    It is important to note that the above conclusions are only general views and cannot be applied to every specific situation. In practice, buyers also need to make the best choice based on their own needs and financial situation.

    National Bureau of Statistics (2020).Report on the development of China's real estate market.

    Property Appraisal Agency A (2019).Comparative analysis report of villas and large flats in China's first-tier cities.

    Center for Real Estate Research, Tsinghua University (2018).Villa and large flat decoration standards and ** comparative research report.

  10. Anonymous users2024-02-07

    In the process of decorating the rough house, there are many things that need to be paid attention to, because there is nothing in the rough house, and you need to start the decoration all over again, so it is necessary to understand the decoration process of the rough house in advance, so what are the decoration distances of the rough house? What problems should be paid attention to in the decoration of the rough house? If you want to know, read on!

    1. What is the decoration process of the rough house?

    Housing design, main body demolition, water circuit installation, carpentry, wall painting, water heater installation, kitchen and bathroom ceiling, cabinet installation, range hood, wooden door installation, floor laying, switch and socket installation, lighting installation, sanitary ware, curtain rod, cleaning, furniture entry, household appliances, furniture accessories.

    Second, what problems should be paid attention to in the decoration of the rough house.

    1. When decorating the rough room, you can find that the kitchen and bathroom water pipelines are installed, but in most cases the faucet is not installed, you can pour a bucket of water into the water pipe to see if the water pipe is blocked. After the bathroom floor is waterproofed, a closed water test needs to be carried out, and whether there is a water leakage problem is observed after 24 hours.

    2. The wall and floor occupy a large area in the home space, so in the process of decorating the blank room, we must ensure that the wall and ground are flat, if the wall and ground are uneven, it will affect the laying of tiles in the future, and it is also necessary to check whether there is a hollow drum on the kitchen and bathroom wall.

    3. Most of the current commercial houses use plastic steel windows, so in the process of decorating the blank room, we should carefully check the window frame and glass of each room to see if there are scratches and sundries on the glass window, whether the window frame is not right, and whether the window is closed smoothly, so as to avoid problems in future use.

    Summary: The relevant content of what is the decoration process of the rough house is introduced here, I hope to help friends in need. When decorating the rough house, you must find a professional decoration company, because they have more experience in decoration and the decoration effect is better.

  11. Anonymous users2024-02-06

    Whether the owner chooses to report to the decoration company or decorate by himself, he must first understand the order of the entire decoration process, so as to prevent being deceived by the bridge decoration pit and ensure the quality of the decoration. So, what is the renovation process of the rough house? Let's take a brief look at it together.

    1. Before designing, it is necessary to measure first, clarify the size and area of each part, which is beneficial to the later selection of building materials and homes, in order to avoid space waste, it is recommended to find professionals to design, and make reasonable use of every inch of space.

    2. According to the design drawing, the link of wall demolition and modification, because it is a rough house, there are fewer walls that need to be demolished, mainly focusing on the overall framework.

    3. After all the frames are done, you can start to carry out the hydropower transformation link, pay attention to the direction of the hydropower line, the selection of hydropower materials, and the location of the switch socket, etc., especially in the kitchen, there are more electrical appliances, and try to reserve two sockets.

    4. The work of carpentry can be more or less, mainly depending on the number of customized furniture, if it is to buy finished cabinets and furniture, it may just be to make a door sleeve or something, and the amount of work is less.

    5. There is no conflict between tiling and carpentry, if the construction period is relatively rushed, you can let the plasterer enter the site when the carpentry is about to end, mainly complex window sills, floor drains and range hood installation.

    6. Brushing the top paint is to paint the cabinets before, and if you need to paste wallpaper, you also need to paint on the corresponding forehead wall to do a good job of grassroots treatment.

    7. When installing the kitchen and bathroom ceiling, pay attention to installing electrical appliances such as ceiling lights, bath bombs and exhaust fans at the same time to avoid rework.

    8. The cabinet is installed quickly, and it can also be equipped with a sink and a gas stove.

    9. Generally, the wooden door should be measured first, and then customized, so it is recommended that the owner who is in a hurry can make an appointment in advance.

    10. After the door is installed, you can start to install the floor, pay attention to the leveling when installing.

    11. Laying wallpaper may stain the floor, so the owner needs to protect it first.

    12. Install the switches and sockets reserved in advance.

    13. Installation of lamps and lanterns.

    14. Install the water and water pipe fittings, faucets, drying racks and other hardware parts in each area.

    15. Curtain rod installation.

    16. Pioneer cleaning is to clean the home.

    17. Arrange furniture and household appliances to enter the venue, and you can start preparing for moving in.

    18. Home furnishings are actually accessories, such as murals, table lamps, etc., which can be added slowly after moving in.

Related questions
6 answers2024-08-15

If you decorate the rental house, scrape the putty on the top of the wall and buy some simple furniture. For the floor can be covered with leather, in the future it is possible to remove the veneer or floor tiles. As for the bathroom, toilets and washbasins are a must, as long as they are durable. >>>More

5 answers2024-08-15

When we inspect the rough room, we go to check all the sockets in each room to see if all the sockets can be charged. It is also recommended that you check whether the wall and floor are relatively flat? If it is not smooth enough, there will be many problems when the subsequent decoration will be carried out. >>>More

8 answers2024-08-15

First of all, it is very important to know the budget for the renovation. Generally speaking, the cost of renovating a rough house will vary depending on the area, area, and decoration style. For the general rough house, if the ordinary mid-range decoration is adopted, the decoration cost is about 1500 yuan per square meter. >>>More

6 answers2024-08-15

The renovation budget list refers to the detailed list of various expenses required in the renovation process, which can help the owner to reasonably plan the decoration budget and avoid the financial pressure caused by cost overrun. Here are some introductions to the 120 square meter rough house renovation budget list. >>>More

9 answers2024-08-15

How much does it cost to renovate a 128-square-meter house; House decoration (all-inclusive) is the need to have decoration standards, because the decoration of the new house price is more or less: if you have good economic conditions, and want to improve the level of decoration a little better, you can decorate according to 2500-2800 square meters. If you want ordinary decoration, you can use about 1500-1800 yuan square meters, this kind of ordinary decoration. >>>More