What to do if the bidder s entrusted person is not present at the time of bid opening 5

Updated on society 2024-02-09
8 answers
  1. Anonymous users2024-02-05

    As long as the company has issued a power of attorney to prove that it participates in the bidding and bidding on behalf of the company, it can represent the company. At the bidding preparatory meeting, pay attention to the situation introduced by the tenderer, record it and bring it back to the company and hand it over to the leadership. When the bid is opened, arrive at the location on time, don't be late, record all the bidders announced, and do it according to the instructions of the host.

    Legal analysis. If the flow rate is much lower than the minimum flow rate to ensure accuracy, it will result in no output (e.g., vortex flowmeter) or the output signal will be cut off as a small signal (e.g., differential pressure flowmeter), which is unfavorable and unfair to the supplier. In order to prevent the loss of benefits, for a specific set of thermal energy metering equipment, the supply and demand parties often agree that a certain flow value is "agreed lower limit flow" according to the flow measurement range and the range that can be achieved, and if the actual flow rate is less than the agreed value, the lower limit of the charging flow will be charged.

    The people's metrology administrative departments at or above the county level may set up metrological verification institutions as needed, or authorize other units of metrological verification institutions to carry out compulsory verification and other verification and testing tasks. Personnel who perform the verification and testing tasks provided for in the preceding paragraph must pass the assessment. This function is usually implemented in flow meters.

    According to the needs of the region, the local people's measurement administrative department at or above the county level shall establish social public measurement standard instruments, which shall be used after passing the examination by the people's measurement administrative department at a higher level. Enterprises and institutions may establish the measurement standard instruments used by the unit according to their needs, and the highest measurement standard instruments shall be used after passing the examination presided over by the relevant people's measurement administrative department. Metrological verification work should be carried out in accordance with the principle of economic reasonableness and in the nearest place.

    Metrological verification must be carried out in accordance with the national metrological verification system table. The national metrology verification system table shall be formulated by the administrative department of metrology.

    Legal basis. Tendering and Bidding Law of the People's Republic of China Article 9 If the bidding project needs to perform the project approval procedures in accordance with the relevant provisions of the State, it shall first perform the examination and approval procedures and obtain approval. The tenderer shall have the corresponding funds for the bidding project or the funds have been implemented, and shall be truthfully stated in the bidding documents.

  2. Anonymous users2024-02-04

    Hello this friend :

    You asked: What should I do if the bidder and the entrusted person are not on site when the bid is opened?

    Answer: If the bidder's entrusted person is not on site when the bid is opened, and the legal representative does not arrive at the site, it will be treated as a waiver of bidding qualifications.

  3. Anonymous users2024-02-03

    1. If the authorized principal is not present and the legal person is present, the bid is still valid.

    2. If the authorized principal is not present, and the legal person is not present, it will be treated as a waiver of bidding, and the bidding documents will not be opened and returned in good condition.

  4. Anonymous users2024-02-02

    Hello, by whom will be delivered to the site? It does not affect the role and value of your bidding documents1Under normal circumstances, the bidding documents that people look at are to see whether your bidding documents are compliant, legal, true and valid.

    That is to say, the relevant content of your bidding documents must be certified by your company, such as all seals, and the information can be queried. The authorized principal only guarantees the right to deliver this document, but for the matter of service, there is no need to issue a formal entrustment agreement separately, as long as the authorized person is present, or he agrees to this matter, the bidding documents are feasible2Of course, it is not excluded that there are other problems, for example, the tendering unit strictly stated in our bidding documents that the authorized person must be qualified to participate in the bidding activities or submit documents, and others are not allowed to qualify.

    At this time, the validity of the bidding documents will be affected. They can reject this document directly3We say that in general, if the entrusted person explains the situation clearly, then the submission of documents will not be affected at all.

  5. Anonymous users2024-02-01

    Legal Analysis: Non-electronic bid evaluation must arrive! According to the requirements of the bidding documents, call the group. Some bidding documents require that the presence of a legal person, some is a builder, and some legal person builders must be present.

    Legal basis: Social Insurance Law of the People's Republic of China

    Article 29 The part of the medical expenses of the insured persons that should be paid by the basic medical insurance** shall be directly settled by the social insurance agency and the medical institution and the drug business unit.

    The administrative department of social insurance and the administrative department of health shall establish a system for the settlement of medical expenses for medical treatment in other places to facilitate the insured persons to enjoy basic medical insurance benefits.

    Article 30 The following medical expenses are not included in the scope of payment of basic medical insurance**

    1) It should be paid early from the work-related injury insurance**;

    2) It shall be borne by a third party;

    3) It should be borne by public health;

    4) Seeking medical treatment outside the country.

    Medical expenses shall be borne by the third party in accordance with the law, and if the third party does not pay or the third party cannot be determined, the basic medical insurance shall pay in advance. After the basic medical insurance** is paid in advance, it has the right to recover from a third party.

    Article 31 According to the needs of management services, the social insurance agency may sign a service agreement with a medical institution or a drug business unit to standardize the conduct of medical services.

  6. Anonymous users2024-01-31

    1. From a legal point of view: as long as the authorization items are clear, the authorized person seals, the legal person signs, the authorized person's signature, the date and other key points meet the requirements, then the authorization is established and has legal effect.

    2. From a practical point of view: you can also participate in the bidding preparation and bid opening activities, but remember to bring the original power of attorney, a copy of the ID card and the original ID card, and the people of the bidding company will not and cannot check your employee ID card or labor contract. Where:

    1) In addition to bringing the power of attorney and certificates, it is recommended that the company arrange technical engineers to participate in the bidding meeting, so as to have a clearer understanding of the technical requirements of the project bidding.

    2) The same is true for bid opening, in addition to bringing all the information and arriving at the bid opening site in advance, there is nothing mysterious about signing and confirming the content of the bid opening.

    3) From the information you provide, from my bidding experience, it is inferred that there are 51% of the following possibilities: a this project is that you have multiple companies to bid, b you submit the bidding documents of the company to accompany the bid, and there is a 50% possibility that the bidding is just a process.

    So, you don't have to be so nervous.

  7. Anonymous users2024-01-30

    OK.

    Purchaser:**Article 40 of the Administrative Measures for the Bidding and Bidding of Procurement of Goods and Services:

    The bid opening shall be presided over by the purchaser or the procurement agency, and the bidder shall be invited to participate.

    Bidder:**Administrative Measures for Bidding and Bidding for Procurement of Goods and Services (Decree No. 87 of the Ministry of Finance) stipulates:

    If the bidder does not participate in the bid opening, it shall be deemed to have approved the bid opening results.

    That is to say, it is the right of the bidder to participate in the bid opening process, and it is up to the bidder to decide whether to participate.

    The Notice on Promoting Fair Competition in Procurement and Optimizing the Business Environment (Cai Ku 2019 No. 38) clearly stipulates:

    For the excavation of Jing Wei, the legal representative of the first business, who has issued a power of attorney, shall not require the representative of the legal person of the first business to purchase the procurement documents in person or participate in the bid opening and negotiation on the spot.

  8. Anonymous users2024-01-29

    According to the requirements of the bidding documents, some of the bidding documents require that the presence of a legal person, some is a builder, and some legal person must be present.

    Chapter 4 of the Bidding Law of the People's Republic of China Bid opening, bid evaluation and bid winning Article 34 The bid opening shall be carried out publicly at the same time as the deadline for submitting bidding documents determined in the bidding documents, and the place of bid opening shall be the place predetermined in the bidding documents.

    Article 35 bid opening by the tenderer presided, invited and invited all bidders to participate.

    Article 36 when the bid is opened, the bidder or its elected representative to check the sealing of the bidding documents, can also be checked and notarized by the notary public entrusted by the tenderer, after confirmation, by the staff in public to open the seal, read out the name of the bidder, the bidding ** and other main content of the bidding documents.

    All bidding documents received by the tenderer before the deadline for submitting bidding documents required by the tendering documents shall be unsealed and read out in public when the bid is opened. The bid opening process shall be recorded and archived for future reference.

Related questions
14 answers2024-02-09

Once rescued, press your hand on your chest @ down, push forward and down (causing exhalation), let go (cause inhalation), and repeat and rhythmically until breathing is restored.

13 answers2024-02-09

The full name of PV in English is Process Value

The full name of SP in English is Set Point (refers to the set value of PID control). >>>More