The advantages of bidders must be known to the tenderer at the first time in order to leave a good first impression. Refer to:
1. Establish a capable and efficient project management organization.
Scientific management, reduce management levels, reduce management expenses, carefully organize, scientific planning, and benefit from science and technology and construction management.
2. Use network technology to correctly guide the construction progress and labor allocation, and reduce labor costs. The project will be based on the progress of the works.
The amount of work and the type of work need to be dynamically managed by the labor force, starting from the cultivation of workers' dedication to their jobs, and efforts are made to promote new technologies, new processes and new equipment to save working hours to the greatest extent.
3. Strengthen the management of engineering materials, control materials, and reduce the cost control of material costs.
It is one of the effective ways to reduce the cost of the project.
4. Strictly control the selection and purchase of engineering materials and equipment. All materials are selected from qualified products, never shoddy, old instead of new, to ensure that the quality of materials used in the project is excellentPurify the circulation link, choose a reasonable transportation method in accordance with the construction unit.
The requirements for the total construction period, combined with the construction organization design.
It is necessary to carefully arrange the number of materials used at each site, formulate a feasible transportation plan, arrange the construction in stages, processes and steps, and reasonably arrange the construction step by step, so as to achieve one step in place each time the material is transported and reduce the cost of secondary reloading.
5. Strengthen the management of machinery and equipment, configure machinery and equipment with good performance and advanced technology, and reduce the cost of machinery use.
6. Strengthen safety and quality management.
Eliminate the occurrence of all kinds of accidents, reduce project costs, strengthen on-site safety and quality target management, conscientiously organize the implementation of safety and quality management measures, and implement the right of veto on safety and quality.
The official website shall prevail.
-
First, it has the advantage of talents, focusing on how many senior and intermediate professional titles the company has, and how many registered practice qualifications.
Second, have a certain business ability, focusing on how much performance, the total amount of performance, the distribution of performance, the distribution of industry, etc.
Third, how much equipment and machinery there are, such as tower cranes, excavators, road rollers, pavers, mixer trucks, etc.
Fourth, it has certain soft power, such as ISO9001 quality certification, national and provincial science and technology awards, invention patents, etc.
-
1. Target selection.
The goal of bidding is to bid for a specific way of operationMake use of their own business conditions and advantages, and strive to achieve the interests through competitive means. This interest objective is the concrete embodiment of the guiding ideology of the bidder's operation, and it is also the core element of the bidding strategy and the basis for selecting competitive countermeasures and skills.
2. Method selection.
After the bidding target is determined, it is very important for the bidder to use the correct strategy and method. Starting from the basic purpose of production and operation, generally speaking, the bidding unit adheres to the principle of profit, that is, the bidding selection with profit as the main goal, and the selection of other targets is only temporary, partial, and its long-term goal is inseparable from the ultimate goal of achieving maximum economic benefits.
3. Form selection.
The form of project bidding depends on the way it is contracted, that is, it depends on the form of economic relations between the bidding and the bidding parties, and different contracting methods determine different forms.
-
The advantages of the bidder in the corresponding business are written as follows: with talent advantages, focusing on how many senior titles the company has.
Intermediate title personnel, how many registered practice qualifications, imitation source jujube personnel, etc.; Have a certain ability to divide the industry, focusing on how much performance, the total amount of performance, the distribution of performance, the distribution of industry, etc.; How much equipment machinery has, such as tower cranes.
excavators, rollers, pavers, mixers, etc.; It has certain soft power, such as ISO9001 quality certification.
Won national and provincial science and technology awards, invention patents, etc.
"Business" is more vernacular, it refers to the transactions that need to be handled in various industries, but it usually refers to the affairs of sales, because any company unit is still ultimately focused on selling products, selling services, selling technology, and so on. The ultimate purpose of "business" is to "sell products in exchange for profit". Therefore, it is common to equate a salesman with a salesperson, which is why the business is to carry out or deal with business-related activities.
Business is also a channel, which means that the relationship between the producer and the sales point is established through the channel. And the salesman plays a major role in this. The work of the salesman directly affects the relationship between the producer, the sales point and the consumer.
Bidders shall be in accordance with the bidding documents.
requirements for the preparation of tender documents.
The bidding documents shall respond to the substantive requirements and conditions put forward in the bidding documents. The basic practice of bidding: the bidder first obtains the bidding documents, carefully analyzes and studies (on the spot for demolition inspection), and prepares the bid.
The tender is essentially a valid until the date of opening the bid or the preliminary preparation of the group, the content must be very clear, after winning the bid and the tenderer to sign the contract to contain the important content should be all included, and within the validity period shall not withdraw the tender, change the tender ** or make substantial modifications to the content of the tender. In order to prevent bidders from withdrawing their bids after bidding or refusing to sign contracts after winning the bid, tenderers usually require bidders to provide a certain percentage or amount of bid deposits.
-
Summary. 1.Introduce the basic information of the unit, such as the name of the unit, business scope, bidder, etc., so that the tenderer has a basic understanding.
2.Introduce some understanding of the bidding project, good creative design and other highlights 3Express your desire to win the bid and make a commitment.
In the bidding process, our company should reflect the advantages of our company, from what aspects?
1.Introduce the basic information of the unit, such as the name of the unit, business scope, bidder, etc., so that the tendering party has a basic solution. 2.
Introduce some understanding of the bidding project, and the creative design of the good return to the excavation and training and other highlights 3Express your desire to win the bid and make a commitment.
Many people are in the bidding process, here is a summary of the main process and precautions for bidding: 1. Pay attention to the bidding announcement and look for the target project; 2. Prepare registration materials according to the requirements of the tender announcement; 3. To register for bidding, and be reviewed according to the registration; 4. Sign up for the bidding documents, drawings and work list within the specified time; 5. Organize relevant personnel to prepare bidding documents according to the specific requirements of the bidding documents; 6. Submit the bidding documents to the bidder within the specified time 7, pass the bid opening, bid evaluation, bid awarding, and bid winning publicity, and wait for the notice of winning the bid;
-
This question shows that the tenderer wants to know the advantages and disadvantages of your unit, and changing the direction is also an opportunity for you to promote yourself.
1. Explain as many advantages as possible (but there can be no explanation of the disadvantages, you can find a disadvantage that does not hit the disadvantage of the difference, and you can explain the skin annihilation).
2. From the requirements of the tenderer in the bidding documents, summarize the importance of the tenderer to the bidding project, and introduce and explain it in combination with your company's existing advantages and resources.
-
The format of the bid will be given in the general bidding documents, among which:"Other materials", you can think that it is your own advantage to guess the destruction of the material classification can be included (note, should be attached to the relevant proof of the ear stuffy material, such as certificates, certificates, etc., the original sweep car depiction is better)!!