Is the Sanba Nuclear Power Plant no longer repaired, and there has been no movement after so many ye

Updated on society 2024-02-09
23 answers
  1. Anonymous users2024-02-05

    To be built, Sichuan's *** confirmed. However, the state has not yet approved. The boss of CGN may have some impact if there is a problem, and some work has been carried out at the local level.

  2. Anonymous users2024-02-04

    It is impossible to complete the construction in three years.

  3. Anonymous users2024-02-03

    Which one said It's all planned, have you been to our Wusheng?

  4. Anonymous users2024-02-02

    According to the plan, the planned capacity of the Sichuan Sanba Nuclear Power Plant is 4 million kilowatts. Preliminary preparations are still going on normally and will not be left unrepaired, but they have been postponed due to the impact of the Fukushima nuclear leak and the need to improve the safety system.

  5. Anonymous users2024-02-01

    It's not that it won't be repaired, it's just that Japan's nuclear radiation has caused the state to re-inspect the nuclear power plants that have been repaired and are being built, and to suspend the approval of projects that are being approved.

  6. Anonymous users2024-01-31

    I'd love to know about that as well.

  7. Anonymous users2024-01-30

    The state has decided on the Sanba Nuclear Power Plant as soon as possible, and it will be a waste of time to start construction and delay it immediately.

  8. Anonymous users2024-01-29

    It is unlikely that the approval of inland nuclear power plants will resume in the short term (5 years).

  9. Anonymous users2024-01-28

    It's 2018, and it should be cool

  10. Anonymous users2024-01-27

    Should be expected in a limited way is not anymore.

  11. Anonymous users2024-01-26

    It's no fun that Wenchuan ** in Sichuan has only been around for a few years, and the location seems to be problematic now.

    I don't know what year or month the approval of the inland nuclear power plant was.

  12. Anonymous users2024-01-25

    Analysis: Loose teeth are not calcium deficiency.

    Advice: Loose teeth means that the degree of loose teeth exceeds the normal physiological range. Loose teeth can be caused by a variety of reasons.

    It is mainly due to the following reasons, one is the change of the tissue around the tooth root, the second is the shortening of the absorption of the tooth root itself, and the third is caused by trauma! Generally there is nothing to do with calcium deficiency! Maintain oral hygiene and have regular dental check-ups!

    Fan Rongqiang - Linfen Hospital of Traditional Chinese Medicine, Shanxi Province.

    Other. Physician.

  13. Anonymous users2024-01-24

    It should not be moved before 2020, and the specific time of repair depends on the local development plan and the national energy development plan.

  14. Anonymous users2024-01-23

    I've heard that it won't be repaired, but there are also people who say it's being replanned. I haven't repaired it for so many years, and it feels like it's been a long time to fix it. Even if it is to be repaired, it should be affected by the nuclear leakage, which should reduce the risk and increase safety.

  15. Anonymous users2024-01-22

    Affected by the planning of the nuclear power plant, the infrastructure of the three dams has not developed much in recent years, and the road was only built at the end of last year! I participated in the basic survey of the three dams nuclear power, and I heard that the construction of the first nuclear power plant in the inland will start two years later, and it may be the three dams!

  16. Anonymous users2024-01-21

    The Sanba Nuclear Power Plant is the first nuclear power plant to be built in Sichuan Province, and the site is selected in Sanba Township, Peng'an County, Nanchong City, and the Sanba Nuclear Power Project is still suspended.

  17. Anonymous users2024-01-20

    There is no harm in everything, has there been a water and electricity outage in your house?

  18. Anonymous users2024-01-19

    There are uranium deposits in Nanchong. But I don't know, you know, no. Nuclear power requires a lot of water to cool the core. But the cooled water is radioactive. At present, China's nuclear power plants are built along the coast.

  19. Anonymous users2024-01-18

    Before Japan's 311** and Fukushima accidents, Nanchong was in the project approval stage. After that, China suspended the approval of nuclear power projects, especially inland projects, and put them on hold for the time being. The specific timing depends on the national policy. It will not be repaired at this time.

  20. Anonymous users2024-01-17

    I will still repair it.

    It's just that now everyone is very opposed, thinking that building a nuclear power plant will have radiation and affect people's bodies.

  21. Anonymous users2024-01-16

    To see 13 five periods to see *** to approve not.

  22. Anonymous users2024-01-15

    The state's confidential documents will not be repaired for the time being.

  23. Anonymous users2024-01-14

    It is said that it will not be repaired, and it is difficult to build a new house in the three dams ten years ago, and it is even more difficult to settle down, since the nuclear leak in Japan, the house is also allowed to be repaired, and there is no clear saying that it will not be repaired, but judging from these policies, it may not be repaired again, and even if it is to be repaired, it will take a long time. There is also a situation learned from Sichuan Dongfang Electric Boiler (specializing in nuclear power boilers), at present, all domestic nuclear power projects are almost stagnant, and I don't know how long it will take to recover.

Related questions
10 answers2024-02-09

<> present, there are 17 nuclear power plants and about 40 nuclear power reactors in Germany. >>>More

23 answers2024-02-09

= Lu Bu in the people, and the red rabbit in the horse refers to the bravery of Lu Bu. >>>More

4 answers2024-02-09

The appearance of *** also varies from person to person.

Regular check-ups. >>>More

12 answers2024-02-09

1. Screw twisting traces, generally speaking, refurbished machines will also pay attention to this problem, but there are a certain number of refurbished machines in this regard. >>>More

14 answers2024-02-09

Decision cards. The owner of the judgment card is the character who made the judgment. The judgment card usually resolves after being revealed (from the top of the pile), then takes effect (it has the effect of making a delayed trick or certain ability work or not), and then it goes to the discard pile (unless otherwise noted). >>>More