-
Single-piece flow is also called unit synchronous flow, single-piece flow is the comprehensive and effective use of personnel, equipment, logistics, organized, planned, and targeted progress of each unit to balance production. In the production activities, the production batch is a batch, there is no stagnation between the front and rear processes, and each process is completed with self-inspection and a process, and the production mode of transmitting a process is called a flow of production mode, referred to as a single piece flow.
Characteristics of a single piece of flow:
1. Target management: production capacity targeting, and industrial engineers set the target capacity of each unit (process) of the product; 2. Time management: time quantification, and the industrial engineer sets the target operation time for each unit (process) of the product;
3. Fast production of finished products, rapid response to quality problems, and zero batch quality accidents;
4. Forward and backward pull type: it is different from the traditional production mode, the traditional production mode, the production line is passive, and can only wait for the materials, cutting, embroidery, and printing of the front department to determine the normal operation of production, while the single-piece flow production is in the initiative, and the front process must meet the production line, all for the sake of production. Forward push, not only on the flow of forward, it includes orders, materials, product reprocessing.
The post-pull is to meet the needs of customers and pull the whole production and the first chain.
-
A single piece of flow is a production line, starting from the line, each person does a process, to the last person, a piece of clothing is ready. Such an assembly line is very efficient, and there is no need to move around. When this process is done, it will automatically move on to the next process.
According to the usual practice in the past, it takes 2 to 3 days from the time the clothes are made online to the time when they see the finished product.
But according to the flow of a single piece, the finished product can be seen on the same day.
-
The production of the garment industry has been in a traditional way for many years, and it is more common to use the "baling" operation. The basic situation of this method is that the sewing process of a product is broken down into several processes, each of which is made by one or a group of workers. In each process from the front to the back, each person sews multiple products in a concentrated manner, and then passes the processing one by one in a "packing" method to complete the entire product.
The form of "single piece flow" is to subdivide the production process of a garment into multiple processes, arrange according to the pre-prepared "man-machine station layout drawing", and complete the "single piece flow operation" from front to back. Each operation unit post completes a relatively single production content according to the requirements of the "personal kanban" (work instruction), forming a continuous operation form of "one process after another, one product after another".
-
The garment assembly line generally adopts automatic hanging system or manual transmission or mechanical conveyor belt, which generally has the following characteristics:
Single-piece flow synchronicity.
Balance the basic requirements of organizing the production process of the garment assembly line.
Continuity: refers to the continuous flow of products between various processes, closely connected in the world, and always in a state of motion.
Proportionality: refers to the appropriate proportional relationship between the stages of the production process and the production capacity.
Parallelism: refers to the fact that the various production activities of the production process are carried out in parallel as much as possible in time.
Rhythmic: It refers to the production of the same number of products in the same amount of time in each production link, and the load of each working place is relatively stable, so that there will be no loose and tight, loose before and then tight, or tight before and then loose.
You don't have to have someone to love, but you have to love someone well! >>>More
The feelings that are full of money are the ...... reality
Broken bridge aluminum is heat-insulated broken bridge aluminum. Thermal insulation bridge aluminum is a non-metallic low thermal conductivity separator sandwiched in the middle of the aluminum profile, which can obtain excellent thermal insulation performance of the aluminum profile, this is because the heat conduction is blocked when the heat is conducted to the non-metallic isolator through the aluminum alloy with excellent thermal conductivity, and the heat can not be transferred to the inner wall, such aluminum is called broken bridge aluminum. A broken bridge means that heat energy can be transferred indoors and outdoors. >>>More
A piece of music leads to a series of thematic variations based on a self-contained theme, called variations, and these thematic variations are called variations, which allow the theme to be played in many ways through different variations. There are many ways to play variations, such as melodic variations, harmonic variations, etc. >>>More
There are two good 1s: The summoner is very slow to brush in the early stage to form a team, but it's good to brush from level 30, there are a lot of babies, it's safe to brush, and PK is good! But at the same time, team up to swipe the card! >>>More