-
After the completion of the project, the planning acceptance can be carried out, and the planning acceptance conditions are:
Basis for approval: Paragraph 1 of Article 45 of the Urban and Rural Planning Law of the People's Republic of China, "the competent department of urban and rural planning of local people at or above the county level shall verify whether the construction project meets the planning conditions in accordance with the provisions of the People's Republic of China." Without verification or verification does not meet the planning conditions, the construction unit shall not organize the completion acceptance.
Examination and approval conditions: The construction unit shall complete all the construction content in accordance with the requirements of the "Construction Project Planning Permit", the approved construction drawings and the environmental design. Application Materials:
1) One copy of the application, the applicant's main qualification certificate, the power of attorney and the basic description of the project.
2) 1 copy of the "Construction Project Planning Permit" (original review) and 1 copy of the general plan of the attached drawings.
3) If the construction drawings are changed, 1 copy of the "Construction Project Planning Change Opinion" (original review) and 1 attached drawing are required.
4) 1 copy of the construction project environmental design review opinion (original review) and 1 copy of the attached drawing.
5) 1 copy of the single experience receipt opinion (original review).
6) 2 copies of comprehensive as-built survey data.
7) In the previous link, our bureau's examination opinions and drawings were attached.
Go to the local planning bureau for consultation, get a form, and with the above content, you can organize the acceptance.
-
At the time of completion and acceptance of the project, it is necessary to apply to the Planning Bureau for planning acceptance, and if the planning acceptance is unqualified, it means that the project construction violates the planning requirements, even if the quality of the project acceptance is good, it is not allowed to complete the acceptance for the record, and it is necessary to rectify to meet the planning requirements before the planning acceptance is qualified, and then the project acceptance can be completed and accepted for the record.
-
Legal analysis: the acceptance of the project quality is the local quality supervision station, the fire inspection is the local fire bureau, the environmental acceptance is the local environmental protection bureau, the anti-coarse state lightning acceptance is the local meteorological bureau, and the energy-saving acceptance is the acceptance of the actual construction area and floor height of the local wall renovation office and the planning bureau.
Legal basis: Civil Code of the People's Republic of China
Article 788: A construction project contract is a contract in which the contractor carries out the construction of the project and the employer pays the price.
Construction contracts include engineering survey, rock shelter design, and construction contracts.
Article 789 The construction project contract shall be in written form.
Article 790: Bidding and bidding activities for construction projects shall be carried out openly, fairly and impartially in accordance with the provisions of relevant laws.
-
Planning acceptance focuses on planning requirements, building functions and indicators, built environment and image, and ancillary services and services. The planned acceptance is a part of the completion acceptance of the project, which is usually reviewed by the quality supervision station, then the scheme acceptance, and finally the joint acceptance, and the quality inspection and evaluation of the construction project is an important link, which directly affects the safety and stability of the entire construction process.
The location of the selected building, the size of the area, the distance to the setback, including the red line, the green line, the yellow line, the blue line, the purple line, etc., the layout of the building, the spacing between each building, the evacuation distance, and the layout of the entrance and exit of the building.
The purpose of the building, the construction area, and the number of floors are all different, and the height of the building, the density of the building, the floor area ratio of the building, the green space rate, the berths, etc., are all determined according to the style of the building. Socks are whirring.
The form of the building, the color of the exterior, the material, the advertising of the façade, the green space, the sculpture, the fountain, etc., must have temporary facilities and construction sites.
Roads between buildings, perimeter walls around buildings, gates for each building, underground parking, public toilets, garbage dumps near buildings, and various pipes.
The special acceptance before the completion acceptance includes: environmental protection acceptance (Environmental Protection Bureau), fire protection acceptance (Fire Bureau), energy-saving acceptance (wall reconstruction), planning acceptance (Planning Bureau), and lightning protection acceptance (Meteorological Bureau).
1. Check whether the project is constructed in accordance with the design documents, and whether it is carried out at the same time as the construction of supporting and auxiliary projects of the project.
2. Inspect the quality of the project to ensure that the quality of the project meets the relevant design regulations and project quality acceptance standards formulated by the state and the Ministry of Railways.
3. Check the installation and commissioning of engineering equipment, as well as the signing of contracts for foreign equipment.
4. Check the implementation of the budget and the final financial accounts.
5. Inspect the joint debugging and joint test, dynamic test and operation test.
6. Check whether environmental protection, water protection, labor, safety, health, fire protection, disaster prevention safety monitoring system, safety protection, emergency evacuation channel, office production and living houses are completed and qualified according to the approved design documents, whether the retest of the precision measurement network is completed, whether the retest results and related materials are handed over to the equipment management unit, whether the machinery and standing materials are equipped in place according to the design, and whether the geological disaster remediation and building seismic fortification meet the regulations.
7. Check whether the preparation of the project completion documents is complete and accurate.
8. Check the property rights of construction land, the ownership of land, the ownership of land, the exact location of land, the legal procedures of land, etc.
-
Application for completion and acceptance of planning projects (outline).
First, the basic situation of the enterprise:
Second, the basis and main content of the project transformation.
1) The project filing or approval authority and document number, the implementation period of the record or approved project (2) the main content and total investment of the project construction (including equipment, civil engineering and other investment), the project construction objectives, and the project adjustment confirmed by the filing or nuclear unit.
3. Project implementation.
1) A brief review of the implementation process.
2) The date of commencement and completion of the project, and the actual completed investment (including the number of investment in equipment, civil engineering, etc.).
3) The implementation of the project and the original record or approval of the content of the significant changes or adjustments (4) environmental protection, fire protection, safety and energy saving, consumption reduction and land conservation (5) investment savings or overruns and reasons for analysis.
Fourth, the effect of the project after it is completed and put into operation.
1) Changes in product quality and technical level, promotion and application of new processes, new equipment and new materials (2) Economic benefits before and after the transformation of the project (illustrated with data), and it is expected that the annual output value and profits and taxes will increase after the project is put into operation.
3) The social benefits (including the contribution to environmental protection and employment) after the project is completed and put into operation, and 5) the experience or lessons learned from the implementation of the project.
Sixth, the overall parity of the project.
If you want to fill a new spring, you must get rid of the old water; If you want to get a rose, you have to give up the rose in your hand; To have a more unique experience, you have to have a little more trauma? >>>More
I skincare time is relatively late, I started skincare after the age of 30, at that time** has begun to sag, there are already spots on the face, eye bags are also very serious, I realized that I have been different from the original, youth is not there so from that time I realized how important skin care is, under normal circumstances, after the age of 25 to start using essence to skin care, because the molecule of the essence is very small, it can reach the basal layer of the first level, can play a role in firming and anti-aging.
The boot POST sound is when reading the memory, and it is generally a very short tick, indicating that the system is normal. The sound after it has nothing to do with the system self-test, it is generally the communication sound, you have the sound when the XP progress bar, but it has not entered the system, and this sound is not the system audio, so because it should be the interference sound, you can see if there is any interference source, such as wireless routing, Bluetooth devices, etc., I hope it can help you.
A total of three retirements.
Jordan shocked the world when he first announced his retirement in 1993. >>>More
Chinese chess has a long history. During the Warring States Period, there were already official records about chess, such as "Chu Ci and Spirituality"."Caster chess, there are six books; Divide and advance together, and force each other to be stronger; Become a lord and make a profit, call five white. >>>More