-
Answer]: Item BA is wrong, the owner's project management serves the interests of the owner, and its project management objectives include the project's investment objectives, schedule objectives and quality objectives. Item C is false, the schedule target refers to the time target used by the project, that is, the time target that was not used in the project delivery.
The quality objectives of the project are not only related to the quality of construction, but also include the quality of design, materials, equipment, and the quality of the environment that affects the operation or operation of the project.
-
Answer]: Start the car C
The test point involved in this question is the obscuration of the owner's project management. Owner's project management serves the interests of the owner, and its project management objectives include the investment objectives, schedule objectives and quality objectives of the project.
-
When the property service plan is formulated, the adjustment and analysis of the property project situation generally includes:
Hello dear, according to your question, you are provided with the following, for reference only: (1) Responsiveness. The content, format and bidding of the property management plan must respond to and comply with the provisions of the demand for property management services in the bidding documents (including the Q&A documents), and there can be no missing or missing items.
2) Needle sex. The specific implementation content of the plan must be formulated according to the basic situation and characteristics of the bidding property; The overall plan must be formulated on the basis of research and evaluation; The content of the plan must comply with the provisions of national and local laws and regulations. (3) Feasibility.
The substantive response to the requirements of the bidding documents in the plan must be fulfilled by the bidding enterprise, including various service commitments, work objectives and plans, and implementation plans for specific projects. (4) Reasonable and scientific friend-shouting. The development of property management service fees must be reasonable, and the specific implementation content should be based on meeting the needs of the tenderer (or owner) to develop a scientific design and economical plan.
-
Answer]: A cost target is an investment target for the owner and a cost target for the construction party, i.e. B is wrong. Safety management is the most important thing in the owner's project management, because safety management is related to personal health and safety, while investment control, schedule control, quality control and contract management mainly involve material interests, that is, mistakes.
Project management on the owner's side:
1) Safety management;
2) investment control;
3) progress control;
4) Quality control;
5) Contract management;
6) information management;
7) Organization and coordination, i.e. d errors.
-
Answer]: c
In the early stage of property management, the Property Management Regulations stipulate that the construction unit of the residential covered property shall select the property management enterprise through bidding and bidding, while the non-residential property construction unit does not have this requirement; At the same time, Article 54 of the Property Management Regulations stipulates that a special maintenance fund system shall be established for residential properties, while there are no mandatory provisions for non-residential properties.
For the time being, no matter what the upper limit of acceleration that humans can bear, it is based on the normal state, so the acceleration of the flying earth will always remain at the acceleration of gravity. >>>More
Reading makes me enjoy reading every day, and it's a feeling I'll never forget. Shakespeare once said, "Books are the nourishment of the whole world." Life without books is like the earth without sunlight; >>>More
Grasp the time and be the master of your own destiny What is time, it is the timer on the runway of my life, it is very responsible, and it completes the mission minute by minute. "Time is like water in a river, it can only flow away and not back." From the moment I was born, the timer of my life began a long journey. >>>More
Fluttering and sprinkling, one after another, like flying snow, like fluttering, "snowflakes" silently sprinkled from mid-air, falling on the podium, on the ground, on the teacher. For many years, the flying powder has dyed the hair of one teacher after another, and they have chosen the profession of teacher without regrets, imprinted their hearts on the two-meter blackboard, left their efforts on the three-foot podium, spent their thoughts on textbooks more than ten centimeters wide, and put their hopes on the "flowers" that grow taller day by day...... >>>More
Remember a blue umbrella.
My gaze has been tied up in a blue umbrella for so long...... >>>More