Why did K1562 stop opening in July?

Updated on society 2024-02-09
17 answers
  1. Anonymous users2024-02-05

    From July 1, 2014, a new train map will be implemented nationwide. In 1562, it was extended from the original Nanning to Wuchang to Fuyang in Anhui. The route is as follows:

    01 Nanning --08:40 --

    02 Liuzhou 11:52 12:10 18 mins 03 Yongfu South 13:

    20 13:23 3 min 04 Guilin 13:59 14:

    09 10 mins 05 Hung Yen North 14:52 14:56 4 mins 06 Jeonju South 15:

    29 15:33 4 min 07 Higashi Andong 16:17 16:

    30 13 min 08 Yongzhou 16:56 17:14 18 min 09 Hengyang 19:

    02 19:19 17 mins 10 Chalingnan 20:50 20:

    55 5 mins 11 Yanling 21:34 21:39 5 mins 12 Dragon City 22:

    01 22:06 5 mins 13 Jinggangshan 22:31 22:

    41 10 mins 14 Ji'an 23:50 23:55 5 mins 15 Jiujiang 04:

    56 05:05 9 mins 16 Anqing West 07:35 07:

    39 4 mins 17 Lujiang 08:26 08:31 5 mins 18 Hefei 09:

    41 09:59 18 mins 19 Huainan 11:09 11:

    15 6 mins 20 Fuyang 13:00 13:00 --

  2. Anonymous users2024-02-04

    Nanning Railway Bureau issued an announcement on April 9 that from 0:00 on April 10, Nanning-Wuchang K1562 canceled Litang and Laibin stops.

  3. Anonymous users2024-02-03

    Hello dear <>

    <> answer to your question is as follows: There may be a variety of reasons for the sudden suspension of the K1256, and here are some possible explanations and information on the expansion of the socks. 1.

    Maintenance and overhaul: Vehicles in operation require regular maintenance and overhaul to ensure safety and proper operation. If the K1256 vehicle breaks down or requires scheduled maintenance work, the operator may temporarily suspend the operation of the vehicle to carry out necessary repairs and maintenance.

    2.Scheduling changes: The bus or transportation company may make scheduling changes to the train number according to actual demand.

    This could include optimizing routes, adding or decreasing operating vehicles, etc. If there is a change in the route or operating hours of K1256, it may cause the train to be suddenly suspended. 3.

    Weather or Bad Conditions: Adverse weather conditions, such as heavy rain, ice and snow, etc., may affect the normal operation of vehicles and road safety. In order to ensure the safety of passengers and traffic participants, the operator may decide to suspend certain trains.

    4.Provisioning: Sometimes, transportation companies may allocate resources based on factors such as passenger flow, capacity demand, and so on.

    If there is another emergency or need on the route where K1256 is located, the operator may temporarily suspend the service to meet demand elsewhere. 5.Temporary Events:

    Emergencies, such as traffic accidents, road closures, construction, etc., may lead to the temporary suspension of some trains. These events are often unavoidable, so the operator may decide whether to suspend the relevant trains or ruin them depending on the circumstances. In addition, it should be noted that the above are some common situations, and the actual reasons may vary depending on the specific situation.

    If you are confused about the specific reason for the sudden suspension of K1256, it is recommended to contact your local transportation company or relevant authorities to find out. They can provide accurate information and explanations and provide you with the necessary help and advice so that you can get a satisfactory response.

  4. Anonymous users2024-02-02

    The reason why K1573 is suspended is entirely because the railway transportation department has specially called for the deployment of all the line cars of the Spring Festival in order to cope with the arrival of the return peak before the Spring Festival, so the suspension of operation has been temporarily implemented.

  5. Anonymous users2024-02-01

    March 26-29, 2021 railway information, no K1573 K1572 suspension information.

  6. Anonymous users2024-01-31

    The development of the country. Elimination is a must.

  7. Anonymous users2024-01-30

    This train is operating normally today, but tickets for some stops have been suspended! In addition, the train has been operating normally recently!

  8. Anonymous users2024-01-29

    Is the K1572 train suspended? Are trains suspended? It is necessary to refer to the official news released by the railway, or log in to 12306** to inquire.

  9. Anonymous users2024-01-28

    Is the K1572 train suspended? Whether the train is suspended or not depends on the official news released by the railway, or you can log in to 12306** for inquiries.

  10. Anonymous users2024-01-27

    Summary. Dear, it's like this, the train transport organization has been adjusted

    Dear, it's like this, the train transport organization has been adjusted

    Therefore, it has been suspended since March 2022

    Ask about custom messages].

  11. Anonymous users2024-01-26

    As of 2021, there is no outbreak.

    K1156 1157, K1158 1155 train is a fast train between Chengdu City, the capital of Sichuan Province and Shanghai, which was opened on August 28, 2011, and is now responsible for passenger transport tasks by the Chengdu Railway Bureau Chengdu Passenger Section Shanghai Second Team. The train uses 25G coaches.

    It runs along the Suicheng Railway, Chengcheng Railway, Xiangyu Railway, Handan Railway, Xiaoli Railway, Ningxi Railway, Huainan Railway, Ningtong Railway and Beijing-Shanghai Railway, with a journey of 2,173 kilometers, passing through six provinces and one city of Sichuan, Shaanxi, Hubei, Henan, Anhui, Jiangsu and Shanghai. Among them, Chengdu Station to Shanghai Station runs for 30 hours and 11 minutes, and the number of trains used is K1158 1155 times, and the number of trains used from Shanghai Station to Chengdu Station is 29 hours and 45 minutes, and the number of trains used is K1156 1157 times.

  12. Anonymous users2024-01-25

    There is no suspension of this train, and it has recovered after the epidemic, so you can go and take it, rest assured

  13. Anonymous users2024-01-24

    The day after tomorrow will be on the second day, wait.

  14. Anonymous users2024-01-23

    k1561

    Hefei 31:11 min.

    Ticket reservations are on the go.

    The next day is 13:46

    Nanning. <>

  15. Anonymous users2024-01-22

    For the train K1240 from Zhengzhou to Wenzhou, the train 12306 is out of service as of February 9, 2020.

  16. Anonymous users2024-01-21

    As of May 14, 2020, the official website of China Railway 12306 shows that the train timetable has been adjusted, sales have been suspended, and the K1616 train is in a state of suspension. The K1616 fast passenger train runs from Chengdu to Yinchuan, with a total distance of 1,842 kilometers and a running time of 30 hours and 15 minutes.

    Legal basis: Railway Law of the People's Republic of China

    Article 33 The railway development plan shall be formulated in accordance with the needs of national economic and social development and national defense construction, and shall be coordinated with other modes of transportation development planning.

    Article 34 The construction plan of local railways, special railways and special railway lines must conform to the national railway development plan and obtain the consent of the competent railway department or the agency authorized by the competent railway department.

    Article 35 Within the scope of the urban planning area, the planning of railway lines, stations, hubs, and other relevant facilities shall be included in the overall plan of the city where it is located.

    The planning of land for railway construction shall be included in the overall land use plan. The land needed for long-term expansion and new railways shall be arranged by the people at or above the county level in the overall land use plan.

  17. Anonymous users2024-01-20

    Legal analysis: February 13, 2020 Nanning K1562 3 2 times from February 3 to February 8, 2020, Hefei K1561 4 1 times suspended.

    Legal basis: "Regulations on the Operation and Management of Urban Rail Transit" Article 5 The competent department of urban rail transit operation shall comprehensively consider the connection with urban planning, the passenger flow demand of urban rail transit, the operation safety guarantee and other factors in the stage of soliciting opinions on the planning and construction plan of urban rail transit, and put forward opinions on the layout and scale of the line network, transfer hub planning, construction timing, resource sharing, construction of the integrated emergency command system of the line network, line function positioning, line standard, system scale, traffic connection, etc. The competent department of urban rail transit operation shall put forward opinions on passenger flow, system design and transportation capacity, driving organization, operation management, operation services, operation safety, etc. at the stage of compiling and approving the feasibility study report and preliminary design documents of urban rail transit projects.

    Opinions on Further Strengthening the Management of Urban Rail Transit Planning and Construction》 Strictly enforce the conditions for the construction of the subway, improve the relevant economic indicators of the subway and light rail, and adjust the general public financial budget revenue and regional GDP of the city to 30 billion yuan and 300 billion yuan respectively. Improve the quality of construction planning, strengthen the connection and integration of urban rail transit and other modes of transportation, and encourage the exploration of comprehensive development and utilization of aboveground and underground space. Strict construction planning approval and review procedures to ensure that the scale of construction matches local financial resources.

    Strengthen the guiding and restraining role of construction regulations and collapse plans, and the construction plans that have been approved by the state shall not be changed in principle, and further clarify the conditions for planning adjustment and a new round of construction plan approval.

Related questions
6 answers2024-02-09

Before you ask your question, I would like to say a few other things about "camping in the wilderness". >>>More

11 answers2024-02-09

Auspicious Reminder--- Your Zodiac Sign* *Year Category: Wuchen 壬戍Male 1982 壬戍 Born on April 28 (lunar calendar), Female 1988 Wuchen born on March 20 (lunar calendar). >>>More

9 answers2024-02-09

I completely exploded, believe it or not, the small pepper quad-core version, 999 yuan, the lowest price in the world. >>>More

10 answers2024-02-09

In July, ah...The continent is hotter than the ocean, the continent has low pressure, and the ocean is high pressure. >>>More

24 answers2024-02-09

Celery, greens, radish, cauliflower, carrots, coriander, green onions, lettuce, asparagus, beans, eggplant, tomatoes, cucumbers.