Side station supervision record model water conservancy engineering construction project constructi

Updated on society 2024-03-11
12 answers
  1. Anonymous users2024-02-06

    Just follow the questions prompted, don't think too complicated.

    The main materials are the main materials used in the construction of the side station, when they entered the site, how much was used, and how much was left.

    The question raised by the contractor is that the contractor has any problems with the supervising party in the side station, and if there is any, there is no record.

    The construction process is the description of the construction process.

  2. Anonymous users2024-02-05

    Material entry and usage: commercial mix into the site x square, actual use of x square.

    The question raised by the contractor: If there is a reality, it will be written, and if it is not, it will not be written.

    Construction process: copy the construction plan of your project.

    The instructions or replies issued to the contractor: check the key points of concrete construction control, find a few, and write down the requirements for the contractor to do what to do.

  3. Anonymous users2024-02-04

    The entry and use of main materials: all kinds of raw materials required for concrete are qualified for testing, and the storage capacity meets the construction needs.

    Questions raised by the contractor: None.

    Construction process :* start pouring, ** pouring completed. (There must be the main data of concrete detection, such as: slump, temperature, etc.).

    Instructions or replies to the contractor: on-site verbal instructions: strengthen vibration, pay attention to safe construction. Reply: The site has been carried out as required.

  4. Anonymous users2024-02-03

    2. The entry and use of main materials: 75 m3 of stone, 45 m3 of sand, 25t of cement, t of admixtures (in short, converted according to the mix ratio or calculated by actual records).

    3. Questions raised by the contractor: None. (If the problem is raised, the specification is recorded) 4. The construction process:

    JZC350 mixer mixing, 2 small loaders horizontal transportation, chute vertical transportation into the warehouse, manual liquidation, plate vibrator vibrating and compacting, artificial sand board collection.

    5. Instructions or replies to the contractor: none. (If there is a reply or instruction, the speech record must meet the requirements of the specification, and the instruction and reply construction unit should be closed).

  5. Anonymous users2024-02-02

    Summary. As a true record of the supervision work of the side station, the side station record should be different from the "supervision log", therefore, in addition to the record in the supervision day, it should also be recorded separately for future reference.

    The side station record of the supervision personnel is reviewed by the professional supervision engineer or the chief engineer through the review of the side station record, from which the key parts or key processes can be grasped, and the problems that arise, analyze the causes, formulate measures to ensure the quality of the key parts or key processes, and this is also the responsibility of the supervision work.

    The supervisor shall regularly sort out the records of the side station and report to the construction unit for review. A good side station record can not only enable the construction unit to grasp the dynamics of the project, but more importantly, to enable the construction unit to understand the supervision work, understand the service tenet and service direction of the supervision unit, and establish a good image of the enterprise, at the same time, the supervision personnel can also listen to the opinions of the construction unit, improve the supervision work in a timely manner, and improve the quality of service.

    Water conservancy project - steel formwork installation supervision side station record writing template?

    Hold on. As a true record of the supervision work of the side station, the side station record should be different from the "supervision log", therefore, in addition to the record in the supervision day, it should also be recorded separately for future reference. The side station record of the supervision personnel is reviewed by the professional supervision engineer or the chief engineer through the review of the side station record, from which the key parts or key processes can be grasped, and the problems that arise, analyze the causes, formulate measures to ensure the quality of the key parts or key processes, and this is also the responsibility of the supervision work.

    The supervisor shall regularly sort out the records of the side station and report to the construction unit for review. A good side station record can not only enable the construction unit to grasp the dynamic bend of the project, but more importantly, enable the construction unit to understand the supervision work, understand the service tenet and service direction of the supervision unit, and establish a good image of the enterprise.

  6. Anonymous users2024-02-01

    How to write the description of the construction process in the record of the supervision side station?

    Your spring shirt is good 1, time, place, and the part of the concrete disadvantages. 2. On-site construction preparation, standby vibrating rod, emergency lighting, etc. 3. Check the mix ratio of concrete, the certificate of qualification, quality assurance and retest report of raw materials such as sand and gravel cement. 4. Check the retention and collapse degree of the test block 5. Check whether the elevation of the concrete surface is in place.

    Checked by wiring. 6. Problems found by the supervision: in the place where the post-pouring forest burning belt is poured, whether the concrete vibration is in place, whether the position of the waterstop is correct, whether there is damage, etc.

    Is there any matter of adding water to the concrete car without permission. Whether the steel bar has been trampled and sunk, etc. 7. Whether there are personnel on site to look at the mold and see the steel bar, and deal with emergency matters.

    If the steel bar of the mold burst and the canopy has sunk down, after the concrete edge column is poured and pounded, it should be checked and corrected in time to adjust the deviation.

  7. Anonymous users2024-01-31

    I have a template how to send it to you?

  8. Anonymous users2024-01-30

    The main contents of the side station supervision are:

    1. Side station project;

    2. A brief description of the construction process;

    3. The working situation of the side station;

    4. Main record data;

    5. Find problems and deal with them.

  9. Anonymous users2024-01-29

    General writing: construction site, construction content, construction machinery, construction personnel, material use, testing, safety situation

  10. Anonymous users2024-01-28

    The system requires that the supervisors should supervise the construction process of important project quality and key safety control, and there are three main contents of the supervision record: 1. The basic requirements of the construction process, machinery, personnel, and construction organization are described, and some items are written. 2. Describe the supervision process of the side station, record what happened in the construction process, if there are violations or special events should be recorded, and there is no normal construction to write.

    3. For the situation recorded in 2, make a closed description, all of which are written, and there is an objective and consistent with the facts.

  11. Anonymous users2024-01-27

    (5) Random witness sampling to do concrete test block group, temperature (average temperature) 2, supervision, record the measured cement, the number of vibrating rods, and the processing opinions to notify the on-site quality inspector in a timely manner Construction situation (1) Concrete strength grade: clear, look at the steel bar: pouring concrete cubic meters (2) concrete ** mode, template deformation:

    Plane position (axis interval). 6: Pumping concrete (or tower crane hopper), causing concrete mud to flow, duty personnel 4) concrete pouring and pounding sequence is not continuous.

    7. Take measures; (3) It was found that there was an expansion mold; (2) Inspection records: on-site quality inspector or post foreman on duty; (2) It is found that the position of the reinforcement is too large or the floor reinforcement collapses seriously or the thickness of the concrete protective layer is not well controlled somewhere, and the stone and climate side station supervision record is filled in the key points of the side station supervision record The main structure of the concrete pouring and smashing 1, shear wall and sand, affecting the pouring or blocking of the pipe. 3;(6) Heavy rain during the pouring process: in line with the requirements of the construction plan, vibration leakage may occur; (5) The concrete is too thin or too dry.

    or a class leader; (8) When stirring on site, the template person; (4) Observe the position of the steel bar in the pouring process, and the vibration strength is not enough somewhere: commercial concrete (or on-site mixing concrete) (3) The mechanical equipment used, the construction unit is on duty on the same day to sign, name: column, the connection between the old and new concrete is not good:

    Pouring people. 4. Rectification in place, rainproof measures are not effective, beam: 3) Check the pouring method and find problems (1) The concrete mix ratio is inconsistent with the design mix ratio, the weight of water and admixtures, and the concrete pouring and smashing of plates; The concrete vibrating sequence is not good; (6) Observe the workability of concrete.

    5. It is strictly forbidden to add water on site, and the collapse degree of the concrete is mm; The debris at the joint is not cleaned up; (7) to the commercial concrete mixing station spot check computer ratio unit: Taiwan (4) the number of construction personnel, slurry leakage: the whole process of side station supervision (1) check the concrete mix ratio notice and feeding list, rain, pouring well (or problematic), spot check the concrete batching measurement, floor (or elevation) component name, location or process.

    or notify the project department in writing to rectify.

  12. Anonymous users2024-01-26

    1. Supervise the content of the log.

    The content must be recorded on a daily basis; Date, weather, construction site and work content, number of workers, main equipment and materials used, etc., mark the start and completion of the main sub-items.

    The content of the daily major event record;

    During the construction process, patrol inspection and side station supervision, witness sampling.

    Materials, equipment, components and main construction machinery and equipment entry and acceptance records.

    Construction survey pay-off, project inspection and acceptance results.

    The information of the construction unit is submitted for review and the results of the review.

    Matters related to the handover of construction drawings and engineering changes.

    The main content of the supervision notice (written and oral) issued and the person who issued it and who issued it.

    Relevant matters and handling opinions put forward by the construction unit.

    Relevant matters and handling opinions raised by the construction unit.

    Relevant matters agreed upon at the site meeting and related issues identified in coordination.

    Engineering quality accidents (defects) and treatment plans.

    Abnormal events (events that may lead to claims) and their impact on the construction are related matters related to the arrival of designers on the construction site and handling and support.

    Quality supervision personnel and relevant leaders come to the site to inspect, guide the work and relevant instructions.

    Other important matters are recorded.

Related questions
11 answers2024-03-11

1. Construction: precast concrete, concrete strength grade C30, impermeability grade P8, mix ratio number 200T-0148; A car pump was used for concrete construction on site. >>>More

10 answers2024-03-11

Look at the backfill thickness. The compaction check meets the design requirements.

13 answers2024-03-11

Side station: Specifically, it refers to the whole process of on-site supervision activities implemented by supervisors on the construction quality of key parts or key processes. Duty. >>>More

8 answers2024-03-11

Agricultural machinery supervision station belongs to administrative law enforcement agencies, not administrative organs. >>>More