Cracks in the walls, level of the roof, window switches, etc.
-
The inspection of the building must be clear about its related matters, so as to avoid unnecessary things in the later stage. The following will introduce to you the details and precautions of the steps of the house inspection.
What are the steps and precautions for repossession and inspection.
2. Wall: Use tools to check whether the wall and ceiling are bulging or dented.
3. Housing area: Use a tool to measure whether the actual area is the same as the area value agreed in the contract.
4. Water circuit: check whether the drainage is smooth, and use a pen to detect the circuit to prevent the circuit from burning in the later stage.
What is the closing process?
1. When the commercial housing has reached the conditions for receiving, then the developer will notify the owner to hand over the house, generally speaking, the delivery time of the contract shall prevail, when the owner deliberately does not handle it, then on the second day of delivery, this will be regarded as automatic delivery, and the risk generated at this time is also borne by the owner.
2. After the owner receives the delivery notice, he should also look at the purchase contract, so as to know which aspect the developer needs to be responsible for, and cannot be taken away by the developer, or the final loss is personal interests.
3. When confirming some processes when handing over the house, generally speaking, you will go to the real estate to sign in, and then start to inspect the house. When handling the delivery of the house, it is also necessary to bring the relevant materials, and the money must be brought slowly, so as not to waste time.
4. When inspecting the house, the details should also be paid attention to, first measure the indoor area to see if it is the same as the developer, and also look at the position of the wall, ground and ceiling, whether there are some cracks, you can ask the developer to make up.
-
The inspection must be careful, first of all, to check whether there are cracks in the surrounding walls, secondly, to confirm that there is no security problem with the door lock, and finally, to ensure that the formaldehyde inside has completely disappeared.
-
It should be noted whether the hydropower has been done well, and some of the agreed matters in the contract have not been completed. The most important thing is to check if there are any quality problems in the house.
-
It is necessary to pay attention to whether the relevant items or home items agreed in the contract are in place, or whether the use of electrical appliances is normal, and it is necessary to ensure that the ethics described in the contract are the same.
-
When handing over the keys to a new house, if you want to effectively inspect the house, you must ask relevant professionals to check the exterior of the house including paint, tiles, corridors, and conduct a detailed inspection, and then look at the internal doors and windows, walls, doors, floor tiles, water and water, wall tiles, heating, smoke exhaust, ventilation gas, etc., and also do relevant closed water tests.
-
Bulging and cracks on the wall are easy to see, and the impact on the wall is very large. Circuit checking is also very necessary and will reduce a lot of unnecessary trouble.
-
The charge should be checked to check how well the water and electricity work is done, as well as whether the waterproof work of the bathroom is in place, whether there are cracks in the floor, and whether the wall is flat, which will be more comprehensive and not easy to make mistakes.
-
1. After checking the solidity of the exterior wall tiles of the complete building, whether the unit door is complete, the safety of the stairs and the common equipment of the staircase, open the door. 2. Check whether it is in line with the contract. Write down the water meter, electricity meter number, building height, toilet pit distance, bathtub length and width, shower room size, and ceiling height.
Check whether the roof is crooked, you can take 4-5 points on the roof and measure it with a box ruler, if the values are together, there is no skew.
-
In our lives, many people will buy a house, but after the developer gives the key, we need to go through a certain method to inspect the house, and I will introduce it to you next.
First of all, we must know that the house inspection is not to see how the decoration of the house is, but to check the load-bearing capacity of the wall, to know that many walls are hollow, if you live in such a house, it is likely to lead to the load-bearing capacity of the house wall, so there will be a collapse, which is still a certain threat to our lives. In addition, we also have to check the entrance door, to know that the entrance door is installed by the developer for us, at this time we must open the door several times to see if there are some abnormal noises or gaps, which can help us understand the situation of the door, if there are gaps for a long time, the temperature of our home will be very cold, and this can also reflect the poor sealing. Secondly, we must take a look at whether there is a hollow drum or water leakage, which has a great impact on our lives, and we also have to check the size of the house, whether it is the same size as the one we bought?
In addition, we also have to see whether there is any defect, to see whether the width of the glue around the door is the same, because some door openings may leave us large, so we will use glue to help us make up, but in the later stage, the glue will be opened, but also to check the hydropower, hydropower is also very important for us, if the installation of hydropower is unreasonable, then our daily life of water, electricity will be inhibited.
Finally, I want to say that many people are not very good at house inspection, at this time we try to find a professional to help us inspect the house, not only to understand the overall situation of the house well, but also to let the developer help us change according to some unreasonable places, so as to protect our own rights and interests.
-
When the house is inspected, doors and windows are a key point. For example, if the entrance door is not qualified, it may not close tightly, there may be a sound during the opening process, or it will be automatically moved, etc. And if the windows are not tight, there may also be a lot of problems.
Therefore, when we accept the house, we must focus on the acceptance of doors and windows. For the acceptance of the house, there is also a very important one, that is, the acceptance of water and electricity. In fact, for the acceptance of the rough house, it is possible that we are not particularly careful in the acceptance.
But at least it has to meet our use function. We first have to look at whether the layout of the indoor distribution box has a master switch and whether there are sub-switches for each circuit. Then the air switch and leakage protection switch are configured as required.
After that, we can find an electroscope to test the sensitivity of the switch. For example, we can find a phase detector and use its short-circuit button to press it to see if the leakage switch trips, so as to detect whether it can trip normally.
-
You should look at the windows in the new house, you should look at whether the opposite side is flat, you can also check whether there are cracks in the wall, or whether the stairs are smooth and whether there are defects. You can also use a long ruler as an aid, or buy a special straight ruler.
-
You should find a professional to inspect the house, understand the knowledge of the house inspection, pay attention to the condition of the wall, and pay attention to the structure and lighting when inspecting the house.
-
Use a long ruler close to the wall and ground to check whether the floor is flat, check whether there are cracks on the wall, whether there are exposed steel bars, and check whether the doors and windows are closed flexibly.
-
Doors and windows. Open and close the door several times, listen to whether there is any abnormal noise, and then clip the prepared A4 paper to the top of the door lock and close the door to see if the paper is clamped. If it is not clamped, it must have a poor seal.
Look at the bottom of the entrance door and the door frame for foreign objects and garbage. It's the delivery and acceptance season again, and the decoration whites are helpless, they don't know anything about the house, don't think that they don't have to worry about anything if they buy a house. Some owners have inspected the house, and the house is still the same house, and there is no hollowness or water leakage.
And some owners have inspected the house, not to mention hollowing and leaking.
There are two main categories of house inspections when turnkey, rough house acceptance and hardcover house inspection. Next, I will first talk about how to accept the rough house, first inspect the entrance door, check whether there are scratches, bumps, paint peeling, and deformation on the surface of the door leaf and door frame. Whether the sealing and anti-collision rubber ring on the door leaf and door frame are complete and defective
Look at whether the width of the glue around the door is the same, some door openings are left big, and then the door is pressed, and the glue is patched by gluing, so that the glue will be very large and obvious. In the later stage, the glue will open if it is too wide.
1.Check whether the purchase is consistent with the actual location, the current housing management department has a contract signed online, generally**This will not have major mistakes, the errors are mainly concentrated in the location of parking spaces and storage rooms, many storage rooms and parking spaces are not property rights, and they are not signed in the contract, I think, the words are not rough, although now everyone's awareness of buying a house to protect their rights has been significantly improved, but due to the lack of professional knowledge, it is impossible to accurately judge whether the quality of the house is passed, and the current level of the home inspector team is uneven, There is a gap in the regulatory field, the house inspection market is chaotic, and major decoration companies and online platforms have played "Free home inspectionsPublic welfare home inspectionAs an advertisement for the masses who do not know the truth.
Buying a house is a major event in life, and we must accept the house when handing over the house. Before that, be sure to understand the corresponding steps and precautions for home inspection, rather than going around and looking around. When we receive the notice of occupancy, we will inspect the property on the agreed date.
-
When inspecting the house, we must check the quality of the decoration, and when inspecting the house, we should also observe whether the doors and windows are tight, and we should also observe whether the water and electricity lines are laid in place, and we should also understand the situation of electricity and water.
-
It is better to ask a professional, a more knowledgeable person, to measure the hollow drum rate of the wall, to check the floor tiles, to check the water and electricity, to check the actual usable area, to check the air quality.
-
The first thing you should check is the water and electricity problems of the house, the other is the door and window problems of the house, and finally look at the floor and other places.
-
1. Don't ignore safety guardrails: The "Residential Building Code" stipulates that "the net height of residential balcony guardrails with six floors and below shall not be less than meters, the net height of balcony guardrails of residential buildings with seven floors and more than seven floors shall not be less than meters, and the spacing of vertical rails shall not be greater than meters". At present, most of the balconies are fully enclosed floor-to-ceiling windows, although the glass has a certain safety, but according to the design specifications must be installed guardrails.
The distance between the vertical poles of the guardrail should not be greater than meters, in order to prevent children from drilling out between the vertical poles of the guardrail, thus creating a danger. 2. The culture of opening inside and outside the entrance door: Article 1 of the "Code for Fire Protection Design of Buildings" clearly stipulates that "the door of a high-rise residential building should not be opened directly to the front room, and when there is a real difficulty, some of the doors open to the front room are Class B fire doors".
This is to protect the high-rise building....
-
When sending the house, we should first look at the walls for bulges or depressions. We can knock on the wall with a wooden stick to see if there is an empty sound. It is also necessary to check if the ground is flat or uneven.
If the quality is not up to standard, it needs to be reworked. The developer shall notify the buyer in writing to hand over the dwelling within the agreed time. The lessor shall hold the documents and other relevant materials required by the Notice of Occupancy, and within the time limit required by the Notice of Occupancy, go to the place designated by the real estate development enterprise to inspect the documents that the real estate development enterprise shall obtain in accordance with the law.
These two books refer to the "Residential Quality Assurance Certificate" and the "Residential Operation Manual", and the first table refers to the "Completion Acceptance Record Form". Verify the area, new home sale contract, and issues with excess refunds and ** undercompensation. Confirm whether the drawings attached to the sales contract of the new house are consistent with the actual situation, whether the structure of the new house is consistent with the original design drawings, whether the area of the new house has been measured by the real estate department, and whether there is any difference between the area signed with the new house contract.
If the commercial housing does not meet the conditions for check-out or does not meet the agreed standards, the buyer may submit in writing to the real estate development enterprise the quality problems of the commercial housing or the contents that do not meet the agreed standards, and the real estate development enterprise shall repair or compensate for each item within a certain period of time. The acceptance of doors and windows mainly depends on the strength and firmness of the doors and windows, as well as whether the sliding doors and windows are smooth.
At the same time, check whether the doors and windows have obvious gaps with the door frame and window frame when closed, or whether the closure is not tight. Doors and windows are easy to be scratched during installation, so when accepting doors and windows, it is also necessary to see whether the scratches or fractures are serious, and whether the door and window frames are bent and other damage phenomena. People always pay attention to the safety of electricity, so when the house is inspected, we must check whether the settings of the switches and sockets are complete and whether the circuit is unblocked.
It also depends on whether the switches and sockets are installed in a convenient location for our daily use. Check that each switch and light is working properly to make sure each light is on properly. Describe the structural performance of the dwelling and the types, performances, and standards of each part.
At the same time, it is pointed out that the developer does not assume warranty liability for quality problems caused by improper use of the house or unauthorized change of structure, equipment location, and improper decoration. This is a regulation formulated by the Ministry of Construction to protect the rights and interests of consumers.
-
It is necessary to see whether the walls of the house are complete, whether the doors and windows are firmly installed, whether the quality is qualified, and verify the area of the house and the price of the supplementary payment or refund, and then go to the property to check the relevant information to see whether the structure of the house is reasonable.
Dreaming of a building, the building is a symbol of men, and dreaming of looking up at tall buildings indicates longing for men. >>>More
Finally handed over the house, I believe many people are very excited, thinking that they can decorate and move in after taking the key. In fact, there are many problems that need to be paid attention to when handing over the keys to the house, otherwise you will be responsible for what goes wrong in the later stage. Let's take a look at what you need to pay attention to when handing over the house and getting the keys. >>>More
Whether to pay the heating fee in the first year of the new building, this situation is generally calculated according to the proportion of the length of the heating period and then pay the heating fee at a 6% discount, you can fight with the developer, and the heating fee can be reimbursed. >>>More