How to handle fire protection approval if there is no housing completion acceptance file

Updated on society 2024-03-31
12 answers
  1. Anonymous users2024-02-07

    The application materials are all photocopies, and the originals must be provided for inspection.

  2. Anonymous users2024-02-06

    No, the original must be original.

  3. Anonymous users2024-02-05

    No, theoretically, there is no construction permit, and construction cannot be started, so the quality inspection station will not come to accept.

  4. Anonymous users2024-02-04

    If the units have not completed the acceptance work, the commercial housing is unable to apply for the real estate certificate. In this case, it can be regarded as a breach of contract by the developer, and it can be required to give an explanation and make a compensation bureau.

  5. Anonymous users2024-02-03

    After the completion of the project, the construction unit shall conduct a quality inspection of the project, confirm that it meets the requirements of the design documents and the contract, fill in the "Project Acceptance Report", and sign it by the project manager and the person in charge of the construction unit.

    After receiving the "project acceptance report", the supervision unit should comprehensively review the acceptance data of the construction unit, sort out the supervision data, conduct quality assessment of the project, and submit the "project quality assessment report", which should be reviewed and signed by the director and the person in charge of the supervision unit.

    The survey and design unit shall inspect the survey and design documents and the design change notice signed by the design unit during the construction process, and submit a written "quality inspection report", which shall be reviewed and signed by the person in charge of the project and the person in charge of the unit.

    The construction unit organizes the supervision, design and construction units to conduct preliminary inspection and acceptance of the project quality. All parties put forward rectification opinions on the existing problems, and the construction unit fills in the rectification report after the rectification is completed, and the supervision unit and the supervision team verify the rectification. After passing the initial inspection, the construction unit shall submit the "Project Completion Report" to the construction unit.

    After the construction unit receives the "project completion report", the relevant personnel of the organization design, construction, supervision and other units shall set up an acceptance group, and the members of the acceptance team shall have the corresponding qualifications, and the acceptance plan shall be prepared for the larger scale or more complex project.

    The construction unit presides over the completion acceptance meeting and organizes the acceptance parties to inspect the quality of the project. If there is a quality problem, put forward rectification suggestions.

    The supervision department supervisors go to the site to supervise the organizational form, acceptance procedures, and implementation of acceptance standards for the completion and acceptance of the project.

    The construction unit shall carry out rectification in accordance with the rectification opinions put forward by the acceptance parties and the "Notice of Rectification Order", and after the rectification is completed, write out the "Rectification Report", which shall be sent to the quality supervision station after being signed and sealed by the construction, supervision, design and construction units, and the supervisors shall participate in the review of the important rectification content.

    For unqualified projects, according to the "Unified Standards for Acceptance of Construction Quality of Construction Projects" and other acceptance specifications, after rectification, re-acceptance until qualified.

    Promote social justice, highlight legal values, maintain personal dignity, I am very happy to serve you, if you have any questions, come to the platform for consultation I wish you all the best! Have fun!

  6. Anonymous users2024-02-02

    According to the relevant provisions of the "Building Regulations", residential buildings do not need to apply for fire protection acceptance.

    Commercial and residential buildings must be recorded.

  7. Anonymous users2024-02-01

    The inquiry of project completion acceptance can be done in the following ways:

    1. The developer will deliver the completion acceptance report to the owner, if not, it will not pass the acceptance.

    2. Go to the window of the construction committee of the administrative examination and approval hall at or above the county level or above to inquire about the project is enough to go through the completion acceptance filing procedures.

    The local people's construction department at or above the county level shall be responsible for the completion and acceptance of the project within its administrative area. The completion record form shall be issued by the local Housing and Urban-Rural Development Bureau.

  8. Anonymous users2024-01-31

    It should be the housing authority, after the house is sold, if it is filed with the housing authority, the developer will have to pay a breach of contract fee for delaying the delivery of the house.

  9. Anonymous users2024-01-30

    Go to the quality supervision station of the local county and municipal housing and urban-rural development bureau to check that the building that is accepted is for the record registration.

  10. Anonymous users2024-01-29

    The developer shall, in accordance with the purchase contract, hand over the commercial housing that meets the conditions of use to the buyer. Generally, the sign of the developer's delivery is to obtain a large property certificate. At the same time, the buyer shall be provided with the "Residential Quality Assurance Certificate" and the "Residential Instruction Manual".

    If the contract stipulates that the house can be delivered after the completion and acceptance, you only need to ask the developer to do things according to the contract. If he refuses to show it, you can refuse to take over the property, and if the agreed delivery date is exceeded, the developer should be liable for breach of contract.

  11. Anonymous users2024-01-28

    Go to the quality supervision department under the jurisdiction of the local Housing and Urban-Rural Development Commission.

  12. Anonymous users2024-01-27

    The application materials submitted by the applicant shall be provided in sets according to the classification of departments.

    1) Materials required by the competent departments of urban and rural construction.

    1. One copy of the "Application for the Completion and Acceptance of Construction Projects" (original);

    2. One copy of the "Opinion on the Completion and Acceptance of Construction Projects" (original);

    3. One copy of the "Construction Drawing Design Document Review Report" (copy);

    4. "Acceptance Opinion of Construction Project Files" and 1 copy of file transfer (present the original and receive a copy);

    5. One copy of the "Project Completion Report" issued by the construction unit (original);

    6. One copy of the "Project Quality Evaluation Report" issued by the supervision unit (original);

    7. One copy of the "Survey Document Quality Inspection Report" issued by the survey unit (original);

    8. One copy of the "Design Document Quality Inspection Report" issued by the design unit (original);

    9. One copy (copy) of the "Project Quality Warranty Certificate" issued by the construction unit;

    10. One copy of the certificate provided by the construction unit that the construction unit has paid the project price according to the contract (original);

    11. 1 copy of the "Comprehensive Evaluation Form of Building Energy Efficiency Evaluation and Labeling" (original) 12. 1 copy of the "Chongqing Real Estate Development and Construction Project Manual" approved by the administrative department of real estate development (original);

    13. One copy (copy) of the "Instruction Manual and Quality Assurance Certificate for New Commercial Housing" shall be provided for the commercial housing project;

    14. Municipal infrastructure projects should also provide 1 copy (copy) of relevant quality inspection and functional test data.

Related questions
6 answers2024-03-31

The property needs to be filed and registered during the transaction. >>>More

5 answers2024-03-31

A co-owned property is a property that is jointly owned by two or more owners, and these owners are called co-owners of the home. "Jointly owned property" can be divided into co-ownership and co-ownership according to the circumstances in which it was formed. >>>More

9 answers2024-03-31

Real estate and other immovable property must be registered and obtained a property right certificate to belong to legal property rights, and the real estate of shops is real estate, and only a real estate certificate must be registered in accordance with the law to belong to legal property rights. Otherwise, there will be restrictions on seeking legal protection in the event of adverse consequences. >>>More

45 answers2024-03-31

No. I used to hear the story of "BMW and Bicycle" when I watched "If You Are the One", and many people criticized the reality of that girl at that time, and I was one of them at that time. >>>More

24 answers2024-03-31

If your marriage values material things, don't get married, because a boyfriend who doesn't have a house may not be able to afford it in the future, or it will cost you a lot when you pay off the mortgage, but if you value love, then marry him.